Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-07.

Severance building permits

Verified

Severance, Colorado — as published 2026-07-07.

Verified 2026-07-23 · Source

Codes adopted

2024 International Residential Code (IRC) — Town of Severance 'Design Criteria Town of Severance' document (SAFEbuilt/Town primary source, DocumentCenter/View/1106), Residential Construction section2024 International Energy Conservation Code (IECC) — same source, Residential Construction section2023 National Electrical Code (NEC) — same source, listed under both Residential and Commercial Construction sections2024 International Building Code (IBC) — same source, Commercial Construction section2024 International Plumbing Code (IPC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (library.municode.com/co/severance, Chapter 18, Article 4, Sec. 18-4-10, successfully retrieved live via browser rendering on 2026-07-23) states: 'The International Plumbing Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Plumbing Code' (Ord. 2019-07 § 4; Ord. No. 2025-27, § 6, enacted Dec. 9, 2025) — i.e. the codified ordinance readopted/carried forward the 2018 IPC edition even in the same Dec. 9, 2025 recodification that moved most other codes to 2024. The codified Municipal Code (the Town's actual adopted law) is treated as authoritative over the SAFEbuilt client-facing summary sheet for this fact; IPC is 2018, not 2024, in Severance.2024 International Mechanical Code (IMC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. 18-3-10, retrieved live 2026-07-23) states: 'The International Mechanical Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Mechanical Code' (Ord. No. 2025-27, § 4, enacted Dec. 9, 2025) — the same Dec. 9, 2025 recodification ordinance that adopted 2024 IBC/IRC/IECC/IFGC/IPMC/IEBC left IMC at the 2018 edition. The codified Municipal Code is treated as authoritative over the SAFEbuilt summary sheet; IMC is 2018, not 2024, in Severance.2024 International Fuel Gas Code (IFGC) — same source, Commercial Construction section2024 International Energy Code — same source, Commercial Construction section (listed as a separate line from the 2024 IECC entry under Residential; the Town's document does not clarify whether these are intended as the same document cited twice or two distinct adoptions, so both are recorded as they appear on the primary source)2024 Pool and Spa Code — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 12, Sec. 18-12-10, retrieved live 2026-07-23) states: 'The International Swimming Pool and Spa Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Swimming Pool and Spa Code' (Ord. No. 2025-27, § 9, enacted Dec. 9, 2025). The codified Municipal Code is treated as authoritative; ISPSC is 2018, not 2024, in Severance. (No standalone swimming-pool permit-type entry exists in this file's permitTypes array, so this correction is recorded here only; the 2024 Swimming Pools Guide, DocumentCenter/View/203, is a generic SAFEbuilt trade guide and does not itself state a code edition or fee/timeline figure.)2024 International Property Maintenance Code — same source, 'Other Adopted Codes' section2024 International Existing Building Code — same source, 'Other Adopted Codes' sectionState Codes (as listed on the Town's own Design Criteria document): Electric Ready, Solar Ready, EV Ready — consistent with Colorado HB22-1362's statewide energy/electrification floor (2021 IECC-derived electric-ready, solar-ready, EV-ready provisions, effective window July 2023-July 2026); confirmed independently by the '2026 SAFEbuilt Residential Application Checklist' (DocumentCenter/View/1149), which requires EV-ready (min. 40A circuit within 3ft of a car space), Solar-ready (roof-plan solar zones, prewire routing, truss dead-load verification), and Electric-ready (pre-wire location/note and full electric-appliance load calculation for new single-family, two-family, and townhome dwellings) documentation for permit submittal, and by the New Commercial Plan Submittal Procedure (DocumentCenter/View/182), which states 'EV ready, Solar ready and Electric ready are now required to be shown on plans.'Note on a separate SAFEbuilt-published document: the '2023 NEC Photovoltaic System Submittal Requirements' guide (DocumentCenter/View/210, last revised 08.11.2023) states 'Applicable current codes are the 2023 NEC, 2018 International Codes' — this