This is PermitBase’s published record for Eaton as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Eaton building permits

Verified

Eaton, Colorado — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

2024 International Building Code (IBC), Chapters 1-33 and Appendix Chapters H and I — adopted by Ordinance No. 664, amending Eaton Municipal Code Sec. 6-1-1, passed on second/final reading November 20, 20252024 International Residential Code (IRC), Chapters 1-43 and Appendix AB — Ordinance No. 664, Sec. 6-1-22024 International Mechanical Code (IMC)2024 International Fuel Gas Code (IFGC)2024 International Plumbing Code (IPC)2024 International Energy Conservation Code (IECC)2024 International Property Maintenance Code (IPMC)2024 International Existing Building Code (IEBC)2023 National Electrical Code (NEC)2024 International Swimming Pool and Spa Code (ISPSC)Colorado Model Electric and Solar Ready Code, 2023 Edition — Ordinance No. 664, re-numbered as Eaton Municipal Code Sec. 6-1-12Colorado Wildfire Resiliency Code, 2025 Edition — Ordinance No. 664, re-numbered as Eaton Municipal Code Sec. 6-1-13All codes adopted pursuant to Title 31, Article 16, Part 2, C.R.S. Ordinance No. 664 was introduced/approved on first reading October 16, 2025, and passed as amended on final reading November 20, 2025; the Town's own Building and Permitting page states these codes 'will go into effect January 1, 2026,' a later effective date than the ordinance's own standard 30-day-after-publication clause (Section 17) — both dates are disclosed since the Town does not itself reconcile them on a single page. This corpus treats January 1, 2026 (the Town's own explicit statement on its current Building and Permitting page) as the operative date for practical purposes.NOTE (data-integrity flag): A ProCode Inc.-branded 'Solar Permit Submissions and FAQs' handout linked from the Town's own Building and Permitting page (V4.5.22, dated April 2022, still bearing a Johnstown, CO return address) cites a stale 'Adopted Codes' list (2018 IFC, 2020 NEC, 2018 IBC, 2018 IRC) that predates both the Town's 2024 I-Code adoption (Ordinance No. 664) and the ProCode-to-SAFEbuilt rebrand. This corpus does NOT treat that stale document as a governing code citation; the current codes above (per the Building and Permitting page and Ordinance No. 664 itself) govern. The same handout's technical figures for wind speed (115 mph) and ground snow load (30 psf) are corroborated independently by Ordinance No. 664's own Table R301.2(1) and are treated as current on that independent basis, not on the stale handout's authority.

Permit types & fees

Residential Building Permit (New Construction / Addition / Remodel / Repair / Basement Finish)

Verified

Required for new single-family/duplex/multi-family dwellings, garages, additions, remodels, repairs, and basement finishes in Eaton, using the Town's own 'Residential Building Permit' application form. Reviewed under the 2024 IBC/IRC as locally amended by Ordinance No. 664; inspections and plan review performed under contract by SAFEbuilt, with permits issued by the Town Clerk's Office.

Verified 2026-07-06 · Source

Requirements

  • Completed and signed Residential Building Permit application (PURPOSE OF PERMIT covers New Building, Addition, Remodel, Repair, and Basement Finish on a single form)
  • Digital submittal (flash drive, emailed, or uploaded via CommunityCore)
  • Building plans: wall sections, floor plan, framing plan, elevations, door and window schedule, cabinet layout
  • Engineered foundation drawings
  • Plot plan showing all distances to lot lines and structures
  • Site grading plan stamped by a civil engineer
  • Mechanical, plumbing, and electrical drawings
  • Energy code compliance documents, including Manual J, S, D and supporting documents
  • Contractors must register/be verified in CommunityCore and pay the Town's $50/year Contractor Fee before applying online
  • An 'Energy Compliance Certificate' (per the 2024 IECC) is required, along with leak-test reports for ductwork and building envelope, available to the inspector at final inspection and required before Certificate of Occupancy

Required documents

  • RequiredResidential Building Permit ApplicationTown of Eaton form; covers new construction, additions, remodels, repairs, and basement finishes
  • RequiredConstruction Drawings / Building PlansWall sections, floor plan, framing plan, elevations, door/window schedule, cabinet layout, per the application form's document checklist
  • RequiredEngineered Foundation Drawings
  • RequiredPlot PlanDistances to lot lines and structures
  • RequiredEnergy Compliance Certificate (2024 IECC)Plus ductwork and building-envelope leak-test reports

Fee schedule

Fee typeAmountNotes
Residential Construction Building Permit FeePer Appendix L, 2018 IRC valuation table (as referenced in the Town's current Fee Schedule)Town of Eaton Fee Schedule, Building Department Fees, p.2; valuations based on provided labor/material costs or the current ICC BVD table, whichever is more accurate
Plan Review Fee65% of Permit Fee
Residential Admin Fee$50.00
Residential Repeat Master Plan Review Fee$200.00
Contractor Fee (annual, per contractor)$50.00 per yearPlumbers and electricians are exempt from this fee
Re-Inspection Fee$85.00 per inspection
Credit/Debit Card Payment Surcharge3% of permit total

Electrical Permit

Verified

Required for new electrical service, panel work, or living-space electrical wiring in Eaton. Governed by the 2023 NEC as adopted by Ordinance No. 664. Fees are structured differently for new residential living space (area-based) versus all other electrical work (valuation-based).

