Nunn building permits
Nunn, Colorado — as published 2026-08-26.
Reviewed 2026-07-23 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family or duplex construction in the Town of Nunn. Reviewed under the 2018 IRC as locally amended, including Nunn's Climatic and Geographic Design Criteria (30 psf ground snow load, 115 mph wind design speed, 30-inch frost depth) and a Colorado-registered-design-professional foundation/soils requirement. Applications are submitted to the Town Clerk's Office and forwarded to SAFEbuilt (the Town's contracted plan-review/inspection agency) for plan review; projects require Planning Board approval before SAFEbuilt review begins.
Verified 2026-07-23 · Source
Requirements
- Planning Board approval required before the application is forwarded to SAFEbuilt for plan review; paperwork must be submitted to Town Hall at least 6 days before the Planning Board's first-Thursday-of-the-month, 6:00 p.m. meeting, and the applicant must personally attend
- Plans must comply with the 2018 IRC as locally amended and meet Nunn's Climatic and Geographic Design Criteria: 30 psf ground snow load, 115 mph wind design speed (Exposure C, Seismic Design Category B), 30-inch minimum frost depth, ice barrier underlayment required
- Foundation design and construction drawings must be stamped by a Colorado-registered design professional, based on an engineer's soils report (firm name, design location, and soils-report number noted); a site certification by a Colorado-registered design professional is required for setback verification
- One set of plans (site plan, floor plan showing square footage by level/garage/deck/porch/crawl space, and structural/electrical/mechanical/plumbing plans as applicable) submitted to the Town Clerk's Office or emailed to kendra.minch@townofnunnco.gov
- Once returned from SAFEbuilt, the Town emails an invoice with assessed fees; payment (in person or by phone) and authorization must be complete before work may begin
- All inspections are performed by SAFEbuilt, not the Town; the owner/contractor is responsible for scheduling inspections directly with SAFEbuilt
- No distinct commercial-building-permit or tenant-improvement (TI) permit exists in Nunn: this same process, form, and fee structure is also used for new commercial/industrial construction and tenant-finish build-outs. The Town's own 'Building Permit Application' PDF (the identical form cited above) has a 'Proposed Use' section listing 'Commercial/Industrial — Shell Only / Tenant Finish' as a checkbox option directly alongside 'Residential: One Family / Multi Family' — confirming commercial and TI scopes route through this exact undifferentiated intake. Nunn Municipal Code Chapter 15.08 (Building Permits) itself is occupancy-agnostic: NMC 15.08.020(a) requires a permit for 'any building or structure, as defined by the building code for the town,' with no separate commercial process, fee schedule, or application named anywhere in Chapter 15.08. NMC Title 17 does establish a 'C Commercial District' (Ch. 17.24) and 'I Industrial District' (Ch. 17.28) at the zoning level, so commercial construction is a real, contemplated land use in Nunn — but no distinct commercial-permit type, admin-fee tier, or review-timeline SLA is published anywhere (checked the Building/Planning page, Chapter 15.08 in full, and the Town's 2026 Fee Schedule, which names only 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits) $50.00' under 'Building Permits,' with no commercial-specific line item). The 2018 IBC (adopted at NMC 15.04.020) would substantively govern a commercial/industrial occupancy's plan review versus the 2018 IRC for residential, but the intake process, application form, and Town-set admin-fee/use-tax structure are identical regardless of occupancy classification.
