Frederick building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Frederick, Colorado.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 401 Locust Street, Frederick, CO 80530 (mailing: PO Box 435, Frederick, CO 80530)
- Phone
- 720-382-5516 (general questions); 720-382-5620 (inspection request line)
- Office hours
- Monday-Friday, 7:30 a.m. - 4:30 p.m. Chief Building Official: mtheile@FrederickCO.gov.
- Website
- Official site
Inspection sequence
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (additions with new footings only)
Before concrete pour, per 36-inch minimum footing depth
- 2
Rough Frame
Framing complete, connection to existing structure verified
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour, per 36-inch minimum footing depth
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment; electrician/plumber identity may be verified at inspector's discretion
- 4
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Commercial Tenant Improvement / Commercial Building Permit
- 1
Rough Structural/Framing
Structural elements and framing before cover
- 2
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 3
Final Inspection
All work complete per approved plans; Certificate of Occupancy issuance where applicable
Applies to: Deck / Covered Patio Permit
- 1
Footing
Before concrete pour, per 36-inch minimum footing depth
- 2
Framing
Deck/patio framing and ledger attachment (if applicable) before decking installation
- 3
Final Inspection
Guardrails, stairs, and completed structure verified
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment; electrician identity may be verified at inspector's discretion
- 2
Final Inspection
Devices installed, panel labeled, system energized and verified
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
Wiring, conduit, and disconnect placement before concealment; electrician identity may be verified at inspector's discretion
- 2
Final Electrical
EVSE unit connections verified, circuit labeled, system energized
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment; plumber identity may be verified at inspector's discretion
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
Framing (if structural roof enhancements made)
Required only when structural enhancements to support the array are made
- 2
Final Electrical Inspection
Rapid shutdown system tested with inspector present; qualified person per system size/type must be on site
Final inspection only: Demolition Permit, Furnace / Water Heater Replacement Permit, Roofing Permit (Re-Roof)
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Frederick building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Frederick building permits