Skip to main content
PermitBase

Version history — Akron, Colorado

This is PermitBase’s own verified record for Akron, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Akron’s actual law was at that time.

Permanent link to today’s record

/colorado/washington-county-co/akron/as-of/2026-07-13/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-07-13Current record
    • Akron, Colorado — Residential Building Permit (New Construction) fee record added: General new-construction/building permit fee (Not a fixed figure — calculated based on construction cost (valuation-based), due at time of application submission)
    • Akron, Colorado — Residential Building Permit (New Construction) fee record added: Manufactured/Mobile Home placement permit — base fee ($24.60)
    • Akron, Colorado — Residential Addition / Remodel Permit fee record added: Alteration/repair/remodel permit fee (Not a fixed figure — calculated based on construction cost (valuation-based), due at time of application submission)
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Akron began