Version history — Pueblo, Colorado
This is PermitBase’s own verified record for Pueblo, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Pueblo’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-14Current record
- 2026-08-02Superseded
- Pueblo, Colorado — Commercial Building Permit (New Construction / Addition) record added
- Pueblo, Colorado — Commercial Tenant Improvement / Alteration Permit record added
- 2026-07-23Superseded
- Pueblo, Colorado — Residential Building Permit (New Construction) fee record added: New Residence — Finished Existing Basement ($19.50 per square foot)
- 2026-07-20Superseded
- Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) fee record added: General valuation-based permit fee (Table B) — applies to a standalone EV charger circuit addition (not a Table C fixed-fee category) (Up to $500 valuation: $33.08 flat. $501-$2,000: $33.08 for the first $500 plus $2.21 per additional $100 or fraction thereof. $2,001-$25,000: $66.15 for the first $2,000 plus $9.92 per additional $1,000 or fraction thereof.)
- Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) fee record added: SoCoBD Residential Electrical Only Permit (Table C) — Upgrade/Replace Service (if the charger install requires a service/panel upgrade) ($55.13 flat)
- Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) fee record removed: SoCoBD Residential Electrical Only Permit (Table C) — no confirmed dedicated EV/EVSE line item
- Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) record added
- 2026-07-03Initial record — coverage of Pueblo began