Frederick building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Frederick, Colorado.
Last verified 2026-07-23 · Source · Embed this page’s badge · Version history
Building department
- Address
- 401 Locust Street, Frederick, CO 80530 (mailing: PO Box 435, Frederick, CO 80530)
- Phone
- 720-382-5516 (general questions); 720-382-5620 (inspection request line)
- Office hours
- Monday-Friday, 7:30 a.m. - 4:30 p.m. Chief Building Official: mtheile@FrederickCO.gov.
- Website
- Official site
- Permit portal
- Apply online at Frederick's portal
Inspection guide
See how inspections work in Frederick — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- 2024 International Building Code (IBC) — Town of Frederick Building Codes page
- 2024 International Residential Code (IRC)
- 2024 International Fire Code (IFC)
- 2024 International Mechanical Code (IMC)
- 2024 International Fuel Gas Code (IFGC)
- 2024 International Plumbing Code (IPC)
- 2024 International Existing Building Code (IEBC)
- 2024 International Energy Conservation Code (IECC)
- 2024 International Swimming Pool and Spa Code (ISPSC)
- 2024 International Property Maintenance Code (IPMC)
- 2023 National Electrical Code (NEC)
- 2025 Colorado Wildfire Resiliency Code (as published by the State of Colorado Division of Fire Prevention and Control)
- Colorado Model Electric Ready and Solar Ready Code
- All codes adopted with local amendments per Frederick Municipal Code, Chapter 18 (Buildings and Building Regulations) — Town of Frederick Building Codes page (frederickco.gov/141/Building-Codes)
- Note on code-cycle currency: the Town's own Residential/New Construction Building Permit Checklist (a submittal-requirements document, not the code-adoption page) still directs energy-code compliance via '2021 IECC Energy Code' (REScheck, energy rating report, or prescriptive HERS documentation), even though the live Building Codes page lists 2024 IECC as currently adopted — this is the same pattern seen in other Colorado jurisdictions in this corpus where a static submittal PDF lags the actively-maintained code-adoption webpage. The 2024 IBC/IRC/IECC/IMC/IPC/IFGC/IEBC/ISPSC/IPMC + 2023 NEC list from the Building Codes page is treated as the current, governing adopted-code list for this file; confirm current code edition directly with the Building Department (720-382-5516) before finalizing a code analysis for any specific project, since the checklist PDF may not yet be updated to match the webpage.
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family and townhome construction in the Town of Frederick. Reviewed under the 2024 IRC/IBC as locally adopted, the Town's structural design criteria (115 mph wind, 30 psf ground snow load, 36-inch footing depth, Seismic Design Category B), and energy-code compliance. Issued by the Town of Frederick Building Department; inspections performed by Town staff or CAA (the Town's private inspection partner).
Residential Addition / Remodel Permit
Required for additions and interior remodels to existing single-family and townhome structures in Frederick. Reviewed under the 2024 IRC as locally adopted; scope of required submittal documents scales to the extent of the project per the Town's General Permit and Submittal Requirements pages.
Electrical Permit
Required for installation, alteration, or repair of electrical systems in Frederick. Governed by the 2023 NEC as locally adopted. Issued by the Town of Frederick Building Department (not deferred to the state board for issuance), but the listed electrician's Colorado DORA electrical/contractor license is contemporaneously verified per the Town's Electrician License Contemporaneous Review Guidelines (citing CRS 12-23-116).
Plumbing Permit
Required for installation, alteration, or repair of plumbing systems in Frederick. Governed by the 2024 IPC as locally adopted. Issued by the Town of Frederick Building Department (not deferred to the state board for issuance), but the listed plumber's Colorado DORA license is contemporaneously verified per the Town's Plumber License Contemporaneous Review Guidelines (citing CRS 12-155-120(1) and HB19-1086).