conflicts with the Town-specific 2024 Client Design Criteria document and appears to be a generic/stale SAFEbuilt template not yet updated to Severance's current 2024 code cycle; the Town's own jurisdiction-specific Design Criteria document (2024, explicitly labeled 'Severance') is treated as authoritative for this file rather than the generic PV guide.Note on a secondary (non-.gov, AI-generated meeting-summary) source found during research: a Citizen Portal article describing a Severance Town Council work session states building official Russ Weber (SAFEbuilt) briefed Council on the 2024 ICC model codes and state-mandated changes, and that no formal adoption ordinance/vote occurred at that specific work session — Council directed staff to return with a formal adoption package excluding wildfire-resiliency provisions pending clarification. This source was NOT used as a citation for any fact in this file (it is a third-party AI-summarized meeting recap, not an official Town/.gov document, and is explicitly excluded per this project's official-sources-only policy). It is noted here only as context for why a formal Chapter 18 Municode ordinance number could not be independently confirmed in the original research session — Municode's Severance library (library.municode.com/co/severance) returned only its client-side Angular application shell (no server-rendered ordinance text) to both a standard WebFetch and a full-browser-header curl request in that session. The Town's own primary-source Design Criteria and permit-guide PDFs (all dated 2026 or explicitly labeled '2024 IRC'/'2024 International Codes') were used instead as the governing record of currently-adopted codes at that time.UPDATE 2026-07-23: Municode's Severance library WAS successfully retrieved this session using the Claude Browser pane (direct navigation with specific nodeId query parameters, e.g. ?nodeId=CH18BURE_ART1BUCO, renders the JS-driven Angular SPA's actual section text — a plain WebFetch/curl request only ever returns the pre-render shell). The codified Municipal Code confirms: 'SEVERANCE MUNICIPAL CODE Codified through Ordinance No. 2025-27, enacted December 9, 2025' (Supp. No. 15, online content updated June 29, 2026), which repealed and re-enacted Chapter 18 Articles 1-10 and 12 in full. This resolved the previously-unconfirmed ordinance number (Ord. No. 2025-27 is exactly the Dec-2025-era code-adoption ordinance this file's original research could not pin down) and, on cross-check against every article, surfaced three code-edition corrections against the SAFEbuilt Design Criteria PDF: IMC and IPC are codified at the 2018 edition (not 2024) per Ord. No. 2025-27 §§ 4 and 6, and the Swimming Pool and Spa Code is codified at the 2018 edition (not 2024) per Ord. No. 2025-27 § 9 — see the corrected codesAdopted entries above. IBC, IRC, IECC, IFGC, IPMC, and IEBC are independently confirmed at the 2024 edition per the same ordinance (Sec. 18-1-10, 18-2-10, 18-8-10, 18-6-10, 18-9-10, 18-10-10), and NEC is confirmed at 2023 (Sec. 18-4-40, Ord. No. 2023-09). Chapter 18, Article 11 (Building Permits, Sec. 18-11-10 'Issuance' and Sec. 18-11-20 'Surcharge') was also checked in full: it contains only permit-issuance criteria and the administration surcharge (30% of inspection fees or $30.00, matching this file's existing Administration Fee line) — no permit-type-specific review-timeline SLA and no demolition-specific fee or process are codified anywhere in Chapter 18, confirming (from the Town's own adopted law, the strongest available primary source) that the review-timeline and demolition-fee gaps noted throughout this file's permitTypes are genuine publication gaps rather than a research miss. Separately, Ordinance No. 2025-08 adopted the 2024 International Fire Code (not previously tracked in this file's codesAdopted list; out of scope to add here since no fire-permit type exists in this file's permitTypes array).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family, two-family, and townhome construction in the Town of Severance. Reviewed under the 2024 IRC and 2024 IECC (as adopted per the Town's Design Criteria document) plus the state-mandated Electric Ready/Solar Ready/EV Ready provisions. All plan review and inspections are performed by SAFEbuilt Colorado under contract to the Town; permits are applied for online via the Community Core portal.

