This is PermitBase’s published record for Akron as of 2026-07-13. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Akron building permits

Akron, Colorado — as published 2026-07-13.

Reviewed 2026-07-13 · Source

Codes adopted

2018 International Building Code (IBC), chapters 1-35 plus appendices C, E, G, H, I, and J — Town Code 10-2-1, adopted by Ordinance 514 (1-6-2014), amended by Ordinance 589 (6-5-2023). The Ord. 589 amendment did NOT change the underlying edition year — Town Code 10-2-1 as currently published still names the 2018 IBC specifically, not a newer cycle — so the 2023 ordinance is treated as a re-adoption/amendment of the same 2018 edition rather than a code-cycle update, per direct reading of the current Town Code text (American Legal Publishing, checked 2026-07-06).2009 International Residential Code (IRC), chapters 1-43 plus appendices B, C, D, E, G, H, J, and K — Town Code 10-3-1, adopted by Ordinance 515 (1-6-2014). This is a materially older code cycle than the Building Code (2009 IRC vs. 2018 IBC); no evidence of a later IRC re-adoption was found anywhere in the Town Code, the Town's ordinances index, or web search as of this review.No standalone plumbing, mechanical, fuel gas, or electrical code chapter exists anywhere in Town Code Title 10 (Building and Development) — Chapters run: Ch.1 General Building Provisions, Ch.2 Building Code (IBC 2018), Ch.3 Residential Code (IRC 2009), Ch.4 Building Numbers (addressing), Ch.5 Colorado Plains Regional Airport Overlay Zoning, Ch.6 Shipping Containers. Checked the full Title 10 table of contents and walked every chapter node directly on American Legal Publishing's code library (codelibrary.amlegal.com/codes/akron_co) — confirmed no electrical/plumbing/mechanical/energy chapter exists.No energy code (IECC or otherwise) has been adopted by the Town of Akron — no such chapter exists in Title 10, and no ordinance adopting an energy code was found via direct Town Code review or web search. See localAmendments for the HB22-1362 analysis.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new construction of one- and two-family dwellings and townhomes (not more than three stories) in the Town of Akron. Reviewed under the 2009 IRC as locally adopted and amended (Town Code 10-3-1, 10-3-2), including Akron's specific Table R301.2(1) design criteria (20 psf ground snow load, 90 mph wind speed, Seismic Design Category C, 30-inch frost depth). Issued by the Town's Building Inspector.

Verified 2026-07-13 · Source

Requirements

  • Plans/work must comply with the 2009 IRC as locally adopted and amended, including Akron's Table R301.2(1) design criteria: 20 psf ground snow load, 90 mph wind speed (no topographic effects), Seismic Design Category C, 30-inch minimum frost line depth, Slight-to-Moderate termite exposure, 0 F winter design temperature, no ice shield underlayment required, Air Freezing Index 0-1000, Mean Annual Temp 47 F
  • Automatic residential fire sprinkler systems are NOT required for one- and two-family dwellings under Akron's local amendment to Section R313.2 (deleted); this requirement applies only to townhouses (Section R313.1, effective 2-3-2014)
  • Permit becomes invalid if work is not commenced within 180 days of issuance, or if suspended/abandoned for 180 days; standard permit validity is 12 months from issuance, extendable in limited circumstances (see localAmendments)
  • Fees are paid to the Town Clerk and deposited in the Town's General Fund per Town Code 10-1-1; building fees and use taxes are calculated based on construction cost and are due at the time the application is submitted (per the Town's live Building Department page) — there is no separate fixed dollar fee schedule to look up
  • A Certificate of Occupancy (CO) must be obtained before any building can be occupied (Town's live Building Department page, corroborated by Wayback snapshots of the same page dated 2020-08-13 and 2021-10-06)
  • All building permits require a plot plan showing placement of the structure, grades, elevations, sidewalks, curb and gutters, and other pertinent information (per the current application form and the live Building Department page)
  • If the work involves roofing, shingles must carry a National Wind Warranty of 89 mph sustained or 115 mph 3-second gust per the current application form; separately, the Town's live Building Department page states roofing must meet Ground Snow 20 / Roof Snow 30 loading, a minimum 110 mph wind shingle rating, and that ice-and-water-guard and drip-edge underlayment are NOT required by the Town (check with your insurer, as their requirements may differ) — both figures are cited as stated by their respective sources and have not been reconciled into a single number

