Sedgwick building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Sedgwick, Colorado.
Last verified 2026-08-02 · Source · Embed this page’s badge · Version history
Building department
- Address
- 29 Main Avenue, P.O. Box 27, Sedgwick, CO 80749
- Phone
- 970-463-8814
- Office hours
- Monday-Friday, 8:00 a.m. to 3:30 p.m., per the Town of Sedgwick website footer/contact info.
- Website
- Official site
Inspection guide
See how inspections work in Sedgwick — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
NONE — the Town of Sedgwick has NOT adopted the IBC, IRC, or any other model building code edition by ordinance. Show full textShow less
NONE — the Town of Sedgwick has NOT adopted the IBC, IRC, or any other model building code edition by ordinance. Chapter 152 of the Sedgwick Town Code, titled 'BUILDING CODE,' is explicitly marked '[Reserved]' in the currently codified Code of Ordinances (2023 S-1 supplement, current through Ordinance 01-2023 passed 3-13-2023) — confirmed by direct extraction of the Code Book PDF (American Legal Publishing, hosted at sedgwickcolorado.com/_files/ugd/4d4221_87d4af0c271c403eace6f27595d559ee.pdf).
Chapter 151 (Building Regulations) is NOT a model code adoption — it is an unmodernized 1919-era fire-limits ordinance (Ord. Show full textShow less
Chapter 151 (Building Regulations) is NOT a model code adoption — it is an unmodernized 1919-era fire-limits ordinance (Ord. 19, passed 6-2-1919) still on the books, governing construction materials (masonry/incombustible-material requirements) only within a narrowly described historical 'fire limits' district of downtown Sedgwick; it sets wall-thickness and combustible-material rules but does not incorporate or reference the IBC/IRC/IPC/IMC/IFGC/NEC or any edition year for general residential/commercial construction.
The only references to an International Code family found anywhere in the Sedgwick Town Code are narrow, use-specific citations to the 2012 International Fire Code (IFC) and 2012 International Building Code (IBC) inside… Show full textShow less
The only references to an International Code family found anywhere in the Sedgwick Town Code are narrow, use-specific citations to the 2012 International Fire Code (IFC) and 2012 International Building Code (IBC) inside Chapter 112 (Marijuana Regulations) — Sec. 112.070-112.072, governing exiting/security/fire-extinguisher standards specifically for marijuana cultivation, product-manufacturing, and testing facilities (Ord. 04-2019, passed 5-14-2019). This is not a general building-code adoption applicable to ordinary residential or commercial construction and is not modeled as a codesAdopted entry for permit types in this record.
Electrical and plumbing work is explicitly NOT locally coded or inspected by the Town — the Town's own Application for Building Permit form flags 'New/Replace Electrical' and 'New/Replace Plumbing' work items with the… Show full textShow less
Electrical and plumbing work is explicitly NOT locally coded or inspected by the Town — the Town's own Application for Building Permit form flags 'New/Replace Electrical' and 'New/Replace Plumbing' work items with the parenthetical '(State Permit Required)', and Section C of the form asks whether a State permit will be required for the Electrician/Plumber/Engineer named on the application, confirming those trades are governed by Colorado state licensing/permitting (e.g., State Electrical Board), not a town-adopted trade code.
Chapter 150 (Flood Damage Prevention, Ord. 01-2017 passed 4-10-2017, last amended by Ord. Show full textShow less
Chapter 150 (Flood Damage Prevention, Ord. 01-2017 passed 4-10-2017, last amended by Ord. 01-2023) is the Town's most substantive adopted land-use/construction regulation: it requires a Floodplain Development Permit for any development in the Special Flood Hazard Area, administered by the Zoning Administrator acting as Floodplain Administrator, and sets standards for elevation/flood-proofing of structures (lowest floor at least 2 feet above base flood elevation) — this operates alongside, not instead of, the general Building Permit.
Permit types & fees
Building Permit (New Construction, Addition, Alteration, Roof/Siding, Foundation, Relocation)
The Town of Sedgwick's single, unified Application for Building Permit covers new construction (single-family, multi-family, garage, carport, and non-residential structures), additions, alterations (adding/moving walls), roof and siding repair/replacement, building relocation, foundation work, and new fences. Reviewed and approved or denied by the Town's Zoning Administrator. Electrical and plumbing work items on the same form are explicitly routed to the State ('State Permit Required') rather than reviewed under a town-adopted trade code, since the Town has not adopted the IBC/IRC or any other model building code (Sedgwick Town Code Chapter 152, 'Building Code,' is explicitly Reserved).
From$30.00Building Permit (Commercial New Construction, Retail, Office, Manufacturing)
The Town of Sedgwick has no distinct commercial-building-permit or tenant-improvement permit: this same form and $60 flat fee is what a Retail, Office, or Manufacturing 'New Building' project uses. The Town's single Application for Building Permit is built to intake commercial work directly — its header asks the parcel to be declared 'Zoned: Residential / Commercial / Other,' Section B's New Building category list includes Retail, Service, Office/Offices, and Manufacturing alongside the residential categories, and a 'Non-Residential Only' subsection collects number of parking spaces, person capacity, sprinkler system (yes/no), and number of emergency exits. Interior alterations to an existing commercial building (a tenant-improvement-type project) are filed under the same form's Section A 'Alteration (Add/Move walls)' checkbox. Reviewed and approved or denied by the Town's Zoning Administrator; there is no separate commercial plan-review body or contracted-out building official.
