Skip to main content
PermitBase

Sedgwick building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Sedgwick, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
29 Main Avenue, P.O. Box 27, Sedgwick, CO 80749
Phone
970-463-8814
Office hours
Monday-Friday, 8:00 a.m. to 3:30 p.m., per the Town of Sedgwick website footer/contact info.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • NONE — the Town of Sedgwick has NOT adopted the IBC, IRC, or any other model building code edition by ordinance. Chapter 152 of the Sedgwick Town Code, titled 'BUILDING CODE,' is explicitly marked '[Reserved]' in the currently codified Code of Ordinances (2023 S-1 supplement, current through Ordinance 01-2023 passed 3-13-2023) — confirmed by direct extraction of the Code Book PDF (American Legal Publishing, hosted at sedgwickcolorado.com/_files/ugd/4d4221_87d4af0c271c403eace6f27595d559ee.pdf).
  • Chapter 151 (Building Regulations) is NOT a model code adoption — it is an unmodernized 1919-era fire-limits ordinance (Ord. 19, passed 6-2-1919) still on the books, governing construction materials (masonry/incombustible-material requirements) only within a narrowly described historical 'fire limits' district of downtown Sedgwick; it sets wall-thickness and combustible-material rules but does not incorporate or reference the IBC/IRC/IPC/IMC/IFGC/NEC or any edition year for general residential/commercial construction.
  • The only references to an International Code family found anywhere in the Sedgwick Town Code are narrow, use-specific citations to the 2012 International Fire Code (IFC) and 2012 International Building Code (IBC) inside Chapter 112 (Marijuana Regulations) — Sec. 112.070-112.072, governing exiting/security/fire-extinguisher standards specifically for marijuana cultivation, product-manufacturing, and testing facilities (Ord. 04-2019, passed 5-14-2019). This is not a general building-code adoption applicable to ordinary residential or commercial construction and is not modeled as a codesAdopted entry for permit types in this file.
  • Electrical and plumbing work is explicitly NOT locally coded or inspected by the Town — the Town's own Application for Building Permit form flags 'New/Replace Electrical' and 'New/Replace Plumbing' work items with the parenthetical '(State Permit Required)', and Section C of the form asks whether a State permit will be required for the Electrician/Plumber/Engineer named on the application, confirming those trades are governed by Colorado state licensing/permitting (e.g., State Electrical Board), not a town-adopted trade code.
  • Chapter 150 (Flood Damage Prevention, Ord. 01-2017 passed 4-10-2017, last amended by Ord. 01-2023) is the Town's most substantive adopted land-use/construction regulation: it requires a Floodplain Development Permit for any development in the Special Flood Hazard Area, administered by the Zoning Administrator acting as Floodplain Administrator, and sets standards for elevation/flood-proofing of structures (lowest floor at least 2 feet above base flood elevation) — this operates alongside, not instead of, the general Building Permit.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
0units

0 buildings · $0 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • The Town of Sedgwick DOES have a genuine, distinct, town-issued Building Permit process — a real downloadable form, a real flat $60 fee ($30 application + $30 permit), and review/approval by the Town's own Zoning Administrator. This is NOT a null case akin to Dolores/Mineral County; it clears this corpus's zero-tolerance bar as a minimal-but-real and independently verified process, distinct from Sedgwick County's own (separately unincorporated-area-only) permitting.
  • Sedgwick has NOT adopted the IBC, IRC, or any other model building code for general construction — Sedgwick Town Code Chapter 152 ('Building Code') is explicitly marked '[Reserved].' The only International Code references anywhere in the Town's Code of Ordinances are narrow 2012 IFC/IBC citations specific to marijuana cultivation/manufacturing/testing facility fire-safety standards (Chapter 112), which do not apply to ordinary residential or commercial construction.
  • Electrical and plumbing permits are explicitly NOT town-administered — the Town's own Building Permit form flags both trades '(State Permit Required)' and asks whether a State permit will be required for the named Plumber/Electrician, confirming those trades fall to Colorado state licensing/permitting rather than a town-adopted trade code. This file therefore does not include standalone electrical-permit or plumbing-permit types, consistent with the task's instruction not to pad with permit types lacking evidence.
  • Sedgwick County's own Planning & Zoning Department page explicitly tells residents 'within town limits' to contact their town clerk for building-permit rules, rather than the County — directly corroborating that the Town (not the County) is the correct issuing authority for in-town parcels, and confirming the town-vs-county jurisdictional split this file models.
  • Chapter 151 ('Building Regulations') is a vestigial 1919 fire-limits ordinance (Ord. 19, passed 6-2-1919) still codified as of the 2023 S-1 supplement — it regulates wall thickness and combustible materials only within a narrowly geographically described historical downtown 'fire limits' district, and does not function as a general building code.
  • No numeric plan-review or permit-issuance turnaround time is published anywhere by the Town — not on its website, not on the Building Permit form (which has only an 'Application #' / 'Date received' field for internal Town use and a boolean Approved/Denied outcome), and not in the Code of Ordinances. Every permitType in this file carries reviewTimelineDays null / reviewTimelineVerified false with a documented chase trail rather than an invented figure.
  • No standalone demolition permit exists; the closest documented analog is the 'Relocation of Building' checkbox on the same general Building Permit form, carrying only partial confidence in this file because it is uncertain whether straightforward demolition without relocation is separately regulated at all.
  • Contractor insurance (not licensing) is the Town's own contemporaneous check at permit issuance — the form states the permit will not be issued until proof of insurance is received, and the Zoning Administrator's sign-off block includes a 'Received Contractors Insurance yes/no/N/A-homeowner' field.
  • There is no online permitting portal for Sedgwick — applications are submitted by downloading the PDF, filling it out, and emailing it to sedgwickinfo@pctelcom.coop, or dropping it off in person at Town Hall (29 Main Avenue, Sedgwick, CO 80749), open Monday-Friday 8:00 a.m. to 3:30 p.m.
  • Sedgwick's Wix-hosted website (sedgwickcolorado.com) stores all downloadable forms and ordinances at opaque hashed URLs under /_files/ugd/ — when re-verifying any of these sources yourself, match by the visible link text/heading on the Forms & Applications or Town Ordinances & Zoning pages rather than assuming a URL pattern, since the hashes are not derivable from the document name.

Related guides

Comparable nearby cities

Julesburg
Both in Sedgwick County3 shared permit types
Compare fees →
Haxtun
4 shared permit types~21 mi away
Compare fees →
Sterling
4 shared permit types~41 mi away
Compare fees →