Version history — Nunn, Colorado
This is PermitBase’s own verified record for Nunn, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Nunn’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-20Superseded
- 2026-08-14Superseded
- Nunn, Colorado — Sign Permit record added
- Nunn, Colorado — Fire Sprinkler / Fire Alarm Permit record added
- Nunn, Colorado — Change of Use / Change of Occupancy Permit record added
- 2026-07-23Superseded
- Nunn, Colorado — fee schedule re-verified across 9 permit types
- 2026-07-20Superseded
- Nunn, Colorado — EV Charger / EVSE Permit record added
- Nunn, Colorado — Rooftop / Ground-Mounted Solar Photovoltaic Permit fee record added: Building/Electrical Permit Fee (SAFEbuilt-calculated, valuation-based) (Statewide electrical component follows C.R.S. § 12-23-117: base fee ~$100-$120 for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, scalable up to 1.15x by the local government — capped in aggregate at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113)
- Nunn, Colorado — Rooftop / Ground-Mounted Solar Photovoltaic Permit fee record removed: Building/Electrical Permit Fee
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Nunn began