Skip to main content
PermitBase

Building Permit (New Construction, Addition, Alteration, Roof/Siding, Foundation, Relocation) in Sedgwick, Colorado

The Town of Sedgwick's single, unified Application for Building Permit covers new construction (single-family, multi-family, garage, carport, and non-residential structures), additions, alterations (adding/moving walls), roof and siding repair/replacement, building relocation, foundation work, and new fences. Reviewed and approved or denied by the Town's Zoning Administrator. Electrical and plumbing work items on the same form are explicitly routed to the State ('State Permit Required') rather than reviewed under a town-adopted trade code, since the Town has not adopted the IBC/IRC or any other model building code (Sedgwick Town Code Chapter 152, 'Building Code,' is explicitly Reserved).

Verified 2026-08-02 · Source

When you need this permit

  • Completed Application for Building Permit form (Sections A/B as applicable, Section C Identification)
  • For New Building (Section B): must state whether the parcel is in a flood zone (100-year or 500-year) and affirm a good-faith belief the proposed construction is reasonably safe from floods, per the Town's Flood Damage Prevention ordinance (Chapter 150)
  • Form header requires a 'Zoned: Residential / Commercial / Other' declaration, and Section B's New Building category list includes commercial use types (Retail, Office/Offices, Manufacturing) alongside residential ones — commercial construction uses this same form, not a separate commercial permit
  • For non-residential (commercial) New Building projects, Section B's 'Non-Residential Only' subsection additionally requires # of Parking Spaces, Person Capacity, Sprinkler System (yes/no), and # of Emergency Exits
  • A drawing/site plan showing the location of all proposed improvements or buildings, property lines, and approximate water and sewer line locations must be attached
  • Compliance with the Town's Comprehensive Zoning Ordinance for setbacks, height, and lot coverage percentage (Sedgwick Town Code § 153.01, zoning ordinance adopted by reference)
  • Contractors must attach or email proof of insurance to the Town (sedgwickco@pctelcom.coop) before the permit will be issued Contractor
  • General Contractor, Plumber, Engineer, and Electrician (as applicable) must be identified by name, mailing address, and phone, with licensed/insured status disclosed on the form
  • State permits are required separately for electrical and plumbing work; the Town's own form does not review or inspect these trades under a town-adopted code
  • All State Permits and the Town's Local Building Permit must be physically posted on the property before starting the project
  • Applicant and Contractor signatures required on the form

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Application FeeFlat fee, stated directly on the Town's Application for Building Permit form; not valuation-based
$30.00
Permit FeeFlat fee, stated directly on the same form
$30.00
Total DueApplication Fee + Permit Fee combined, per the form header ('$60 Total Due')
$60.00

Review timeline

Plan review
Not published — contact the department

How long did your Building Permit (New Construction, Addition, Alteration, Roof/Siding, Foundation, Relocation) permit actually take in Sedgwick?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Zoning Administrator Review

    Application reviewed by the Town's Zoning Administrator for zoning compliance (setbacks, height, lot coverage), flood-zone considerations if applicable, and receipt of required contractor insurance; results in a written Approved or Denied determination with reason if denied

See the full Sedgwick inspection guide — scheduling & re-inspection fees →

Tips

  • Sedgwick has NOT adopted the IBC, IRC, or any modern model building code — Chapter 152 ('Building Code') of the Town Code is explicitly Reserved. Do not assume ICC-code-based plan review; the Town's own process is a zoning/insurance/flood-zone check by the Zoning Administrator, not a technical code-compliance plan review.
  • Electrical and plumbing work require separate State permits — the Town's own Building Permit form explicitly flags these trades '(State Permit Required)' rather than reviewing them itself.
  • The $60 total fee — $30 application plus $30 permit — is a flat charge for essentially all project types on the form, not a valuation-based schedule, so project size does not change what you pay.
  • Contractor insurance must be submitted before the permit is issued — budget time to gather proof of insurance from your General Contractor, Plumber, Engineer, or Electrician before submitting. Contractor
  • There is no online portal — forms must be downloaded, filled out, and emailed to sedgwickinfo@pctelcom.coop, or dropped off in person at Town Hall (29 Main Avenue), open Monday-Friday 8:00 a.m.-3:30 p.m.
  • There is no distinct commercial-building-permit or tenant-improvement permit: this same form and $60 flat fee is what a Retail, Office, or Manufacturing 'New Building' project uses (Section B expressly lists those categories), and it is also what an interior alteration to an existing commercial building (a TI in substance) uses via the Section A 'Alteration (Add/Move walls)' checkbox. The Town's Zoning Ordinance (Zoning Book.PDF, Section 7 'Building Permits') likewise defines the permit generically for 'any building...erected, moved, or structurally altered,' with no commercial-specific fee tier or approval track. Sedgwick does have real, codified commercial zoning districts (Commercial 1/C1 and Commercial Zoning Highway Business/C2) — it is specifically the permit process, not commercial land use itself, that is unified with residential.