Required documents

  • RequiredBuilding Permit ApplicationThe Town's building department migrated its website from townofakron.colorado.gov to www.townofakron.com; the current application form ('BUILDING PERMIT - UPDATED 08-2024.pdf') is live at https://www.townofakron.com/DocumentCenter/View/201 and covers residential AND commercial permits (checkboxes for Fence, Deck, Concrete, Roofing, Shed/Outbuilding, New Construction, Pre-move Inspection, Remodeling/Addition, Demolition, Other) on a single unified form. It collects the applicant's State Electrical Permit # and State Plumbing Permit # directly on the application. May be submitted in person, by email (deputyclerk@townofakron.com), or by mail to Town of Akron, 250 Main Avenue, Akron, CO 80720. A plot plan must be attached.

Fee schedule

Fee typeAmountNotes
General new-construction/building permit feeNot a fixed figure — calculated based on construction cost (valuation-based), due at time of application submission
Confirmed on the Town's live Building Department page (townofakron.com/179/Building) and independently corroborated by Wayback snapshots of the same page dated 2020-08-13 and 2021-10-06; Show full citation

Confirmed on the Town's live Building Department page (townofakron.com/179/Building) and independently corroborated by Wayback snapshots of the same page dated 2020-08-13 and 2021-10-06; no separate published fee schedule exists anywhere on the Town's site or in Town Code Title 10.

Manufactured/Mobile Home placement permit — base fee$24.60
Live Building Department page (townofakron.com/179/Building), checked 2026-07-13: 'Fill out a building permit for the Town of Akron and pay the base pay of $24.60.' Applicant must also submit a… Show full citation

Live Building Department page (townofakron.com/179/Building), checked 2026-07-13: 'Fill out a building permit for the Town of Akron and pay the base pay of $24.60.' Applicant must also submit a Google Maps satellite image marking the placement location with the application. This is the only fixed dollar figure published anywhere on the Town's current site or Town Code; it applies specifically to manufactured/mobile home placement, not general new construction.

Residential Addition / Remodel Permit

Required for additions and repairs/alterations to existing structures where the cost exceeds a Town-set threshold, per longstanding public-facing guidance for the Town of Akron. Reviewed under the 2009 IRC (additions to one-/two-family dwellings and townhomes) or 2018 IBC as applicable, both as locally amended.

Reviewed 2026-07-13 · Source

Requirements

  • A building permit is required for any alteration or repair of an existing structure where the cost of such alteration or repair exceeds a Town-set dollar threshold (independently corroborated public guidance for Akron cites a $1,500 threshold, but this figure was not independently verified directly against the current Town Code text or a current fee schedule as of this review — treat as likely-current but unconfirmed and call Town Hall to verify before relying on it)
  • Permit becomes invalid if work is not commenced within 180 days of issuance, or suspended/abandoned for 180 days; standard validity 12 months with limited extension provisions (Town Code 10-2-2 / 10-3-2)
  • Akron's local Section 105.2 amendments (both IBC and IRC chapters) DELETE several of the base code's standard small-project permit exemptions, meaning some minor work that would be exempt from permitting under an unamended IBC/IRC may still require a permit in Akron — confirm specific exemption status with the Building Inspector rather than assuming a national-code exemption applies
  • Additions and remodels use the SAME unified Building Permit Application form as new construction (check the 'Remodeling or Addition' box), not a separate application — confirmed directly from the current live application form
  • A plot plan is required with the application, and building fees/use taxes are calculated from construction cost and due at submission (no fixed schedule) — same procedural facts as new construction, per the Town's live Building Department page

Required documents

  • RequiredBuilding Permit ApplicationThe Town's building department migrated its website from townofakron.colorado.gov to www.townofakron.com; the current unified application form ('BUILDING PERMIT - UPDATED 08-2024.pdf', covering both new construction and 'Remodeling or Addition') is live at https://www.townofakron.com/DocumentCenter/View/201. May be submitted in person, by email (deputyclerk@townofakron.com), or by mail to Town of Akron, 250 Main Avenue, Akron, CO 80720.

