Plumbing Permit — Frederick, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.frederickco.gov/DocumentCenter/View/12011/Plumber-License-Contemporaneous-Review-Guidelines
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Frederick, Colorado
Required for installation, alteration, or repair of plumbing systems in Frederick. Governed by the 2024 IPC as locally adopted. Issued by the Town of Frederick Building Department (not deferred to the state board for issuance), but the listed plumber's Colorado DORA license is contemporaneously verified per the Town's Plumber License Contemporaneous Review Guidelines (citing CRS 12-155-120(1) and HB19-1086).
Verified 2026-07-06 · Source
When you need this permit
- Governed by the 2024 IPC as locally adopted by the Town of Frederick
- Plumber and license number must be listed on the permit application at time of submittal; permit will not be processed until listed
- Town of Frederick (or CAA on its behalf) verifies the listed plumber's active Colorado DORA contractor and plumbing license via the state's online License Lookup before the permit is processed
- If the plumber changes during construction, the new plumber's name/license must be provided and re-verified; work can be stopped if not verified
- At inspection, the inspector may at their discretion verify the identity of the plumber who performed the work and fail the inspection if unable to confirm
- Contractor must also hold a Town of Frederick contractor license (Class P) in addition to the Colorado state Master Plumber/Plumbing Contractor license Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment; plumber identity may be verified at inspector's discretion
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
See the full Frederick inspection guide — scheduling & re-inspection fees →
Tips
- Like the electrical program, Frederick issues its own plumbing permits locally but contemporaneously verifies the plumber's Colorado DORA state license at application (CRS 12-155-120(1) and HB19-1086) — keep license documentation current if you swap plumbing subcontractors mid-project.
- A 'like-for-like' residential water heater replacement has its own flat $200 fee, separate from the general valuation-based Building Permit Fee schedule — confirm your job qualifies as 'like-for-like' before assuming this flat rate applies.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Frederick building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Frederick
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Frederick project checklist
Describe your project once and get every permit, document, and fee it triggers in Frederick — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →