Skip to main content
PermitBase

Version history — Dacono, Colorado

This is PermitBase’s own verified record for Dacono, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Dacono’s actual law was at that time.

Permanent link to today’s record

/colorado/weld-county/dacono/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-13Superseded
    • Dacono, Colorado — Sign Permit record added
    • Dacono, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
    • Dacono, Colorado — Change of Use / Change of Occupancy Permit record added
  • 2026-07-20Superseded
    • Dacono, Colorado — Rooftop Solar Photovoltaic (PV) Permit fee record added: Statewide aggregate fee cap on active solar energy system installs (reference only — does not currently bind Dacono's own fee) ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
    • Dacono, Colorado — Electric Vehicle Charging Station Permit record added
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Dacono began