Verified 2026-07-23 · Source

Requirements

  • Plans must comply with the 2024 IRC and 2024 IECC as adopted, and meet the Town's Design Criteria: 115 mph ultimate wind speed (ice and water shield + under-floor protection required), Seismic Design Category B, 30-inch frost line, 30 PSF roof live load / 15 PSF roof dead load / 30 PSF ground snow load
  • EV-ready, Solar-ready, and Electric-ready documentation required per the 2026 SAFEbuilt Residential Application Checklist: minimum 40-amp EV circuit within 3 ft of a parking space; roof plan solar-ready zone(s) with prewire routing and truss dead-load verification; electric-ready prewire note and full-load calculation for new single-family/two-family/townhome dwellings
  • Manual J, D, and S compliance calculations required
  • 2024 IECC energy code compliance required via ResCheck or an energy rating company report, or full prescriptive-method documentation
  • Engineered structural plans and foundation plans stamped by a Colorado-licensed engineer
  • Metro District/HOA approval letter required if applicable (check with subdivision ARC committee before submitting)
  • Contractor must hold a current Town of Severance Contractor License (Class A or B) plus, for electrical/plumbing trades, a current Colorado State license (contemporaneously verified, no separate town fee for those trades)
  • Since 2015: footing, foundation reinforcement, perimeter drain (Colorado-licensed engineer inspection), and U-fer ground engineer letters plus a signed Town Setback Certification form must be submitted to SAFEbuilt before the underground plumbing inspection and before framing begins
  • Applications submitted online via the Community Core portal only

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Town of Severance Community Core portal
  • RequiredSite/Plot PlanProperty address, north arrow/scale, lot dimensions, all projections, distances to property lines and existing structures, registered design professional's seal
  • RequiredArchitectural/Floor Plans, Engineered Structural Plans, Electrical Plans, Mechanical PlansMaster set with all elevations/options; electrical plans must address Electric/Solar/EV-ready per current checklist
  • RequiredManual J, D, and S Compliance Calculations
  • Required2024 IECC Energy Code Compliance (ResCheck or equivalent)
  • OptionalMetro District/HOA Approval LetterRequired if the property is within a Metro District or HOA with ARC review
  • RequiredSetback Certification Letter and FormSigned and stamped by a Colorado-licensed surveyor; required before underground plumbing inspection/framing and again at Certificate of Occupancy

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt ColoradoVERIFIED-NEGATIVE, RE-CONFIRMED 2026-07-23 on the live current Fee Schedule: the Town's 2026 Fee Schedule PDF (revised 12/9/2025, re-fetched and full-text-extracted this session) contains a section literally titled 'BUILDING PERMIT FEES' whose complete, exhaustive content is exactly three line items — Use Tax (3% of 60% of valuation, 'as Determined by SafeBuilt'), Administration Fee, and Planning Review Fee — with no base valuation-based dollar table anywhere in that section or the rest of the 10-page document. This confirms, directly from the Town's own official fee ordinance/schedule (not merely 'not located in research'), that SAFEbuilt's underlying valuation fee table is genuinely not published by the Town for any permit type. Also checked the blank office-use Building Permit Application form (DocumentCenter/View/166 and /178) and an alternate-ID copy of the fee schedule (DocumentCenter/View/301, byte-identical to /334) — neither adds a dollar figure. Confirm a project-specific quote directly with SAFEbuilt or the Building Department.
Use Tax3% assessed on 60% of the Total Valuation of Improvement as determined by SAFEbuilt2026 Fee Schedule, Town of Severance, revised 12/9/2025 (Sec. 4, 'BUILDING PERMIT FEES')
Administration FeeGreater of 30% of total inspection fees or $30.00
Planning Review FeeGreater of 15% of total inspection fees or $30.00
Transportation Impact Fee (Single Family, per unit)$6,075.00
Park Impact Fee (Single Family, per unit)$1,645.00
General Government Impact Fee (Single Family, per unit)$2,611.00
Police Impact Fee (Single Family, per unit)$749.00
Water Utility Impact Fee (3/4-inch meter)$16,975.00
Card Processing Fee3% surcharge on credit/debit card payments; no fee for e-checkPaid via Community Core