Required documents
- RequiredBuilding Permit ApplicationTown of Nunn Building Permit Application form, submitted to the Town Clerk's Office or by email
- RequiredSite Plan / Plans SetOne set of plans: new-construction drawing plus a drawing of existing buildings/rooms, showing easements and setbacks; square footage by area (addition, basement, 1st/2nd story, garage, carport, deck, porch, crawl space); detailed description of proposed use
- RequiredEngineer's Soils Report and Stamped Foundation DrawingsPrepared by a Colorado-registered design professional per IRC R401.2/R405.1 as locally amended
- RequiredPlanning Board ApprovalRequired before SAFEbuilt plan review begins, for any structure over 120 sq ft
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit, plan review required) + Use Tax | $75.00 flat Admin Fee (permits requiring plan review), plus 2% Use Tax on all Building Permits | The Town of Nunn's own 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) lists under 'Building Permits': 'Admin Fee (permits requiring plan review) $75.00' and 'Use… Show full citationHideThe Town of Nunn's own 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) lists under 'Building Permits': 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. New residential construction always requires SAFEbuilt plan review, so the plan-review tier governs. This is the Town Clerk's own flat administrative processing fee and use-tax rate — charged IN ADDITION TO, not instead of, SAFEbuilt's separate valuation-based plan-review/inspection fee, which SAFEbuilt calculates per application; no SAFEbuilt rate table specific to Nunn is published. |
| Investigation Fee (work commenced before permit issuance) | Up to the amount of the permit fee that would normally apply | IRC R108.6 as locally amended; charged in addition to all other required fees, collected whether or not a permit is subsequently issued |
| Permit Renewal After 180-Day Expiration | One-half the original permit fee (if within 1 year of suspension/abandonment, no plan changes); full new fee if lapsed longer | IRC R105.5 as locally amended |
Commercial Building Permit (New Construction, Additions, Remodels & Tenant Finish)
Covers new commercial and industrial construction, commercial additions, and tenant-finish build-outs in the Town of Nunn. The Town publishes no distinct commercial-building or tenant-improvement permit product: NMC 15.08.020(a) requires a building permit for 'any building or structure' without naming a separate commercial procedure, and the Town's own Building Permit Application offers 'Commercial/Industrial — Shell Only / Tenant Finish' as a checkbox on the identical form used for residential work. A commercial project is submitted to the Town Clerk's Office and forwarded to SAFEbuilt, the Town's contracted plan-review and inspection provider, and is reviewed under the 2018 International Building Code (adopted by reference at NMC 15.04.020) rather than the 2018 IRC used for residential work. The Town does have a 'C Commercial District' and 'I Industrial District' at the zoning level (Municipal Code Title 17, Chapters 17.24 and 17.28), so commercial construction is a real, contemplated land use even though it shares its permitting product with residential.
Reviewed 2026-08-26 · Source
Requirements
- A building permit is required for any commercial or industrial building or structure under NMC 15.08.020(a), which does not distinguish by occupancy
- Plans must comply with the 2018 International Building Code, chapters 1 through 33 and appendix chapter 1, adopted by reference at NMC 15.04.020, as locally amended
- Planning Board approval is required before SAFEbuilt plan review begins for any structure over 120 sq ft; paperwork must be submitted to Town Hall at least 6 days before the Planning Board's first-Thursday-of-the-month, 6:00 p.m. meeting, and the applicant must personally attend or the request is tabled to the following month
- One set of plans (site plan, floor plan, and structural/electrical/mechanical/plumbing plans as applicable) submitted to the Town Clerk's Office or emailed to kendra.minch@townofnunnco.gov, marking 'Commercial/Industrial — Shell Only' or 'Tenant Finish' under Proposed Use on the Building Permit Application
- Once returned from SAFEbuilt, the Town emails an invoice with assessed fees; payment and authorization must be complete before work may begin
- All inspections are performed by SAFEbuilt, not the Town; the owner/contractor is responsible for scheduling inspections directly with SAFEbuilt
- A commercial structure that lacks a permanent heating system, insulation, or year-round usable plumbing is carved out as its own exception to the 'low energy buildings' provision of the Town's adopted energy code (2012 IECC, NMC 15.04.140, amending IECC section 101.5.1 to add this exception)
- Electrical and plumbing contractors on a commercial project must hold an active Colorado DORA state license, verified by the Town before the application is accepted, per the Town's Electrical/Plumbing License Contemporaneous Review Guidelines implementing C.R.S. 12-115-120 as amended by HB19-1086
Required documents
- RequiredBuilding Permit ApplicationTown of Nunn Building Permit Application form; mark 'Commercial/Industrial — Shell Only' or 'Tenant Finish' under Proposed Use; the same form used for residential permits
- RequiredSite Plan / Plans SetSite plan, floor plans, and structural/electrical/mechanical/plumbing plans as applicable to the scope of work
- RequiredPlanning Board ApprovalRequired before SAFEbuilt plan review begins, for any structure over 120 sq ft
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit, plan review required) + Use Tax | $75.00 flat Admin Fee (permits requiring plan review), plus 2% Use Tax on all Building Permits | Town of Nunn 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage), 'Building Permits' section: 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. Show full citationHideTown of Nunn 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage), 'Building Permits' section: 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. The Fee Schedule sets no commercial-specific line item and no separate commercial plan-review fee; a new commercial building or tenant-finish project always requires SAFEbuilt plan review, so the $75.00 plan-review tier governs the Town's own flat component. This is charged in addition to SAFEbuilt's separate valuation-based plan-review/inspection fee, which SAFEbuilt calculates per application and does not publish as a table for Nunn. |
Residential Addition / Remodel Permit
VerifiedRequired for additions, basement finishes, kitchen/bath remodels, or any renovation involving electrical, plumbing, or structural modifications, doors/windows, or wall changes in the Town of Nunn. Governed by the 2018 IRC as locally amended; the Town publishes dedicated homeowner guides for Basement Finish and Home Additions scopes.
Verified 2026-07-23 · Source
Requirements
- Planning Board approval required before SAFEbuilt review begins if the project involves a structure or addition over 120 sq ft
- Submit one set of plans showing before-and-after conditions, square footage by area, and a detailed description of proposed use
- If walls are proposed for removal, plans must address structural implications (per general IRC/IBC provisions on structural elements)
- Any exterior egress window well added or altered must comply with IRC R310.2.3 dimension requirements as locally amended
- All contractors performing electrical or plumbing work must hold a current Colorado DORA state license, verified by the Town per its Electrical/Plumbing License Contemporaneous Review Guidelines (HB19-1086)
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Town Clerk's Office or by email
- RequiredPlans (before/after, floor plan with square footage)Per the Town's general plan-submittal guidance; scope-specific homeowner guides available (Basement Finish, Home Additions)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit, plan review required) + Use Tax | $75.00 flat Admin Fee (permits requiring plan review), plus 2% Use Tax on all Building Permits | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) lists under 'Building Permits': 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) lists under 'Building Permits': 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. Additions/remodels go through SAFEbuilt review regardless of size (only Planning Board approval is size-gated at 120 sq ft), so the plan-review tier governs. This is the Town Clerk's own flat admin fee and use-tax rate — charged IN ADDITION TO SAFEbuilt's separate valuation-based plan-review fee, which is not published as a table. |
Electrical Permit
Required for electrical system installation, alteration, or repair in Nunn. The Town does NOT run its own certified electrical licensing/permitting program — it defers to the Colorado State Electrical Board (DORA) for tradesperson licensure, with contemporaneous license verification performed by the Town per C.R.S. 12-115-120(1)/(10) as amended by HB19-1086, applicable to all SAFEbuilt inspections since December 1, 2019.
Reviewed 2026-07-23 · Source
Requirements
- Electrical-only permit applications must list the electrician's Colorado DORA state electrical license number
- The Town verifies the listed electrician's license is active via the Colorado DORA online license lookup before accepting the application; an unverifiable license results in rejection
- If the electrician performing/overseeing the work changes before final inspection, the Town must be notified and will re-verify the new electrician's license before work may continue
- SAFEbuilt inspectors may, at their discretion, verify electrician identity at any inspection (not only rough/final) and may fail an inspection if unverifiable
- Codified governing standard is the National Electrical Code, 2002 edition (NMC 15.04.040); note SAFEbuilt's own current Photovoltaic System Submittal Requirements handout instead cites the 2020 NEC as the applicable current code — this discrepancy between the codified text and the contracted reviewer's operational reference is unresolved
Required documents
- RequiredBuilding Permit Application (Electrical scope)Must list electrician name and Colorado DORA electrical license number
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | $50.00 flat Admin Fee if processed as a 'One Stop' permit, or $75.00 if SAFEbuilt plan review is required for the scope, plus 2% Use Tax on all Building Permits | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00', plus 'Use Tax on all Building Permits 2%'. The schedule does not itself name 'electrical permit' under either tier, so which of the two flat fees governs a given electrical scope is not Town-published; both real figures are given here rather than guessing one. Either way, this is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table. |
Plumbing Permit
Required for plumbing system installation, alteration, or repair in Nunn. Governed by the 2018 International Plumbing Code as locally amended. Like electrical work, Nunn defers plumber licensure entirely to the Colorado State Plumbing Board (DORA) rather than running its own local plumbing contractor licensing program, with contemporaneous license verification required by the Town per HB19-1086.
Reviewed 2026-07-23 · Source
Requirements
- Plumbing-only permit applications must list the plumber's Colorado DORA state plumbing license number
- The Town verifies the listed plumber's license is active via the Colorado DORA online license lookup before accepting the application
- If the plumber performing/overseeing the work changes before final inspection, the Town must be notified and will re-verify the new plumber's license; unverified changes require work to stop
- Governed by the 2018 IPC as locally amended (e.g., 12-inch minimum sewer depth per IPC 305.4.1/903.1 as amended, reclaimed water systems provision deleted)
Required documents
- RequiredBuilding Permit Application (Plumbing scope)Must list plumber name and Colorado DORA plumbing license number
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | $50.00 flat Admin Fee if processed as a 'One Stop' permit, or $75.00 if SAFEbuilt plan review is required for the scope, plus 2% Use Tax on all Building Permits | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00', plus 'Use Tax on all Building Permits 2%'. The schedule does not itself name 'plumbing permit' under either tier, so which flat fee governs a given plumbing scope is not Town-published; both real figures are given here rather than guessing one. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table. |
Mechanical / HVAC Permit
VerifiedRequired for furnace, boiler, and gas piping installation or replacement in Nunn. Governed by the 2018 International Mechanical Code and 2018 International Fuel Gas Code as locally amended (e.g., 18-inch minimum plastic fuel gas pipe burial depth, 10 psig test pressure, 15-minute test duration for small-volume/single-family systems).