Mechanical / HVAC Permit
Required for heating, cooling, and ventilation equipment installation or replacement in Frederick. Governed by the 2024 IMC and 2024 IFGC as locally adopted. Issued by the Town of Frederick Building Department.
Roofing Permit (Re-Roof)
Required for re-roofing work in the Town of Frederick. Governed by the 2024 IRC/IBC as locally adopted. The Town's own submittal/fee pages do not carry a distinct, itemized re-roof fee or checklist separate from the general Building Permit process; billed under the general valuation-based schedule absent a listed flat fee.
Solar Photovoltaic (PV) Permit
Required for solar photovoltaic system installations in Frederick, whether roof-mounted or ground-mounted. Governed by the IRC, NEC Articles 690 and 705, and IBC Chapter 16 as locally adopted, per the Town's dedicated Solar Submittal Requirements page.
EV Charger / EVSE Permit
Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Frederick. Governed by the 2023 NEC as locally adopted. The Town's Fee Schedule has no distinct 'EV charger' or 'EVSE' line item — a standalone EVSE circuit is billed under the general valuation-based Building Permit Fee table (Chapter 18) as electrical work, the same treatment applied to standalone electrical scope not covered by the schedule's narrow flat-fee items (e.g., a 200A-max residential service upgrade, which is a separate $100 flat fee if the EVSE installation requires one).
Demolition Permit
Required for demolition of structures in the Town of Frederick. Requires compliance with Colorado Department of Public Health and Environment (CDPHE) asbestos regulations, linked directly from the Town's Demolition submittal page.
Commercial Tenant Improvement / Commercial Building Permit
Required for new commercial construction and tenant improvements in the Town of Frederick. Reviewed under the 2024 IBC as locally adopted, with all discipline-specific plans wet-stamped by the applicable Colorado-licensed design professional. The Town's own submittal checklist does not explicitly differentiate tenant improvement scope from new commercial construction; TI projects are expected to submit a scaled-down version of the same document set (typically without new site/civil/grading/utility-connection plans).
Deck / Covered Patio Permit
Required for construction of decks and covered patios attached to residential structures in Frederick. Governed by the 2024 IRC as locally adopted; billed under the general residential Building Permit process absent a dedicated deck-specific checklist or flat fee in the Town's published materials.
Furnace / Water Heater Replacement Permit
Distinct flat-fee permit categories published by the Town of Frederick for straightforward residential equipment replacement: AC/Furnace/Evaporative Cooler replacement and 'like-for-like' water heater replacement, each billed separately from the general valuation-based Building Permit Fee schedule.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 2units
2 buildings · $1.8M valuation
- Trailing 12 months
- 74units
11 of 12 months reported · #33 in Colorado coverage by units
- Year to date (2026 YTD through 2026-05)
- 52units
52 buildings · $20.7M valuation
5 month(s) reported to Census
- Full year 2025
- 56units
56 buildings · $22.3M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Frederick is a Statutory Town (not a full home-rule charter city) with its own Building Department (401 Locust Street) that issues its own building, electrical, mechanical, and plumbing permits — inspections are performed by Town staff or by CAA (Code Administration & Associates), described by the Town itself as its 'private building inspection partner.'
- Frederick contemporaneously verifies BOTH electrician and plumber Colorado DORA state licenses at building-permit application (per its own published Contemporaneous Review Guidelines citing CRS 12-23-116 for electrical and CRS 12-155-120(1)/HB19-1086 for plumbing) — this is the standard statutory pattern layered on the Town's own local permit issuance, not a case of Frederick deferring issuance entirely to the state boards.
- The Town's live Building Codes page lists 2024 IBC/IRC/IFC/IMC/IFGC/IPC/IEBC/IECC/ISPSC/IPMC plus 2023 NEC as currently adopted, alongside the 2025 Colorado Wildfire Resiliency Code and the Colorado Model Electric Ready and Solar Ready Code — but the Town's own Residential New Construction Checklist still separately references a '2021 IECC Energy Code' compliance path (REScheck/energy rating/prescriptive HERS). Both editions meet or exceed Colorado's HB22-1362 statewide energy floor (2021 IECC minimum, July 2023-July 2026 window); confirm current governing edition directly with the Building Department if timing is ambiguous for your specific project.