Residential Addition / Remodel / Accessory Structure Permit

Verified

Required for home additions, basement finishes, kitchen remodels, structural modifications, accessory structures (over 120 sq ft or over a 10-ft peak), and similar residential renovation work in Severance, including Accessory Dwelling Units built as an addition or accessory structure. Reviewed under the 2024 IRC as adopted; SAFEbuilt Colorado performs plan review and inspections.

Verified 2026-07-23 · Source

Requirements

  • A permit is required for additions, basement finishes (partial or full), kitchen remodels, structural modifications (including wall removal/addition), siding/stucco/brick work, and accessory structures exceeding 120 sq ft or a 10-ft peak height
  • Site plan showing the project's relationship to setbacks, easements, utilities, and other structures/property lines required
  • A survey from a registered land surveyor required if the project is in a protected area; an as-built survey required if proposed within 12 inches of a required minimum setback
  • Combustion equipment (furnaces, water heaters, etc.) may need to comply with the State of Colorado Electric Ready Code
  • No standalone Accessory Dwelling Unit (ADU) permit type exists in Severance; ADU construction is processed through this addition/accessory-structure pathway once the ADU is confirmed as a zoning-allowed use under Chapter 16 (Land Use Code) of the Municipal Code. CONFIRMED 2026-07-23 via the Town's codified Municipal Code: Ordinance No. 2026-01 (adopted 3/10/26, published 3/19/26, effective 30 days later per Sec. 6.03(6) of the Town's Home Rule Charter, i.e. ~4/18/26 — currently in force) amended Chapter 16 Tables 16.3.220 (Suburban Perimeter), 16.3.320 (Town Core), and 16.3.420 (Development Node) 'to bring the Town's Code into compliance with ... HB24-1152.' All three tables list 'Accessory dwelling unit' as a permitted use-by-right (n/a minimum lot size/density) with dimensional standards: front setback 'Behind front of principal dwelling', side setback 7.5 ft, corner side setback 15 ft, rear setback reduced by this ordinance from 15 ft to 5 ft, maximum height 2 stories — confirming ADUs are a real, currently-effective zoning-allowed use in all three districts, not merely a 2025-dated draft document reference.
  • Contractor must hold a current Town of Severance Contractor License; homeowners performing their own work at a single residence are exempt from the contractor-license requirement (but not from permitting)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via Community Core
  • RequiredSite PlanProperty survey showing setbacks, easements, utilities, distances to property lines and other structures
  • RequiredConstruction Details / Floor Plan

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt ColoradoVERIFIED-NEGATIVE, RE-CONFIRMED 2026-07-23: the Town's 2026 Fee Schedule's 'BUILDING PERMIT FEES' section contains exactly three line items (Use Tax, Administration Fee, Planning Review Fee) and no base valuation-based dollar table for any permit type — see the residential-building-permit entry's fee note for the full citation. This is a town-wide publication gap, not specific to additions/remodels.
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt
Administration FeeGreater of 30% of total inspection fees or $30.00
Planning Review FeeGreater of 15% of total inspection fees or $30.00

Electrical Permit

Verified

Required for electrical installation, alteration, or modification work in Severance. Governed by the 2023 NEC as adopted. Severance does NOT run its own local electrical licensing/examination program — electricians must hold a current Colorado State (and Master) Electrical license, contemporaneously verified against the DORA State Electrical Board per the Town's Contemporaneous Review procedure; the local Contractor License Application confirms this trade is 'Verified through the State, no fee.'