Verified 2026-07-23 · Source
Requirements
- Furnace installations/replacements, boiler installations/replacements, and gas piping over 10 feet in length all explicitly require a permit per the Town's own building-permit-needed list
- Governed by the 2018 IMC and 2018 IFGC as locally amended
- Gas piping test requirements per IFGC 406.4.1/406.4.2 as amended: 10 psig test pressure, minimum 15-minute test duration for systems under 10 cubic feet or single-family dwellings
- Plastic fuel gas piping must be buried at least 18 inches below grade per IFGC 404.12 as amended
Required documents
- RequiredBuilding Permit Application (Mechanical/HVAC scope)Submitted to the Town Clerk's Office or by email
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | $50.00 flat Admin Fee for water heater/furnace/boiler replacement processed as a 'One Stop' permit (explicitly named by the Town); $75.00 for scopes requiring SAFEbuilt plan review (e.g. new furnace/boiler installation, gas piping runs); plus 2% Use Tax on all Building Permits | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) explicitly lists 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00' — a direct,… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) explicitly lists 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00' — a direct, named match to this permit type's water-heater/furnace-replacement scope — alongside 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. New-installation or larger mechanical scopes (e.g. gas piping runs over 10 feet) are not explicitly classified by the Town as 'One Stop,' so the plan-review tier may instead apply; both real figures are given here. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table. |
Re-Roof Permit
VerifiedRequired for re-roofing work in Nunn (shingle repair/replacement exceeding 100 sq ft/one square is the only exempted minor scope). Governed by the 2018 IRC/IBC as locally amended, with a mandatory ice barrier underlayment requirement per IRC R905.1.2 documented in the Town's own Ice & Water Shield Requirements handout.
Verified 2026-07-23 · Source
Requirements
- Re-roofing is explicitly listed as requiring a building permit on the Town's project list; only shingle repair/replacement work not exceeding 100 sq ft (one square) of covering per building is exempt, per IBC/IRC section 105.2/R105.2 as locally amended
- Ice barrier underlayment required per 2018 IRC R905.1.2: not fewer than two cemented underlayment layers (or a self-adhering polymer-modified bitumen sheet), extending from the lowest roof edge to at least 24 inches inside the exterior wall line (36 inches on slopes at or above 8:12); exception for detached accessory structures without conditioned floor area
- The Town publishes a dedicated 2024 IRC Re-Roof homeowner guide
Required documents
- RequiredBuilding Permit Application (Re-Roof scope)Submitted to the Town Clerk's Office or by email
- RequiredRoof plan / material specificationPer the Town's Re-Roof Guide and Ice & Water Shield Requirements handout
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit, One Stop) + Use Tax | $50.00 flat Admin Fee (One Stop permit), plus 2% Use Tax on all Building Permits | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) explicitly lists 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00' — a direct,… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) explicitly lists 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00' — a direct, named match to this permit type — plus 'Use Tax on all Building Permits 2%'. This is the Town Clerk's own flat admin fee and use-tax rate — charged in addition to SAFEbuilt's separate valuation-based plan-review/inspection fee, which is not published as a table. |
Rooftop / Ground-Mounted Solar Photovoltaic Permit
VerifiedRequired for solar panel installation or replacement in Nunn. SAFEbuilt (the Town's contracted plan-review/inspection agency) publishes a dedicated Photovoltaic System Submittal Requirements packet specifying current applicable codes as the 2020 NEC and 2018 International Codes, plus structural engineering letter requirements for roof-mounted and ground-mounted systems.