Fee schedule

Fee typeAmountNotes
Alteration/repair/remodel permit feeNot a fixed figure — calculated based on construction cost (valuation-based), due at time of application submission
Confirmed on the Town's live Building Department page (townofakron.com/179/Building, checked 2026-07-13); Show full citation

Confirmed on the Town's live Building Department page (townofakron.com/179/Building, checked 2026-07-13); no separate published fee schedule exists. The specific $1,500 cost threshold cited below for when a permit is required at all remains a corroborated-but-unconfirmed figure — it does not appear on the live page or the current application form.

Electrical Permit

Verified

Electrical work in the Town of Akron is NOT permitted through a Town-run electrical program — Akron's Title 10 Town Code contains no electrical chapter, and the Town's own live Building Department page states plainly: 'All plumbing and electrical permits are handled by the State of Colorado.' Electrical permits are issued and inspected by the Colorado State Electrical Board (DORA Division of Professions and Occupations), consistent with the statewide default rule that state boards cover jurisdictions without their own certified local program.

Verified 2026-07-13 · Source

Requirements

  • A valid Colorado State Electrical permit (State Electrical Board, DORA/DPO) must be obtained prior to installing electrical wiring in Akron; permits may be obtained online through the State's Electrical and Plumbing Permits system
  • A homeowner may perform electrical work at their own residence and obtain the homeowner permit directly from the State Electrical Board, provided the work is personally performed, the property is not for sale/resale/rent and not open to the public, all work is inspected before and after concealment, and all work complies with the National Electrical Code (NEC)
  • An Electrical Contractor must obtain permits for company work; a homeowner-issued permit cannot be used by a contractor
  • All electrical work must comply with the National Electrical Code (NEC) as adopted by the State of Colorado
  • Once the state electrical permit is obtained, the resulting permit number must be provided to the Town of Akron (per the Town's live Building Department page); the Town's own current Building Permit Application form also includes a dedicated 'STATE ELECTRIC PERMIT #' field to record it

Required documents

  • RequiredColorado State Electrical Permit ApplicationObtained online via the Colorado DORA/DPO Electrical and Plumbing Permits system, not from the Town of Akron

Fee schedule

Fee typeAmountNotes

Plumbing Permit

Verified

Plumbing work in the Town of Akron is NOT permitted through a Town-run plumbing program — Akron's Title 10 Town Code contains no plumbing chapter, and the Town's own live Building Department page states plainly: 'All plumbing and electrical permits are handled by the State of Colorado.' Plumbing permits are issued and inspected by the Colorado State Plumbing Board (DORA Division of Professions and Occupations); the same live Town page states the resulting state plumbing permit number should then be provided to the Town of Akron.

Verified 2026-07-13 · Source

Requirements

  • A valid Colorado State Plumbing permit (State Plumbing Board, DORA/DPO) must be obtained prior to installing plumbing in Akron; permits may be obtained online through the State's Electrical and Plumbing Permits system
  • A homeowner may perform plumbing work at their own residence and obtain the homeowner permit directly from the State Plumbing Board, provided the work is personally performed, the property is not for sale/resale/rent and not open to the public, all work is inspected before and after concealment, and all work complies with the currently adopted plumbing code
  • A Plumbing Contractor must obtain permits for company work; a homeowner-issued permit cannot be used by a contractor
  • Plumbing installations must comply with the International Plumbing Code (IPC), International Residential Code (IRC), and International Fuel Gas Code (IFGC) as adopted by the State of Colorado
  • Per the Town's live Building Department page, the resulting State of Colorado plumbing permit number should be provided to the Town of Akron once obtained; the Town's own current Building Permit Application form also includes a dedicated 'STATE PLUMBING PERMIT #' field to record it

Required documents

  • RequiredColorado State Plumbing Permit ApplicationObtained online via the Colorado DORA/DPO Electrical and Plumbing Permits system, not from the Town of Akron

Fee schedule

Fee typeAmountNotes

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Akron building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)Later version (2026-07-20) →View current record →All versions →