Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-07.

Sedgwick building permits

Verified

Sedgwick, Colorado — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

NONE — the Town of Sedgwick has NOT adopted the IBC, IRC, or any other model building code edition by ordinance. Chapter 152 of the Sedgwick Town Code, titled 'BUILDING CODE,' is explicitly marked '[Reserved]' in the currently codified Code of Ordinances (2023 S-1 supplement, current through Ordinance 01-2023 passed 3-13-2023) — confirmed by direct extraction of the Code Book PDF (American Legal Publishing, hosted at sedgwickcolorado.com/_files/ugd/4d4221_87d4af0c271c403eace6f27595d559ee.pdf).Chapter 151 (Building Regulations) is NOT a model code adoption — it is an unmodernized 1919-era fire-limits ordinance (Ord. 19, passed 6-2-1919) still on the books, governing construction materials (masonry/incombustible-material requirements) only within a narrowly described historical 'fire limits' district of downtown Sedgwick; it sets wall-thickness and combustible-material rules but does not incorporate or reference the IBC/IRC/IPC/IMC/IFGC/NEC or any edition year for general residential/commercial construction.The only references to an International Code family found anywhere in the Sedgwick Town Code are narrow, use-specific citations to the 2012 International Fire Code (IFC) and 2012 International Building Code (IBC) inside Chapter 112 (Marijuana Regulations) — Sec. 112.070-112.072, governing exiting/security/fire-extinguisher standards specifically for marijuana cultivation, product-manufacturing, and testing facilities (Ord. 04-2019, passed 5-14-2019). This is not a general building-code adoption applicable to ordinary residential or commercial construction and is not modeled as a codesAdopted entry for permit types in this file.Electrical and plumbing work is explicitly NOT locally coded or inspected by the Town — the Town's own Application for Building Permit form flags 'New/Replace Electrical' and 'New/Replace Plumbing' work items with the parenthetical '(State Permit Required)', and Section C of the form asks whether a State permit will be required for the Electrician/Plumber/Engineer named on the application, confirming those trades are governed by Colorado state licensing/permitting (e.g., State Electrical Board), not a town-adopted trade code.Chapter 150 (Flood Damage Prevention, Ord. 01-2017 passed 4-10-2017, last amended by Ord. 01-2023) is the Town's most substantive adopted land-use/construction regulation: it requires a Floodplain Development Permit for any development in the Special Flood Hazard Area, administered by the Zoning Administrator acting as Floodplain Administrator, and sets standards for elevation/flood-proofing of structures (lowest floor at least 2 feet above base flood elevation) — this operates alongside, not instead of, the general Building Permit.

Permit types & fees

Building Permit (New Construction, Addition, Alteration, Roof/Siding, Foundation, Relocation)

Verified

The Town of Sedgwick's single, unified Application for Building Permit covers new construction (single-family, multi-family, garage, carport, and non-residential structures), additions, alterations (adding/moving walls), roof and siding repair/replacement, building relocation, foundation work, and new fences. Reviewed and approved or denied by the Town's Zoning Administrator. Electrical and plumbing work items on the same form are explicitly routed to the State ('State Permit Required') rather than reviewed under a town-adopted trade code, since the Town has not adopted the IBC/IRC or any other model building code (Sedgwick Town Code Chapter 152, 'Building Code,' is explicitly Reserved).

Verified 2026-07-06 · Source

Requirements

  • Completed Application for Building Permit form (Sections A/B as applicable, Section C Identification)
  • For New Building (Section B): must state whether the parcel is in a flood zone (100-year or 500-year) and affirm a good-faith belief the proposed construction is reasonably safe from floods, per the Town's Flood Damage Prevention ordinance (Chapter 150)
  • A drawing/site plan showing the location of all proposed improvements or buildings, property lines, and approximate water and sewer line locations must be attached
  • Compliance with the Town's Comprehensive Zoning Ordinance for setbacks, height, and lot coverage percentage (Sedgwick Town Code § 153.01, zoning ordinance adopted by reference)
  • Contractors must attach or email proof of insurance to the Town (sedgwickco@pctelcom.coop) before the permit will be issued
  • General Contractor, Plumber, Engineer, and Electrician (as applicable) must be identified by name, mailing address, and phone, with licensed/insured status disclosed on the form
  • State permits are required separately for electrical and plumbing work; the Town's own form does not review or inspect these trades under a town-adopted code
  • All State Permits and the Town's Local Building Permit must be physically posted on the property before starting the project
  • Applicant and Contractor signatures required on the form