Verified 2026-07-20 · Source
Requirements
- Permit application (emailed to the Town or submitted online) must fully describe the work, with valuation based on total cost to the customer (contract price) including materials and labor regardless of who supplies them
- A separate plan review — and potentially a separate permit — is required for each building/address on a property
- Per SAFEbuilt's Photovoltaic System Submittal Requirements packet, applicable current codes are the 2020 NEC and 2018 International Codes (this is SAFEbuilt's own stated reference and differs from the 2002 NEC edition still shown in the codified Nunn Municipal Code text at NMC 15.04.040 — see localAmendments note)
- Roof-mounted systems require a structural engineer's stamped letter addressing added roof weight and additional wind load from the panels, designed to a minimum ground snow load of 30 psf, wind speed of 115 mph Vult, Exposure C, and Seismic Design Category B, including roof connection/embedment type
- Ground-mounted systems require an engineer-stamped letter for system support and wind load, using the same 30 psf snow load / 115 mph Vult / Exposure C / Seismic Design Category B design basis
Required documents
- RequiredBuilding Permit Application (Photovoltaic scope)Emailed to the Town or submitted via the online application; valuation must reflect total contract price
- RequiredStructural Engineer's Stamped LetterRoof-mounted: addressing added weight, wind load, and roof connection/embedment, designed to 30 psf snow load / 115 mph Vult / Exposure C / Seismic Design Category B. Ground-mounted: addressing system support and wind load under the same design basis.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building/Electrical Permit Fee (SAFEbuilt-calculated, valuation-based) | Statewide electrical component follows C.R.S. § 12-23-117: base fee ~$100-$120 for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, scalable up to 1.15x by the local government — capped in aggregate at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113 | Nunn's own Town Board-set/SAFEbuilt-calculated fee is a per-application, not a published-table, mechanism. Show full citationHideNunn's own Town Board-set/SAFEbuilt-calculated fee is a per-application, not a published-table, mechanism. However, Colorado electrical inspections are a matter of statewide concern under C.R.S. § 12-23-117 — no local government, including Nunn, may charge more than 1.15x the DORA State Electrical Board's own fee schedule for the electrical scope, or impose any other electrical fee or charge. That statewide base schedule (townoflarkspur.org/media/2901, hosted by the Town of Larkspur, CO, printed with DORA's own Denver address/phone) sets Section B "Commercial and other fees" (which Larimer County's current Table 1-E, larimer.org/sites/default/files/2020_electrical_fee_table.pdf, explicitly confirms includes solar) at $100 base for valuation up to $2,000, plus $10/thousand above. This governs the ceiling and formula for whatever SAFEbuilt ultimately invoices for Nunn's electrical scope. |
Demolition Permit
Required to demolish any building or structure in the Town of Nunn, per the Town's general building-permit requirement (Title 15) and its own project list, which explicitly names 'Demolitions' as requiring a permit.
Reviewed 2026-07-23 · Source
Requirements
- A permit is required before demolishing any building or structure per NMC 15.08.010/15.08.020 and the Town's own building-permit-needed project list
- Application and plans/description submitted to the Town Clerk's Office or by email, then forwarded to SAFEbuilt
Required documents
- RequiredBuilding Permit Application (Demolition scope)Describes the structure to be demolished and disposal/site-restoration plan
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | Most likely $75.00 flat Admin Fee (permits requiring plan review) — demolition applications are forwarded to SAFEbuilt in the same pattern as new-construction/addition scopes, not handled as an over-the-counter 'One Stop' item — plus 2% Use Tax on all Building Permits; $50.00 One Stop tier not ruled out | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00', plus 'Use Tax on all Building Permits 2%'. The schedule does not itself name 'demolition' under either tier. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table. |
Deck / Patio Cover / Carport Permit
Required for decks, patio covers, carports, and pergolas in the Town of Nunn, per the Town's own project list. The Town publishes dedicated 2024 IRC homeowner guides for Decks and Patio Covers/Carports.
Reviewed 2026-07-23 · Source
Requirements
- Decks, patio covers, carports, and pergolas are explicitly listed on the Town's building-permit-needed project list
- Attached and detached garages/carports also require a permit
- One set of plans showing site plan, square footage, and construction details submitted to the Town Clerk's Office or by email
- Foundation/footing design subject to Nunn's Climatic and Geographic Design Criteria (30 psf ground snow load, 30-inch frost depth)
Required documents
- RequiredBuilding Permit Application (Deck/Patio Cover/Carport scope)Submitted to the Town Clerk's Office or by email
- RequiredSite Plan and Construction DetailsPer the Town's Decks Guide and Patio Covers/Carports Guide
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | Most likely $75.00 flat Admin Fee (permits requiring plan review) — this permit type involves stamped footing/foundation design against Nunn's Climatic and Geographic Design Criteria, consistent with the Town's plan-review pattern — plus 2% Use Tax on all Building Permits; $50.00 One Stop tier not ruled out | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00', plus 'Use Tax on all Building Permits 2%'. The schedule does not itself name 'deck/patio cover/carport' under either tier. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table. |
EV Charger / EVSE Permit
The Town of Nunn does not publish a dedicated EV charger/EVSE permit type. Installation of a Level 2 EV charger is permitted under the Town's standard Electrical Permit, administered on the Town's behalf by its contracted plan-review/inspection provider, SAFEbuilt. As with all electrical work in Nunn, the Town verifies the installing electrician's Colorado DORA state electrical license before accepting the application (per C.R.S. 12-115-120(1)/(10), HB19-1086) — Nunn has no local electrical contractor licensing program of its own. The Town's 2026 Fee Schedule publishes a general two-tier Building Permit Admin Fee ($75 plan-review / $50 One Stop) plus a 2% Use Tax, but names no EV-specific line item, so no EV-specific dollar figure can be verified.