Verified 2026-07-06 · Source

Requirements

  • Electrical Permit application (via the Residential Building Permit / Commercial Permit / Counter Building Permit forms, which each include an Electrical Contractor section) submitted through CommunityCore
  • Licensed electrical contractor information, or the Town's contractor registration for homeowner-performed work
  • Electrical plan review required for all electrical permits (residential and non-residential)

Required documents

  • RequiredElectrical Permit Application (CommunityCore)
  • OptionalElectrical Diagram/Panel ScheduleFor new service or panel work

Fee schedule

Fee typeAmountNotes
Residential Creating New Living Space — 0 to 1,000 SF$200.00Town of Eaton Fee Schedule, Electrical Permit Fees, p.2
Residential Creating New Living Space — 1,001 to 1,500 SF$250.00
Residential Creating New Living Space — 1,501 to 2,000 SF$300.00
Residential Creating New Living Space — over 2,000 SF$300.00 plus $15.00 for each additional 100 SF
All Other Electrical Work (by valuation) — $1.00 to $2,000.00$100.00
All Other Electrical Work (by valuation) — over $2,000.00$200.00 plus $10.00 for each additional $1,000.00 of value
Temporary Construction Meter$85.00
Permanent Meter Inspection$85.00
Electrical Plan Review (Residential and Non-Residential)65% of Electrical Permit Fee
Electrical Re-Inspection Fee$85.00

Plumbing Permit (Water Line/Sewer Repair, Backflow, Water Heater)

Verified

Required for water/sewer line repair, backflow devices, and hot water heater installation/replacement in Eaton. Governed by the 2024 IPC as adopted by Ordinance No. 664. Most standalone residential plumbing work is billed via the Town's flat 'Over the Counter One-Stop' fee schedule rather than a dedicated plumbing valuation table.

Verified 2026-07-06 · Source

Requirements

  • Counter Building Permit (Over-the-Counter application) covers Water Line repair/replacement, Backflow, and Hot Water Heater work on a single form
  • Licensed plumbing contractor information, or Town contractor registration for homeowner-performed work
  • Backflow Permit (commercial or multi-unit) requires annual renewal

Required documents

  • RequiredCounter Building Permit Application (Over-the-Counter)Covers Water Line and Hot Water Heater work

Fee schedule

Fee typeAmountNotes
Hot Water Heater (Over-the-Counter One-Stop)$125.00Town of Eaton Fee Schedule, Over the Counter One-Stop Fees, p.2
Water and Sewer Repair Inspection (Over-the-Counter permit)$50.00
Back Flow Permit Fee (Commercial or Multi Units)$75.00 yearly
Sprinkler System Permit — Potable Water Only$15.00
Water Tap — 5/8" x 3/4"$17,159.00Scales up to $438,437.00 for a 6-inch tap; Town of Eaton Fee Schedule, Water Taps, p.5
Sewer Tap — 3/4"$3,000.00Scales up to $101,914.00 for a 6-inch tap

Mechanical / HVAC Permit (Furnace, Air Conditioning, Gas Line, Gas Fireplace)

Verified

Required for furnace replacement, air conditioning installation, gas line, and gas fireplace work in Eaton. Governed by the 2024 IMC/IFGC as adopted by Ordinance No. 664. Billed via the Town's flat 'Over the Counter One-Stop' fee schedule.

Verified 2026-07-06 · Source

Requirements

  • Counter Building Permit (Over-the-Counter application) covers Furnace/AC, Gas Fireplace, and Gas Line work, with fields for BTU rating and AC tonnage
  • Licensed mechanical contractor information, or Town contractor registration for homeowner-performed work
  • Gas Meter/Gas Test permit required for new gas line work

Required documents

  • RequiredCounter Building Permit Application (Over-the-Counter)Covers Furnace/AC, Gas Fireplace, Gas Line

Fee schedule

Fee typeAmountNotes
Air Conditioning (Over-the-Counter One-Stop)$125.00Town of Eaton Fee Schedule, Over the Counter One-Stop Fees, p.2
Furnace Replacement (Over-the-Counter One-Stop)$125.00
Gas Meter/Gas Test (Over-the-Counter One-Stop)$125.00

Roofing Permit (Re-Roof)

Verified

Required for re-roofing work in Eaton, governed by Chapter 9 (Sec. R901-R908) of the 2024 IRC as adopted, plus the Town's own dedicated Roofing Regulations handout and a locally amended Class-4 impact-resistant shingle requirement.