Frequently asked questions

Sedgwick requires a building permit (new construction, addition, alteration, roof/siding, foundation, relocation) for: Completed Application for Building Permit form (Sections A/B as applicable, Section C Identification); For New Building (Section B): must state whether the parcel is in a flood zone (100-year or 500-year) and affirm a good-faith belief the proposed construction is reasonably safe from floods, per the Town's Flood Damage Prevention ordinance (Chapter 150); Form header requires a 'Zoned: Residential / Commercial / Other' declaration, and Section B's New Building category list includes commercial use types (Retail, Office/Offices, Manufacturing) alongside residential ones — commercial construction uses this same form, not a separate commercial permit; For non-residential (commercial) New Building projects, Section B's 'Non-Residential Only' subsection additionally requires # of Parking Spaces, Person Capacity, Sprinkler System (yes/no), and # of Emergency Exits; A drawing/site plan showing the location of all proposed improvements or buildings, property lines, and approximate water and sewer line locations must be attached; Compliance with the Town's Comprehensive Zoning Ordinance for setbacks, height, and lot coverage percentage (Sedgwick Town Code § 153.01, zoning ordinance adopted by reference); Contractors must attach or email proof of insurance to the Town (sedgwickco@pctelcom.coop) before the permit will be issued; General Contractor, Plumber, Engineer, and Electrician (as applicable) must be identified by name, mailing address, and phone, with licensed/insured status disclosed on the form; State permits are required separately for electrical and plumbing work; the Town's own form does not review or inspect these trades under a town-adopted code; All State Permits and the Town's Local Building Permit must be physically posted on the property before starting the project; Applicant and Contractor signatures required on the form. If your project isn't listed, confirm with Town of Sedgwick Town Hall (Zoning Administrator reviews building permit applications; Town Clerk administers submission) at 970-463-8814 before starting work.

A flat $60.00 total: $30.00 for the Application plus $30.00 for the Permit, per the Town's Application for Building Permit form. This is not a valuation-based fee.

Sedgwick does not publish a plan-review timeline for this permit. Contact Town of Sedgwick Town Hall (Zoning Administrator reviews building permit applications; Town Clerk administers submission) at 970-463-8814 for current turnaround.

You'll need: Application for Building Permit; Site Plan / Drawing; Proof of Contractor Insurance. See the required-documents checklist on this page for details on each.

Apply through Town of Sedgwick Town Hall (Zoning Administrator reviews building permit applications; Town Clerk administers submission) at 29 Main Avenue, P.O. Box 27, Sedgwick, CO 80749. Phone: 970-463-8814, email: sedgwickinfo@pctelcom.coop (general/forms submission); sedgwickco@pctelcom.coop (Town Clerk). Office hours: Monday-Friday, 8:00 a.m. to 3:30 p.m., per the Town of Sedgwick website footer/contact info.. Official information: https://www.sedgwickcolorado.com/sedgwick-town-government.

None formally adopted for general construction. The Town's Code of Ordinances Chapter 152, titled 'Building Code,' is explicitly marked Reserved — no IBC, IRC, or other model code edition has been adopted by ordinance. The Town's review is a zoning-compliance and flood-zone check by the Zoning Administrator, not a technical building-code plan review.

Yes. The Town of Sedgwick issues its own Building Permit via a form downloadable from the Town's official website, reviewed and approved or denied by the Town's Zoning Administrator. Sedgwick County's own Planning & Zoning Department directs residents within town limits to the town clerk rather than the County for this purpose.

No. Sedgwick has no distinct commercial-building-permit or TI-permit type. The Town's single Application for Building Permit form is explicitly built to intake commercial projects — its header asks 'Zoned: Residential / Commercial / Other,' and its New Building section lists Retail, Office/Offices, and Manufacturing alongside residential categories, with a 'Non-Residential Only' subsection for parking spaces, occupant capacity, sprinklers, and emergency exits. Interior alterations to an existing commercial space (TI-type work) are filed under the same form's 'Alteration' checkbox. Everything runs through the same $60 flat fee and the same Zoning Administrator review as residential work; the Town's Zoning Ordinance confirms this generic (non-commercial-specific) building-permit requirement in its Administration and Enforcement section. Sedgwick does have codified commercial zoning districts (C1, C2), so commercial construction itself is a recognized, regulated land use — it simply is not permitted through a separate process or fee schedule.

Sedgwick's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Sedgwick yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Sedgwick lands. Privacy.