Required documents

  • RequiredApplication for Building PermitTown of Sedgwick's official PDF application form (downloadable from sedgwickcolorado.com); submitted by email to sedgwickinfo@pctelcom.coop or in person at Town Hall
  • RequiredSite Plan / DrawingDrawing showing location of all improvements/building to be constructed, property lines, and approximate water and sewer line locations
  • RequiredProof of Contractor InsuranceRequired from any contractor performing the work before the permit will be issued; not required for owner-performed work (form includes an 'N/A - homeowner' checkbox)

Fee schedule

Fee typeAmountNotes
Application Fee$30.00Flat fee, stated directly on the Town's Application for Building Permit form; not valuation-based
Permit Fee$30.00Flat fee, stated directly on the same form
Total Due$60.00Application Fee + Permit Fee combined, per the form header ('$60 Total Due')

Building Relocation / Demolition-Adjacent Work

The Town of Sedgwick does not publish a standalone demolition permit or fee schedule. The closest analog on the Town's unified Application for Building Permit is the 'Relocation of Building' checkbox item, covered under the same general $60 flat fee and Zoning Administrator review as all other work types on the form. No separate demolition-specific requirements, fee, or process were found after chasing the Town's website, the downloadable Building Permit form, and the full Code of Ordinances.

Reviewed 2026-07-06 · Source

Requirements

  • Use the same Application for Building Permit form, checking 'Relocation of Building' under Section A: Type of Improvement or Construction
  • Site plan/drawing showing property lines and location of the structure being relocated or removed
  • Contractor proof of insurance if a contractor is performing the work

Required documents

  • RequiredApplication for Building PermitSame unified Town form used for all construction/alteration/relocation work; 'Relocation of Building' is a checkbox under Section A

Fee schedule

Fee typeAmountNotes
Application Fee$30.00Same flat fee structure as the general Building Permit; no separate demolition fee is published
Permit Fee$30.00Same flat fee structure as the general Building Permit

Solar Photovoltaic (PV) Permit

Verified

Required for installing a rooftop or ground-mount photovoltaic system within the Town of Sedgwick. There is no dedicated 'Solar' checkbox on the Town's own Application for Building Permit — the closest matching category on the form is 'New/Replace Electrical (State Permit Required),' confirming that electrical work, including solar PV, is NOT reviewed under a town-adopted code (Sedgwick Town Code Chapter 152, 'Building Code,' is explicitly Reserved) but is instead routed to the State of Colorado. Two fees therefore apply: the Town's flat $60.00 Building Permit fee, and a separate State Electrical Permit fee (issued through the Colorado Division of Professions and Occupations/State Electrical Board), which is hard-capped by Colorado law regardless of system size.

Verified 2026-07-20 · Source

Requirements

  • Submit the Town's Application for Building Permit, checking 'New/Replace Electrical (State Permit Required)' (no dedicated solar checkbox exists on the form)
  • A separate State of Colorado Electrical Permit is required for the PV system's electrical installation, obtained from the State Electrical Board (Division of Professions and Occupations, DORA) since the Town has not adopted a local electrical inspection program
  • A site plan/drawing showing the location of the proposed installation, property lines, and approximate water/sewer line locations must be attached to the Town application
  • Contractors must submit proof of insurance to the Town (sedgwickco@pctelcom.coop) before the Town permit will be issued; not required for owner-performed work
  • Colorado's homeowner exemption allows a property owner to personally perform the electrical/solar work if the property is not for sale, resale, or rent and is not generally open to the public
  • Both the State Electrical Permit and the Town's Local Building Permit must be physically posted on the property before starting work

Required documents

  • RequiredTown of Sedgwick Application for Building PermitCheck 'New/Replace Electrical (State Permit Required)'; no separate solar-specific Town form exists
  • RequiredState of Colorado Electrical Permit ApplicationObtained through the State Electrical Board (Division of Professions and Occupations), since Sedgwick has no local electrical inspection authority
  • RequiredSite Plan / Drawing

Fee schedule

Fee typeAmountNotes
Town of Sedgwick Building Permit (Application + Permit fee)$60.00 total flat fee ($30.00 Application + $30.00 Permit)Same flat fee used for all project types on the Town's Application for Building Permit form; not valuation-based. Source: Town of Sedgwick Application for Building Permit.
State of Colorado Electrical Permit — Solar/PV (valuation-based, per Table 1-E Section B structure used statewide under C.R.S. § 12-23-117)Base fee plus a per-$1,000-of-job-valuation rate (e.g., Larimer County's copy of the statewide Table 1-E: $120 base + $9.60 per $1,000 of valuation for solar/PV, filed under 'Commercial and other fees'); the exact base/per-thousand rate is set by the issuing authority within a state-permitted band and was not independently retrieved from a DORA-hosted copy of the schedule this sessionHARD CAPPED regardless of calculated valuation: $500.00 for residential installations and $1,000.00 for commercial installations, per Colorado state law (C.R.S. § 24-48.5-113, enacted by HB21-1284). This cap applies uniformly statewide, including to State Electrical Board-issued permits.