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2023 NEC as adopted by the Town
  • Electricians must hold a current Colorado State Electrical license and Master Electrician license, plus a State-issued ID, contemporaneously verified per the Town's Procedure for Contemporaneous Reviews of Electrical & Plumbing Licenses (referencing dpo.colorado.gov/EandP/ContemporaneousReview)
  • No separate Town electrical trade exam or local licensing fee — the Contractor License Application lists Electrical under Class C Trades as 'Verified through the State, no fee'
  • Electric-ready, Solar-ready, and EV-ready provisions require load calculations, one-line diagrams, and fault-current analysis to be shown on electrical plans for new residential and commercial construction

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted via Community Core
  • RequiredColorado State Electrical License and Master Electrician LicenseVerified contemporaneously by the Town/SAFEbuilt against DORA's State Electrical Board records

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection Fee (electrical valuation)Valuation-based, determined by SAFEbuilt ColoradoBuilding Permit Application form requires a separate 'New Building Electrical Valuation' entry for commercial/industrial projects
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt
Administration FeeGreater of 30% of total inspection fees or $30.00

Plumbing Permit

Verified

Required for plumbing installation, alteration, or modification work in Severance. The Town's SAFEbuilt-published 2024 Client Design Criteria document labels this '2024 IPC' for commercial work (IRC plumbing provisions govern residential work), but the Town's own codified Municipal Code (Chapter 18, Article 4, Sec. 18-4-10, confirmed live 2026-07-23) states the IPC is adopted at the 2018 Edition (Ord. 2019-07 § 4; Ord. No. 2025-27 § 6, enacted Dec. 9, 2025) — the codified ordinance is treated as authoritative for this fact. Like electrical, Severance does NOT run its own local plumbing licensing program — plumbers must hold a current Colorado State (and Master) Plumbing license, contemporaneously verified against the DORA State Plumbing Board.

Verified 2026-07-23 · Source

Requirements

  • Governed by the 2018 IPC (commercial, per the codified Municipal Code Sec. 18-4-10) / 2024 IRC plumbing provisions (residential) as adopted — note the Town's SAFEbuilt Design Criteria summary PDF labels commercial plumbing '2024 IPC,' but the codified ordinance itself (Ord. No. 2025-27 § 6) states 2018
  • Plumbers must hold a current Colorado State Plumbing license and Master Plumber license, plus a State-issued ID, contemporaneously verified per the Town's Contemporaneous Review procedure
  • No separate Town plumbing trade exam or local licensing fee — listed on the Contractor License Application as 'Verified through the State, no fee'
  • Plumbing modifications (water heater installation/replacement, gas piping, gas log installation) require a permit per the What Needs a Permit guide

Required documents

  • RequiredBuilding/Plumbing Permit ApplicationSubmitted via Community Core
  • RequiredColorado State Plumbing License and Master Plumber LicenseVerified contemporaneously by the Town/SAFEbuilt against DORA's State Plumbing Board records

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt Colorado
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt
Administration FeeGreater of 30% of total inspection fees or $30.00

Mechanical / HVAC Permit

Verified

Required for HVAC, furnace, boiler, and mechanical equipment installation or replacement in Severance. The SAFEbuilt-published 2024 Client Design Criteria document labels this '2024 IMC and 2024 IFGC' for commercial work (residential mechanical work follows the 2024 IRC's mechanical provisions), but the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. 18-3-10, confirmed live 2026-07-23) states the IMC is adopted at the 2018 Edition (Ord. No. 2025-27 § 4, enacted Dec. 9, 2025) — the codified ordinance is treated as authoritative for this fact. The IFGC is independently confirmed at the 2024 edition (Chapter 18, Article 6, Sec. 18-6-10, Ord. No. 2025-27 § 5), matching the Design Criteria document.