From$30.00Building Relocation / Demolition-Adjacent Work
The Town of Sedgwick does not publish a standalone demolition permit or fee schedule. The closest analog on the Town's unified Application for Building Permit is the 'Relocation of Building' checkbox item, covered under the same general $60 flat fee and Zoning Administrator review as every other work type on the form. Neither the Town's website, the downloadable Building Permit form, nor the Code of Ordinances sets any demolition-specific requirement, fee, or process.
From$30.00Solar Photovoltaic (PV) Permit
Required for installing a rooftop or ground-mount photovoltaic system within the Town of Sedgwick. There is no dedicated 'Solar' checkbox on the Town's own Application for Building Permit — the closest matching category on the form is 'New/Replace Electrical (State Permit Required),' confirming that electrical work, including solar PV, is NOT reviewed under a town-adopted code (Sedgwick Town Code Chapter 152, 'Building Code,' is explicitly Reserved) but is instead routed to the State of Colorado. Two fees therefore apply: the Town's flat $60.00 Building Permit fee, and a separate State Electrical Permit fee (issued through the Colorado Division of Professions and Occupations/State Electrical Board), which is hard-capped by Colorado law regardless of system size.
From$60.00EV Charger / EVSE Permit
Required for installing an electric vehicle charging station (Level 2 or DC fast charger) within the Town of Sedgwick. As with solar (see solar-pv-permit entry), there is no dedicated 'EV Charger' checkbox on the Town's own Application for Building Permit — the closest matching category is 'New/Replace Electrical (State Permit Required),' confirming electrical work of any kind is NOT reviewed under a town-adopted code (Sedgwick Town Code Chapter 152, 'Building Code,' is explicitly Reserved) but is instead routed to the State of Colorado. Two fees therefore apply: the Town's flat $60.00 Building Permit fee, and a separate State Electrical Permit fee (issued through the Colorado Division of Professions and Occupations/State Electrical Board) — but unlike solar, an EV charger installation is NOT subject to Colorado's HB21-1284 solar-fee cap, so the state electrical fee is calculated under the ordinary statewide Table 1-E valuation-based schedule with no dollar cap.
From$60.00Conditional Use Permit (Zoning Ordinance Section 6)
A discretionary land-use approval required BEFORE a building permit application, but only for a narrow, explicitly enumerated list of uses per zoning district under the Town's Zoning Ordinance (Section 2-B 'Conditional Uses Permitted' and Section 6 'Conditional Use Review'). This is NOT a commercial-building-permit or TI-permit — it is a use-compatibility review, required in Low Density Residential (R-LD), Mobile Home (R-MH), Commercial 1 (C1), and Commercial Zoning Highway Business (C2) districts alike, each with its own enumerated list. Ordinary commercial construction (Retail, Office, Manufacturing — the categories on the Town's Building Permit form) is unconditionally permitted in C1/C2 and does NOT trigger this process; it only applies to the specific enumerated uses below.
$10.00Sign Permit
Town of Sedgwick Zoning Ordinance, Section 5 (Signs), requires a permit from the Zoning Administrator before erecting, remodeling, enlarging, moving, operating, or maintaining most signs within any zoning district. A short list of small/governmental/memorial signs is exempt. Permitted sign types, number, maximum area, height, setback, and illumination rules all vary by zoning district (Residential R-LD/R-MH, Commercial C, Industrial I), and the fee is calculated per square foot of signage rather than a flat amount — the same Zoning Administrator who reviews the Town's general Building Permit administers this permit.
$1.00Fire Sprinkler / Fire Alarm System Permit
The Town of Sedgwick has no dedicated fire-sprinkler or fire-alarm permit, fee, or plan-review process. The Town's Code of Ordinances has no Fire Department chapter at all (its full chapter list runs Chapters 10-12, 30-31, 50-52, 70-72, 90-92, 110-112, 130, and 150-154 — none establish a fire department, fire marshal, or fire code); the only reference to the Fire Department anywhere in the Code is a single sentence in Chapter 12 (Inspections) authorizing Fire Department members to enter a residence during a medical emergency. As documented elsewhere for this jurisdiction, Sedgwick Town Code Chapter 152 ('Building Code') is explicitly Reserved, and the only International Fire Code citations anywhere in the Code are narrow 2012 IFC provisions specific to marijuana cultivation/manufacturing facilities (Chapter 112), not general construction. Fire suppression service is provided by the Sedgwick Volunteer Fire Department, but it has no official Town or district webpage, fee schedule, or permit form — only third-party listing sites and social media, which are not official sources.
