Skip to main content
PermitBase

Version history — Hudson, Colorado

This is PermitBase’s own verified record for Hudson, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Hudson’s actual law was at that time.

Permanent link to today’s record

/colorado/weld-county/hudson/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Hudson, Colorado — fee schedule re-verified across 2 permit types
  • 2026-08-25Superseded
  • 2026-08-21Superseded
    • Hudson, Colorado — Change of Use / Change of Occupancy fee record updated: Variable — not itemized in the documents located during this review → Variable — not itemized in the Town's published documents
    • Hudson, Colorado — Sign Permit fee record updated: Variable — not itemized in the documents located during this review → Variable — not itemized in the Town's published documents
    • Hudson, Colorado — adopted-codes record updated
  • 2026-08-20Superseded
  • 2026-08-14Superseded
    • Hudson, Colorado — Sign Permit record added
    • Hudson, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
    • Hudson, Colorado — Change of Use / Change of Occupancy record added
  • 2026-07-23Superseded
    • Hudson, Colorado — Plumbing Permit fee record added: One Stop Permit — Sanitary Sewer/Water Repair (Variable (billed under the general valuation-based Building Permit Fee; no flat dollar figure published for this category, unlike Hot Water Heater Replacement/Reroof))
  • 2026-07-20Superseded
    • Hudson, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Hudson began