Reviewed 2026-07-23 · Source
Requirements
- Electrical permit application must list the electrician's Colorado DORA state electrical license number; the Town verifies it is active before accepting the application
- Governed by the National Electrical Code as adopted by reference in Nunn Municipal Code 15.04.040 (codified as the 2002 edition, though SAFEbuilt's current operational submittal guidance references the 2020 NEC — an unresolved discrepancy)
- If the electrician performing the work changes before final inspection, the Town must be notified and will re-verify the new electrician's license
- No EV-specific permit category, application, or dedicated fee line item is published by the Town of Nunn as of 2026-07-23 (the Town's general two-tier Building Permit Admin Fee structure applies instead — see fees below)
Required documents
- RequiredBuilding Permit Application (Electrical scope)Must list electrician name and Colorado DORA electrical license number
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | $50.00 flat Admin Fee if processed as a 'One Stop' permit, or $75.00 if SAFEbuilt plan review is required, plus 2% Use Tax on all Building Permits. No EV-specific line item is published. | The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring… Show full citationHideThe Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00', plus 'Use Tax on all Building Permits 2%'. The schedule does not name EV chargers or a generic 'electrical permit' under either tier, so which flat fee applies is not Town-published; both real figures are given here. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table. |
Sign Permit
VerifiedRequired for erecting, placing, displaying, or modifying most signs within Town of Nunn limits, per Nunn Municipal Code (NMC) Chapter 17.80 (Sign Code) — a full, dedicated sign ordinance with definitions, size/height/setback standards by sign type, an exemption list, and a prohibited-sign list. NMC 17.80.020(43) defines a 'sign permit' as 'a building permit issued...pursuant to the building code of the town or this sign code,' so sign permits are processed through the same Town Clerk's Office → SAFEbuilt intake used for all other Nunn building permits, rather than a separate standalone application. Large signs can additionally trigger Town Board design review under Chapter 17.44.
Verified 2026-08-14 · Source
Requirements
- No sign or modification to an existing sign may be erected, placed, or displayed outdoors within town limits without a permit, unless the sign is exempt under NMC 17.80.050 (NMC 17.80.030)
- Exempt from permit (NMC 17.80.050): public signs; interior/window signs; commemorative plaques; address signs (2 sq ft residential / 5 sq ft nonresidential max); special event signs; real estate signs (max 6 sq ft/4 ft height residential, 20 sq ft/6 ft height nonresidential, removed within 7 days of sale/rental); building identification signs; certain informational/directional signs; courtesy signs (max 4 sq ft per face/8 sq ft total); flags up to 20 sq ft; holiday decorations; and warning signs
- Requires a permit (NMC 17.80.060), each with its own size/height/setback standard: animated, arcade, awning, bulletin board, freestanding residential-district, residential development entryway, freestanding nonresidential-district (max height 25 ft; max 1 sign per street frontage, 2 per development, unless a Board of Trustees-approved master sign plan applies; sign area scales with building floor area per the ordinance's table), illuminated, portable (A-frame/pedestal, max 6 sq ft), projecting, public information, temporary subdivision/construction, under-canopy, and wall/painted signs
- Sign setbacks (NMC 17.80.040(h)): 10 ft from adjacent residential-zoned property (no setback required adjacent to nonresidential); from a public right-of-way, 1 ft of setback per ft of sign height up to 6 ft, then 1 additional ft of setback for each additional ft of height above 6 ft
- All signs exceeding one square foot of surface area for every three feet of lot frontage are subject to Town Board approval under Chapter 17.44 (Building Review) per NMC 17.36.020(b)(3)
- Sign structure design (materials, allowable stresses, engineering) must conform to the town-adopted building code (NMC 17.80.040(f))
- Prohibited outright (NMC 17.80.080): roof signs, revolving signs, flashing/animated signs (except barber pole, windmill, and time-and-temperature signs), signs violating the sight-distance triangle, off-premises non-public signs without a Board of Trustees special permit, and outdoor advertising signs not approved by CDOT
- Nonconforming signs may not be rebuilt, enlarged, relocated, or reconstructed without being brought into conformance, and must be removed or conform if their use is discontinued for 60+ consecutive days (NMC 17.80.040(a)-(b))
Required documents
- RequiredBuilding Permit Application (Sign scope)The Town's standard generic Building Permit Application; submitted to the Town Clerk's Office or emailed to kendra.minch@townofnunnco.gov, then forwarded to SAFEbuilt