Verified 2026-07-23 · Source

Requirements

  • Governed by the 2018 IMC (per the codified Municipal Code Sec. 18-3-10, Ord. No. 2025-27 § 4) and the 2024 IFGC (Sec. 18-6-10, Ord. No. 2025-27 § 5) as adopted — note the Town's SAFEbuilt Design Criteria summary PDF labels commercial mechanical '2024 IMC,' but the codified ordinance itself states 2018
  • Air conditioner and furnace installation/replacement, boiler installation/replacement, and gas piping/gas log work all require a permit per the What Needs a Permit guide
  • Combustion equipment may need to comply with the State of Colorado Electric Ready Code
  • Mechanical plans (duct sizes/locations, equipment location) required as part of residential and commercial submittal packages

Required documents

  • RequiredBuilding/Mechanical Permit ApplicationSubmitted via Community Core
  • RequiredMechanical PlansDuct sizes and locations, equipment locations, termination sizes/locations

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt ColoradoVERIFIED-NEGATIVE, RE-CONFIRMED 2026-07-23: the Town's 2026 Fee Schedule's 'BUILDING PERMIT FEES' section contains exactly three line items (Use Tax, Administration Fee, Planning Review Fee) and no base valuation-based dollar table for any permit type — see the residential-building-permit entry's fee note for the full citation. This is a town-wide publication gap, not specific to mechanical/HVAC work.
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt
Administration FeeGreater of 30% of total inspection fees or $30.00

Re-Roof Permit

Verified

Required for re-roofing work in Severance (one permit per building on the property). Governed by the 2024 IRC as adopted; the Town publishes a dedicated 2024-IRC Residential Re-Roofing guide (SAFEbuilt, published 1.1.2026).

Verified 2026-07-06 · Source

Requirements

  • One permit is required per building on the property for re-roofing
  • No more than two (2) layers of roofing are allowed upon completion of installation
  • Roof sheathing must provide a rigid surface for complete tear-offs; warped/cracked/delaminated boards must be repaired or replaced
  • New minimum 15# asphalt-saturated felt underlayment required on a dry deck for complete tear-offs, with lap requirements varying by roof slope (one layer for 4:12+ slopes; 19-inch laps for 2:12-4:12 slopes)
  • Fasteners must penetrate through the total roofing thickness and a minimum of 3/4 inch into the decking material
  • Existing roof jacks/vents in poor condition, badly rusted, or deteriorated must be replaced
  • Homeowners may perform their own re-roof work
  • Shingle repair/replacement not exceeding 100 sq ft of coverage per building is exempt from permitting

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt ColoradoNo separate flat re-roof fee published; billed under the general valuation-based schedule
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt

Rooftop Solar / Photovoltaic Permit

Verified

Required for solar panel installation or replacement in Severance. Electrical work governed by the 2023 NEC; a dedicated SAFEbuilt Photovoltaic System Submittal Requirements guide governs structural, electrical, and building-plan submittals, though that guide's own code-currency line ('2023 NEC, 2018 International Codes') appears to be a stale/generic template relative to the Town's current 2024 Design Criteria document.

Verified 2026-07-23 · Source

Requirements

  • Permit application valuation must be based on total cost to the customer (contract price), including materials and labor, regardless of whether provided by the contractor or property owner
  • Plan review required for each building on a property; separate permits may be required per address
  • Structural engineer's stamped letter required, addressing added roof dead load and additional wind load from the panels; letter must state design to minimum 30 psf ground snow load, 115 mph Vult wind speed, wind exposure C, and Seismic Design Category B
  • Ground-mounted systems require a separate engineer-stamped letter for system support and wind load, using the same design criteria
  • Four-line electrical diagram required showing modules, circuits, wire sizes/insulation, conduit, junction boxes, inverter, combiner panel, disconnect, meter, fuses/breakers, and grounding
  • Roof-mount systems must use worst-case ambient temperature of 56-60 degrees C for conductor ampacity temperature-rating adjustments
  • Zoning compliance is the applicant's responsibility to verify directly with the jurisdiction
  • The color red may not be used on submitted plans by the preparer — reserved for plans examiner comments