Verified 2026-07-06 · Source

Requirements

  • Building Permit shall be posted on the house prior to starting work
  • Roofing Contractor must carry $100,000 combined single limit liability insurance; certificate of insurance (with limits, policy number, insurer name, effective/expiration dates) submitted at time of application, with an endorsement requiring 10-day advance written notice to the Town before cancellation
  • Re-roofing performed per Chapter 9 of the 2024 IRC: ice barrier required from the lowest roof edges to at least 24 inches inside the exterior wall line; all existing roofing materials must be torn off down to the deck (one-layer overlay rarely permitted); materials must meet 2024 IRC fire classification and wind-resistance standards; drip edge required at eaves and gables
  • Asphalt shingles must be Class 4 impact resistant, tested to UL2218, installed per manufacturer instructions — a local amendment to IRC R905.2.4
  • Replace damaged roof vents, b-vents, and roof jacks; add roof vents as needed to comply with 2024 IRC Sec. 806 (Roof Ventilation)
  • Secured ladder required on-site for all inspections (Code Reference R109.3)
  • Repair or replacement of less than 1 square (100 sq ft) of shingles does NOT require a building permit, per both the Roofing Regulations handout and Ordinance No. 664's IRC Sec. 105.2/R105.2 exemption amendment

Required documents

  • RequiredCounter Building Permit Application (Over-the-Counter)Re-Roof field captures number of squares
  • RequiredCertificate of Insurance$100,000 combined single limit, naming the Town of Eaton, with 10-day cancellation notice endorsement

Fee schedule

Fee typeAmountNotes
Re-Roof (Over-the-Counter One-Stop)$125.00Town of Eaton Fee Schedule, Over the Counter One-Stop Fees, p.2

Residential/Commercial Solar Permit

Verified

Required for new solar panel installation in Eaton, whether residential or commercial. Billed on the Town's valuation-based electrical schedule with distinct flat fees by system size, and reviewed under the Colorado Model Electric and Solar Ready Code and 2023 NEC Articles 690/705 as locally adopted.

Verified 2026-07-06 · Source

Requirements

  • Layout plan showing panel placement on all structures, indicating path of travel and minimum pathway widths
  • Engineered structural plan or letter (engineer's stamp) approving design, location, and installation of panels on the roof, stating roof load and wind load
  • Detailed framing plans for any additional framing required by the engineer; a final engineer's letter of inspection may be required prior to final approval
  • Equipment details/spec sheets for all equipment to be installed; all equipment must be listed and labeled per UL 1703
  • Electrical one-line diagram showing all disconnecting means, wiring, wire sizes, piping/routes/sizes, conduit routes, grounding details, panel schedules, and connection details in accordance with NEC Article 690 and 705
  • Labeling examples and locations per NEC 690
  • Ground-mounted systems require a site plan with setbacks and engineered foundation documents
  • Zoning approval required; Fire approval required for commercial systems (check with local fire district); HOA approval may also be required

Required documents

  • RequiredSolar Permit Application (via CommunityCore)
  • RequiredEngineered Structural Plan/LetterStamped, stating roof load and wind load
  • RequiredElectrical One-Line DiagramNEC Article 690/705 compliant
  • RequiredEquipment Spec SheetsUL 1703-listed and labeled equipment

Fee schedule

Fee typeAmountNotes
Residential Solar Installation$500.00Town of Eaton Fee Schedule, Electrical Permit Fees, p.2
Commercial Solar Installation < 2MW$1,000.00
Commercial Solar Installation > 2MW$1,000.00 plus non-residential electrical plan review

Demolition Permit

Verified

Required for demolition of a structure in Eaton, billed as a flat fee under the Town's Over-the-Counter One-Stop schedule.

Verified 2026-07-06 · Source

Requirements

  • Counter Building Permit (Over-the-Counter application) with description of work and intended use
  • Compliance with all Town rules/restrictions for construction/demolition activity

Required documents

  • RequiredCounter Building Permit Application (Over-the-Counter)

Fee schedule

Fee typeAmountNotes
Demolition (Over-the-Counter One-Stop)$125.00Town of Eaton Fee Schedule, Over the Counter One-Stop Fees, p.2

Fence Permit

Verified

Required for fences exceeding 6 feet in height in Eaton (fences 6 feet or under are exempt from permit per a local amendment to IBC/IRC Sec. 105.2). No dedicated fence project page, standalone fee line item, or review timeline beyond the general exemption threshold and the general building valuation fee table was found published.

Verified 2026-07-06 · Source

Requirements

  • Fences not over 6 feet high are exempt from permit, per Ordinance No. 664's amendment to IBC/IRC Sec. 105.2 Exception #2
  • Swimming pool barriers of any height are explicitly NOT exempt from permit, per the same amendment
  • Fences over 6 feet require a permit; no dedicated fence application form or fee line item beyond the general building valuation table was found published

Required documents

  • RequiredResidential Building Permit or Counter Building Permit ApplicationNo fence-specific form exists; use the general application forms

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general valuation table, Appendix L 2018 IRC per current Fee Schedule)Based on provided labor/material cost or current ICC BVD tableNo fence-specific flat fee was found published in the Town's Fee Schedule; billed under the same valuation-based residential construction table as other building permits
Residential Admin Fee$50.00

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eaton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /colorado/weld-county/eaton/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: 07095f3

Reproducible from PermitBase’s version-controlled dataset, commit 07095f3.