- RequiredSign Plan / DrawingShowing sign type, dimensions, height, illumination, and setback from property lines and the public right-of-way, per NMC 17.80.040(f)-(h)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | $50.00 flat Admin Fee if processed as a 'One Stop' permit, or $75.00 if SAFEbuilt plan review is required, plus 2% Use Tax on all Building Permits | NMC 17.80.030 ties sign-permit fees to 'the fee schedule adopted by the town at the time of the permit request.' The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF) sets exactly two… Show full citationHideNMC 17.80.030 ties sign-permit fees to 'the fee schedule adopted by the town at the time of the permit request.' The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF) sets exactly two Building-Permit Admin Fee tiers town-wide ($75 plan-review / $50 One Stop) plus a 2% Use Tax, with no sign-specific line item. Which tier applies to a given sign scope is not Town-published; both real figures are given here rather than guessing one. This is the Town Clerk's own flat component only — SAFEbuilt's own valuation-based component, if any, is unpublished. |
Fire Sprinkler / Fire Alarm Permit
VerifiedThe Town of Nunn's own Title 15 Building Code chapter expressly reserves fire code adoption — NMC 15.04.060 reads in full: '(Reserved for fire code adoption.)' — meaning the Town has not locally adopted any edition of the International Fire Code; other adopted-code sections (e.g., IBC 101.4.5, IEBC) refer only generically to an 'Adopted Fire Code' without naming an edition or adopting authority. Fire protection and emergency response for the Town of Nunn is provided by the Nunn Fire Protection District (identified on the Town's own website as the 'Nunn Fire District' / 'Nunn Volunteer Fire Department'), an independent volunteer fire department headquartered at 487 Logan Avenue (5th and Logan), Nunn, CO 80648, serving roughly 529 square miles of northern Weld County. After an exhaustive search — the Town of Nunn's Building/Planning, Fire Department, and Utilities and Service Providers pages; the full-text Nunn Municipal Code; and a direct search for an independent Nunn Fire Protection District website — no dedicated fire sprinkler or fire alarm permit application, fee schedule, or plan-review process is published by either the Town or the fire district; the district has no government website of its own (only a Facebook page), and is not linked from the Town's Building/Planning page.
Verified 2026-08-14 · Source
Requirements
- Neither the Town of Nunn nor the Nunn Fire Protection District publishes a standalone fire sprinkler or fire alarm permit type, application, fee schedule, or review process
- NMC 15.04.060 (Title 15, Building Code chapter) is expressly labeled 'Reserved for fire code adoption' — the Town has adopted no International Fire Code edition of its own
- Fire protection for the Town of Nunn is provided by the Nunn Fire Protection District, a volunteer department headquartered at 487 Logan Avenue (5th and Logan), Nunn, CO — contact 970.897.2329 / nunnfire@ezlink.com — confirmed via the Town of Nunn's own Fire Department and Utilities and Service Providers webpages; the district publishes no independent.gov website, application, or fee information of its own
- Two-family dwellings (duplexes) built in Nunn require an automatic residential fire sprinkler system under IRC Section R313.2 as locally amended (NMC 15.04.120) — single-family dwellings are exempt from this local amendment, and townhomes remain governed by the unamended IRC R313.1 sprinkler requirement; this requirement is implemented through the standard Building Permit (Town Clerk's Office → SAFEbuilt) process for the underlying duplex construction, not a separate sprinkler-specific permit
- Confirm any commercial fire alarm or fire sprinkler system project with both the Town Clerk's Office (970-897-2385 / kendra.minch@townofnunnco.gov) and the Nunn Fire Protection District (970.897.2329) before design — neither publishes a submittal checklist, plan-review process, or fee for these systems
Required documents
- OptionalBuilding Permit Application (if sprinkler/alarm work accompanies an underlying construction permit)The Town's standard generic Building Permit Application, submitted to the Town Clerk's Office; no sprinkler/alarm-specific application is published
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire sprinkler / fire alarm permit fee | No fire sprinkler or fire alarm permit fee is published by the Town of Nunn (checked the 2026 Fee Schedule, which contains no fire-related line item) or by the Nunn Fire Protection District (which… Show full citationHideNo fire sprinkler or fire alarm permit fee is published by the Town of Nunn (checked the 2026 Fee Schedule, which contains no fire-related line item) or by the Nunn Fire Protection District (which publishes no fee schedule of any kind). Contact the Town Clerk's Office at 970-897-2385 / kendra.minch@townofnunnco.gov, or the Nunn Fire Protection District directly at 970.897.2329 / nunnfire@ezlink.com, for a project-specific quote. A duplex's mandatory sprinkler system (IRC R313.2) would fall under that project's general Building Permit Admin Fee ($75 plan-review / $50 One Stop, per the 2026 Fee Schedule) plus SAFEbuilt's own unpublished valuation-based component, rather than a separate fire-specific fee. |