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted via Community Core; describe work completely with contract-price valuation
  • RequiredStructural Engineer Stamped LetterAddressing roof dead load and wind load per the Town's 115 mph / 30 psf / Seismic B design criteria
  • RequiredFour-Line Electrical Diagram and Equipment Cut Sheets

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection Fee (based on contract-price valuation)Valuation-based, determined by SAFEbuilt Colorado
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt
Solar Arrays Impact Fee (Transportation)$10.00 per string
Solar Arrays Impact Fee (General Government)$10.00 per string
Solar Arrays Impact Fee (Police)$10.00 per string

Demolition Permit

Verified

Required to demolish any building or structure in Severance. Applied for through the same online Community Core process as other building permits; no standalone demolition-specific fee schedule or guide document was located separate from the general permit process.

Verified 2026-07-23 · Source

Requirements

  • A person, firm, or corporation cannot erect, construct, alter, repair, move, or demolish any building or structure without first obtaining a building permit, per the What Needs a Permit guide
  • All building permits, including demolition, are applied for online via Community Core

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via Community Core, describing the demolition scope

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt ColoradoVERIFIED-NEGATIVE, RE-CONFIRMED 2026-07-23: no demolition-specific fee line exists in the 2026 Fee Schedule (re-fetched and full-text-extracted this session; its 'BUILDING PERMIT FEES' section is exactly Use Tax + Administration Fee + Planning Review Fee for all permit types, demolition included). Also checked the Town's codified Municipal Code, Chapter 18 in full (all 12 articles, including Article 1 Sec. 18-1-40 'Violations,' which lists 'demolish' among the acts requiring a permit but creates no separate demolition fee category or process) — the codified ordinance confirms demolition is genuinely billed under the general valuation-based Building Permit Fee mechanism, not a research gap.

Commercial Tenant Finish / Remodel Permit

Verified

Required for commercial tenant finish and remodel work in Severance. Governed by the 2024 International Codes (2024 IBC/IPC/IMC/IFGC, 2024 IECC, 2023 NEC as adopted). The Town publishes a dedicated Commercial Tenant Finish/Remodel Plan Submittal Procedure distinct from new commercial construction.

Verified 2026-07-23 · Source

Requirements

  • Building permit application describing project scope, square footage, total project valuation, electrical valuation, surrounding-space use, construction type, and occupancy group
  • Architectural plans (stamped by a Colorado-licensed architect or engineer) required, including floor plan, wall section details, building section, fire-rating details, and code summary
  • Structural plans required for any structural changes (bearing wall removal/openings, floor systems for storage, etc.)
  • Electrical plans required for added circuits, service upgrades, or emergency lighting, including load calculations, one-line diagrams, and fault-current analysis
  • Mechanical plans required for any HVAC equipment changes, relocation, or replacement of ductwork/refrigeration piping
  • Plumbing plans required for any changes to sewer, drains, vents, water piping, roof drains, or gas piping
  • Documentation showing compliance with the 2024 IECC required
  • All plan sheets must bear the original seal of a Colorado-licensed architect or engineer per C.R.S., unless exempted under section 12-4-112 C.R.S.

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via Community Core
  • RequiredArchitectural, Structural, Electrical, and Mechanical/Plumbing PlansEach stamped by the appropriate Colorado-licensed design professional as applicable to project scope
  • Required2024 IECC Compliance Documentation

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt ColoradoVERIFIED-NEGATIVE, RE-CONFIRMED 2026-07-23: the Town's 2026 Fee Schedule's 'BUILDING PERMIT FEES' section contains exactly three line items (Use Tax, Administration Fee, Planning Review Fee) and no base valuation-based dollar table for any permit type — see the residential-building-permit entry's fee note for the full citation. This is a town-wide publication gap, not specific to commercial tenant finish work.
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt
Transportation Impact Fee (Commercial)$12,105.00 per 1,000 sq ft
Police Impact Fee (Commercial)$5,680.00 per 1,000 sq ft

Deck / Covered Patio / Carport Permit

Verified

Required for attached and detached decks, pergolas, patio covers, and carports in Severance. Governed by the 2024 IRC as adopted; the Town publishes dedicated Uncovered Decks & Porches and Patio Covers/Carport guides.

