Skip to main content
PermitBase

Version history — Frederick, Colorado

This is PermitBase’s own verified record for Frederick, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Frederick’s actual law was at that time.

Permanent link to today’s record

/colorado/weld-county/frederick/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Frederick, Colorado — fee schedule re-verified across 8 permit types
  • 2026-08-25Superseded
  • 2026-08-13Superseded
    • Frederick, Colorado — Sign Permit record added
    • Frederick, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
    • Frederick, Colorado — Change of Use / Change of Occupancy record added
  • 2026-07-23Superseded
    • Frederick, Colorado — Demolition Permit fee record updated: Amount not itemized as a standalone line in the accessible portion of the 2026 Fee Schedule; the schedule lists a 'Demolition of Structure' heading immediately preceding the Foundation Only Permit Fee entry but the specific dollar figure was not legible in the extracted text → $200.00
  • 2026-07-20Superseded
    • Frederick, Colorado — EV Charger / EVSE Permit record added
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Frederick began