Change of Use / Change of Occupancy Permit
VerifiedThe Town of Nunn does not publish a distinct 'Change of Use' permit application, checkbox, or fee line item, but a change of use is unambiguously permit-required: NMC 15.08.010 (General provisions) makes it 'unlawful to erect, construct, reconstruct, alter, move, locate, use, or change the use of any building or other structure within the town limits without obtaining a building permit.' The Town's own generic Building Permit Application states verbatim: 'Any change in the use or occupancy of the building must be approved prior to proceeding with consruction [sic].' A change of use is therefore processed through the identical Town Clerk's Office → SAFEbuilt intake used for every other Nunn permit type, marking 'Other' on the application's Type field and describing the occupancy change under 'Description of Work' and 'Proposed Use.' Substantively, occupancy classification changes fall under Chapter 10 ('Change of Occupancy') of the 2018 International Existing Building Code, adopted by reference at NMC 15.04.130 with no local amendment to that chapter. Separately, at the zoning level, NMC 17.40.040 (Change in use) restricts what a legally nonconforming use may change into.
Verified 2026-08-14 · Source
Requirements
- NMC 15.08.010: it is unlawful to 'use, or change the use of any building or other structure' within town limits without a building permit — a change of use requires a permit even absent new construction
- The Town's own Building Permit Application form states verbatim: 'Any change in the use or occupancy of the building must be approved prior to proceeding with consruction [sic]' — approval must be obtained before the new use/occupancy proceeds
- No dedicated 'change of use' checkbox exists on the application: the 'Type' field offers only New Build / Addition / Remodel / Other, and 'Proposed Use' offers Residential (One Family / Multi Family) or Commercial/Industrial (Shell Only / Tenant Finish); a change-of-use application marks 'Other' and describes the change under 'Description of Work'
- Substantively governed by Chapter 10 ('Change of Occupancy') of the 2018 International Existing Building Code, adopted by reference at NMC 15.04.130, chapters 1 through 16 inclusive, with no local amendment to Chapter 10 specifically (confirmed by reading NMC 15.04.130 in full: its only three amendments concern fire-code cross-references, the code title, and moved-structure conformance)
- At the zoning level, NMC 17.40.040 (Change in use) prohibits changing a legally nonconforming use to a use of lower or less restrictive classification; a nonconforming use may be changed only to a use of the same or higher classification
- As with all Nunn building permits, the application and any supporting description are submitted to the Town Clerk's Office (or emailed to kendra.minch@townofnunnco.gov), then forwarded to SAFEbuilt for review
- Nunn has no distinct commercial-building or tenant-improvement (TI) permit type either (see also the residential-building-permit entry) — commercial/industrial 'Shell Only' or 'Tenant Finish' scopes, including any accompanying change of use, are processed through this same generic Building Permit Application
Required documents
- RequiredBuilding Permit Application (Type: 'Other'; describe change of use/occupancy)The Town's standard generic Building Permit Application, submitted to the Town Clerk's Office or emailed to kendra.minch@townofnunnco.gov; mark 'Other' under Type and fully describe the current and proposed use under 'Description of Work'
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Admin Fee (Building Permit) + Use Tax | $50.00 flat Admin Fee if processed as a 'One Stop' permit, or $75.00 if SAFEbuilt plan review is required, plus 2% Use Tax on all Building Permits | No change-of-use-specific line item is published in the Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (verified by rendering the PDF's two-column layout to an image and reading it directly). Show full citationHideNo change-of-use-specific line item is published in the Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (verified by rendering the PDF's two-column layout to an image and reading it directly). A change of use is billed under the same general two-tier Building Permit Admin Fee structure as every other undifferentiated Nunn permit type; which tier applies is not Town-published. This is the Town Clerk's own flat component only — SAFEbuilt's own valuation-based component, if any accompanies the change of use, remains unpublished. |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.