Fee not publishedChange of Use Permit (Certificate of Occupancy)
The Town of Sedgwick has no separately named 'Change of Use Permit' — the functional equivalent is the Certificate of Occupancy requirement in Zoning Ordinance Section 7 (Administration and Enforcement): 'No land or building shall hereafter be changed in use, nor shall any new structure, building or land be occupied or used without first having obtained a Certificate of Occupancy from the Zoning Administrator.' The same Zoning Administrator who reviews the Town's Building Permit issues Certificates of Occupancy, and the Ordinance sets a numeric issuance deadline: within five days of notification that the building is complete and ready for occupancy. No separate fee for the Certificate of Occupancy itself is published (only the Building Permit and Sign Permit have their own stated fee formulas in the Zoning Ordinance).
See fee schedule
Sedgwick's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Sedgwick yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Sedgwick lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- No data reported
- Trailing 12 months
- No data reported
- Year to date (2026 YTD)
- No data reported
- Full year 2025
- 0units
0 buildings · $0 valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- The Town has no distinct commercial building permit or tenant-improvement permit: the Zoning Ordinance contains no Site Plan Review, Development Review, or Historic Preservation chapter, and no such form appears on the Forms & Applications page or among the Business License, Vendor's License, and ReZoning Application PDFs. One genuine additional gate does exist: Zoning Ordinance Section 6, 'Conditional Use Review' — a real $10 fee-bearing land-use approval (Board of Trustees decision, Planning Commission recommendation, noticed public hearing) required before a small enumerated list of uses (wholesale businesses, campgrounds, transient mobile home parks, rooming/boarding houses, cemeteries, public utility stations) — NOT ordinary retail/office/manufacturing commercial construction — can proceed in any district, including Commercial 1 (C1) and Commercial Zoning Highway Business (C2). See the 'conditional-use-permit' permitType entry.
- The Town of Sedgwick issues its own building permit: a downloadable form, a flat $60 fee ($30 application + $30 permit), and review and approval by the Town's Zoning Administrator. It is separate from Sedgwick County's permitting, which covers unincorporated areas only — for property inside town limits, apply to the Town.
- Sedgwick has NOT adopted the IBC, IRC, or any other model building code for general construction — Sedgwick Town Code Chapter 152 ('Building Code') is explicitly marked '[Reserved].' The only International Code references anywhere in the Town's Code of Ordinances are narrow 2012 IFC/IBC citations specific to marijuana cultivation/manufacturing/testing facility fire-safety standards (Chapter 112), which do not apply to ordinary residential or commercial construction.
- Electrical and plumbing permits are explicitly NOT town-administered — the Town's own Building Permit form flags both trades '(State Permit Required)' and asks whether a State permit will be required for the named Plumber/Electrician, confirming those trades fall to Colorado state licensing/permitting rather than a town-adopted trade code. This record therefore does not include standalone electrical-permit or plumbing-permit types, consistent with the task's instruction not to pad with permit types lacking evidence.
- Sedgwick County's own Planning & Zoning Department page explicitly tells residents 'within town limits' to contact their town clerk for building-permit rules, rather than the County — directly corroborating that the Town (not the County) is the correct issuing authority for in-town parcels, and confirming the town-vs-county jurisdictional split this record models.
- Chapter 151 ('Building Regulations') is a vestigial 1919 fire-limits ordinance (Ord. 19, passed 6-2-1919) still codified as of the 2023 S-1 supplement — it regulates wall thickness and combustible materials only within a narrowly geographically described historical downtown 'fire limits' district, and does not function as a general building code.
- No numeric plan-review or permit-issuance turnaround time is published anywhere by the Town — not on its website, not on the Building Permit form (which has only an 'Application #' / 'Date received' field for internal Town use and a boolean Approved/Denied outcome), and not in the Code of Ordinances. Every permitType in this record carries reviewTimelineDays null / reviewTimelineVerified false with a documented chase trail rather than an invented figure.
- No standalone demolition permit exists; the closest documented analog is the 'Relocation of Building' checkbox on the same general Building Permit form, carrying only partial confidence in this record because it is uncertain whether straightforward demolition without relocation is separately regulated at all.
- Contractor insurance (not licensing) is the Town's own contemporaneous check at permit issuance — the form states the permit will not be issued until proof of insurance is received, and the Zoning Administrator's sign-off block includes a 'Received Contractors Insurance yes/no/N/A-homeowner' field.
- There is no online permitting portal for Sedgwick — applications are submitted by downloading the PDF, filling it out, and emailing it to sedgwickinfo@pctelcom.coop, or dropping it off in person at Town Hall (29 Main Avenue, Sedgwick, CO 80749), open Monday-Friday 8:00 a.m. to 3:30 p.m.
- Sedgwick's Wix-hosted website (sedgwickcolorado.com) stores all downloadable forms and ordinances at opaque hashed URLs under /_files/ugd/ — when re-verifying any of these sources yourself, match by the visible link text/heading on the Forms & Applications or Town Ordinances & Zoning pages rather than assuming a URL pattern, since the hashes are not derivable from the document name.