Verified 2026-07-06 · Source

Requirements

  • Site plan showing setbacks, house attachment details, guardrails, footings, and cross-section deck plan required per the Uncovered Decks & Porches guide
  • Owner-builders are the responsible party of record; hiring an unlicensed contractor who secures an 'owner-builder' permit while implying the owner is providing labor/materials personally is flagged as a frequent improper practice in the Town's own guide
  • Permits are valid for work to begin within six months of issuance

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via Community Core
  • RequiredSite Plan, House Attachment Detail, Guardrail Detail, Footing Detail, Cross-Section Deck PlanPer the Uncovered Decks & Porches guide's required submittal pages

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection FeeValuation-based, determined by SAFEbuilt Colorado
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt

EV Charger / Electric Vehicle Charging Station Permit

Verified

Severance does not publish a distinct EV-charger fee line or standalone EVSE permit type. Installing an EV charging station circuit is processed as electrical work under the Town's Electrical Permit mechanism already documented in this file: governed by the 2023 NEC as adopted, with electricians verified contemporaneously against their current Colorado State Electrical license (and Master Electrician license) per the Town's Procedure for Contemporaneous Reviews rather than a separate local trade exam. Severance is also one of the Colorado jurisdictions with an explicit, currently-enforced 'EV Ready' new-construction requirement (a minimum 40-amp dedicated circuit within 3 feet of a parking space), documented in the Town's own 2026 SAFEbuilt Residential Application Checklist and New Commercial Plan Submittal Procedure -- meaning many new homes and commercial buildings already have the EV circuit roughed in at construction, with a retrofit EV charger permit needed only when adding the circuit/charger to existing construction.

Verified 2026-07-20 · Source

Requirements

  • A building/electrical permit is required to install a new dedicated circuit and charging unit for an EV charging station in existing construction, processed under the Town's general Electrical Permit mechanism (2023 NEC as adopted)
  • Electricians must hold a current Colorado State Electrical license and Master Electrician license, contemporaneously verified per the Town's Procedure for Contemporaneous Reviews of Electrical & Plumbing Licenses (dpo.colorado.gov/EandP/ContemporaneousReview) -- no separate Town electrical exam or local licensing fee
  • New single-family, two-family, and townhome dwellings, and new commercial buildings, must already show an EV-ready minimum 40-amp dedicated circuit within 3 feet of a parking space on submitted plans per the 2026 SAFEbuilt Residential Application Checklist and the New Commercial Plan Submittal Procedure -- retrofitting a charger onto that pre-installed circuit may not require a new permit beyond the original construction permit, but adding a NEW circuit to existing construction does
  • Applications submitted online via the Community Core portal only

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted via Community Core, same application used for other electrical alteration work
  • RequiredColorado State Electrical License and Master Electrician LicenseVerified contemporaneously by the Town/SAFEbuilt against DORA's State Electrical Board records
  • RequiredLoad Calculation / Circuit DiagramNew EV charging circuit breaker sizing and panel capacity

Fee schedule

Fee typeAmountNotes
Building Permit / Inspection Fee (electrical valuation)Valuation-based, determined by SAFEbuilt ColoradoNo separately itemized flat EV-charger fee was found; billed under the same valuation-based electrical permit mechanism as other electrical alteration work
Use Tax3% assessed on 60% of Total Valuation of Improvement as determined by SAFEbuilt
Administration FeeGreater of 30% of total inspection fees or $30.00

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Severance building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/weld-county/severance/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.