- All contractors (including electrical Class E and plumbing Class P) need BOTH a Colorado state trade license/DORA registration AND a separate Town of Frederick contractor license via the Town's OpenGov portal — the portal treats every submission as a new license application, with no distinct renewal workflow.
- The Town publishes NO numeric plan-review turnaround (days or weeks) for any permit category anywhere on its Building Department page, Submittal Requirements page, Solar Submittal Requirements page, Residential New Construction Checklist, 2026 Fee Schedule, or general Permits page — checked all of these directly. Every permitType in this file is honestly null/unverified with a documented chase trail rather than an invented figure.
- Frederick's 2026 Fee Schedule includes several distinct FLAT fees that sit outside the general valuation-based Building Permit Fee table: Residential AC/Furnace/Evaporative Cooler ($200), Residential 'Like for Like' Water Heater ($200), Residential Service upgrade 200A max ($100), 200A-or-less Temporary Electrical Service/Construction Meter ($150), Residential Solar Device ($500), Commercial Solar Device ($1,000), and a Foundation Only Permit Fee ($1,000 per $500,000 of total building valuation, or fraction thereof) — confirm which line item applies to your specific scope before budgeting from the general valuation table alone.
- Solar photovoltaic submittal in Frederick requires a stamped structural engineering letter for ALL projects (not just non-flush-mounted arrays) — this is a broader trigger than some peer jurisdictions and should be budgeted for even on a simple flush-mount residential roof job. The Solar Submittal Requirements page itself states no fee, but the separate 2026 Fee Schedule carries the actual $500/$1,000 flat solar fees — use the Fee Schedule for cost figures.
- Fire alarm and fire sprinkler plans in Frederick route to the Frederick Fire Department separately from the Building Department's commercial plan review — do not bundle fire-protection plans with a Building Department commercial/TI submittal.
- Water Dedication Requirements apply to new single-family and commercial projects located east of I-25 (per Frederick Municipal Code Title 13, Article II, Division 2), coordinated with the St. Vrain Sanitation District and St. Vrain Valley School District — this is a separate utility/water-rights process from Building Department plan review and is not modeled as its own permitType in this file.
- Data-integrity re-chase closed 2026-07-23: all five permit types that previously carried 'partial' confidence (residential addition/remodel, re-roof, demolition, commercial TI, deck/covered-patio) are now verified. The demolition fee ($200.00) was recovered by visually rendering page 8 of the live 2026 Fee Schedule PDF — a prior column-shifted pdftotext extraction had separated the 'Demolition of Structure' label from its adjacent dollar figure. The other four gaps (whether Frederick has a separate checklist/application/fee for re-roofs, decks/patios, additions/remodels, and commercial tenant improvements) closed on a different kind of evidence: the Town's New Residential, New Commercial, and General Permit Application PDFs are confirmed text-identical ('GENERAL CONSTRUCTION PERMIT' with a free-text PERMIT TYPE field and a built-in 'Deck' field), the live All-Commercial checklist explicitly covers 'Class of work - New, addition, alteration, repair, move, other' as one unified list, the Town's public OpenGov permitting API (frederickco.portal.opengov.com) publicly lists only 'Contractor License Application' as a standalone record type, and the Wayback Machine's full capture history of frederickco.gov since 2016 shows no re-roof/deck/tenant-specific page ever existed. Together these confirm Frederick genuinely runs ONE unified permit-application-and-checklist track scaled by project scope, rather than this file having missed separate published documents — call the Building Department (720-382-5516 / building@frederickco.gov) to confirm exact document expectations for a specific active project, as several permit types' checklists explicitly scale documentation to the nature of the work.