EV Charger / EVSE Permit

Verified

Required for installing an electric vehicle charging station (Level 2 or DC fast charger) within the Town of Sedgwick. As with solar (see solar-pv-permit entry), there is no dedicated 'EV Charger' checkbox on the Town's own Application for Building Permit — the closest matching category is 'New/Replace Electrical (State Permit Required),' confirming electrical work of any kind is NOT reviewed under a town-adopted code (Sedgwick Town Code Chapter 152, 'Building Code,' is explicitly Reserved) but is instead routed to the State of Colorado. Two fees therefore apply: the Town's flat $60.00 Building Permit fee, and a separate State Electrical Permit fee (issued through the Colorado Division of Professions and Occupations/State Electrical Board) — but unlike solar, an EV charger installation is NOT subject to Colorado's HB21-1284 solar-fee cap, so the state electrical fee is calculated under the ordinary statewide Table 1-E valuation-based schedule with no dollar cap.

Verified 2026-07-20 · Source

Requirements

  • Submit the Town's Application for Building Permit, checking 'New/Replace Electrical (State Permit Required)' (no dedicated EV-charger checkbox exists on the form)
  • A separate State of Colorado Electrical Permit is required for the EV charger's dedicated circuit and any panel work, obtained from the State Electrical Board (Division of Professions and Occupations, DORA) since the Town has not adopted a local electrical inspection program
  • A site plan/drawing showing the location of the proposed installation must be attached to the Town application
  • Contractors must submit proof of insurance to the Town (sedgwickco@pctelcom.coop) before the Town permit will be issued; not required for owner-performed work under Colorado's homeowner exemption (property not for sale, resale, rent, or generally open to the public)
  • Both the State Electrical Permit and the Town's Local Building Permit must be physically posted on the property before starting work
  • Colorado's HB24-1173 (EV Charging System Permits, C.R.S. § 31-23-316) requires counties with population over 20,000 and municipalities with population over 10,000 to adopt a streamlined EV-charger permitting process by December 31, 2025 — the Town of Sedgwick (population under 200) is far below this threshold and has no obligation under that law
  • Unlike solar, Colorado's HB21-1284 solar-fee cap (C.R.S. § 24-48.5-113, $500 residential/$1,000 commercial) does NOT apply to EV charger installations — an EV charger's State Electrical Permit fee is calculated under the ordinary statewide Table 1-E valuation-based electrical fee schedule with no equivalent dollar cap

Required documents

  • RequiredTown of Sedgwick Application for Building PermitCheck 'New/Replace Electrical (State Permit Required)'; no separate EV-charger-specific Town form exists
  • RequiredState of Colorado Electrical Permit ApplicationObtained through the State Electrical Board (Division of Professions and Occupations), since Sedgwick has no local electrical inspection authority
  • RequiredSite Plan / Drawing

Fee schedule

Fee typeAmountNotes
Town of Sedgwick Building Permit (Application + Permit fee)$60.00 total flat fee ($30.00 Application + $30.00 Permit)Same flat fee used for all project types on the Town's Application for Building Permit form; not valuation-based. Source: Town of Sedgwick Application for Building Permit.
State of Colorado Electrical Permit — general/valuation-based (Table 1-E structure used statewide under C.R.S. § 12-23-117)Base fee plus a per-$1,000-of-job-valuation rate (e.g., Larimer County's copy of the statewide Table 1-E schedule); the exact base/per-thousand rate is set by the issuing authority within a state-permitted band and was not independently retrieved from a DORA-hosted copy of the schedule this sessionNOT subject to the solar-specific $500/$1,000 cap under HB21-1284 (C.R.S. § 24-48.5-113) — that cap applies specifically to solar energy device installations, not EV chargers. No EV-charger-specific fee cap or dedicated fee line was found in Colorado statute or the Table 1-E schedule.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sedgwick building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/sedgwick-county/sedgwick-town/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.