Version history — Akron, Colorado
This is PermitBase’s own verified record for Akron, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Akron’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-07-13Current record
- Akron, Colorado — Residential Building Permit (New Construction) fee record added: General new-construction/building permit fee (Not a fixed figure — calculated based on construction cost (valuation-based), due at time of application submission)
- Akron, Colorado — Residential Building Permit (New Construction) fee record added: Manufactured/Mobile Home placement permit — base fee ($24.60)
- Akron, Colorado — Residential Addition / Remodel Permit fee record added: Alteration/repair/remodel permit fee (Not a fixed figure — calculated based on construction cost (valuation-based), due at time of application submission)
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Akron began