Severance building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Severance, Colorado.
Last verified 2026-07-23 · Source · Embed this page’s badge · Version history
Building department
- Address
- 3 S. Timber Ridge Parkway, P.O. Box 339, Severance, CO 80546
- Phone
- 970-692-7315
- Office hours
- Monday-Friday, 8:00 am - 5:00 pm. General Permit Clerk / Town Hall line also published as 970-686-1218 (fax 970-686-6250) on Building Department PDF forms; primary Building Department contact line is 970-692-7315. Plan review and inspections are contracted out to SAFEbuilt Colorado, which uses its own contact channel (see inspections note).
- Website
- Official site
- Permit portal
- Apply online at Severance's portal
Inspection guide
See how inspections work in Severance — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- 2024 International Residential Code (IRC) — Town of Severance 'Design Criteria Town of Severance' document (SAFEbuilt/Town primary source, DocumentCenter/View/1106), Residential Construction section
- 2024 International Energy Conservation Code (IECC) — same source, Residential Construction section
- 2023 National Electrical Code (NEC) — same source, listed under both Residential and Commercial Construction sections
- 2024 International Building Code (IBC) — same source, Commercial Construction section
- 2024 International Plumbing Code (IPC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (library.municode.com/co/severance, Chapter 18, Article 4, Sec. 18-4-10, successfully retrieved live via browser rendering on 2026-07-23) states: 'The International Plumbing Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Plumbing Code' (Ord. 2019-07 § 4; Ord. No. 2025-27, § 6, enacted Dec. 9, 2025) — i.e. the codified ordinance readopted/carried forward the 2018 IPC edition even in the same Dec. 9, 2025 recodification that moved most other codes to 2024. The codified Municipal Code (the Town's actual adopted law) is treated as authoritative over the SAFEbuilt client-facing summary sheet for this fact; IPC is 2018, not 2024, in Severance.
- 2024 International Mechanical Code (IMC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. 18-3-10, retrieved live 2026-07-23) states: 'The International Mechanical Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Mechanical Code' (Ord. No. 2025-27, § 4, enacted Dec. 9, 2025) — the same Dec. 9, 2025 recodification ordinance that adopted 2024 IBC/IRC/IECC/IFGC/IPMC/IEBC left IMC at the 2018 edition. The codified Municipal Code is treated as authoritative over the SAFEbuilt summary sheet; IMC is 2018, not 2024, in Severance.
- 2024 International Fuel Gas Code (IFGC) — same source, Commercial Construction section
- 2024 International Energy Code — same source, Commercial Construction section (listed as a separate line from the 2024 IECC entry under Residential; the Town's document does not clarify whether these are intended as the same document cited twice or two distinct adoptions, so both are recorded as they appear on the primary source)
- 2024 Pool and Spa Code — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 12, Sec. 18-12-10, retrieved live 2026-07-23) states: 'The International Swimming Pool and Spa Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Swimming Pool and Spa Code' (Ord. No. 2025-27, § 9, enacted Dec. 9, 2025). The codified Municipal Code is treated as authoritative; ISPSC is 2018, not 2024, in Severance. (No standalone swimming-pool permit-type entry exists in this file's permitTypes array, so this correction is recorded here only; the 2024 Swimming Pools Guide, DocumentCenter/View/203, is a generic SAFEbuilt trade guide and does not itself state a code edition or fee/timeline figure.)
- 2024 International Property Maintenance Code — same source, 'Other Adopted Codes' section
- 2024 International Existing Building Code — same source, 'Other Adopted Codes' section
- State Codes (as listed on the Town's own Design Criteria document): Electric Ready, Solar Ready, EV Ready — consistent with Colorado HB22-1362's statewide energy/electrification floor (2021 IECC-derived electric-ready, solar-ready, EV-ready provisions, effective window July 2023-July 2026); confirmed independently by the '2026 SAFEbuilt Residential Application Checklist' (DocumentCenter/View/1149), which requires EV-ready (min. 40A circuit within 3ft of a car space), Solar-ready (roof-plan solar zones, prewire routing, truss dead-load verification), and Electric-ready (pre-wire location/note and full electric-appliance load calculation for new single-family, two-family, and townhome dwellings) documentation for permit submittal, and by the New Commercial Plan Submittal Procedure (DocumentCenter/View/182), which states 'EV ready, Solar ready and Electric ready are now required to be shown on plans.'
- Note on a separate SAFEbuilt-published document: the '2023 NEC Photovoltaic System Submittal Requirements' guide (DocumentCenter/View/210, last revised 08.11.2023) states 'Applicable current codes are the 2023 NEC, 2018 International Codes' — this conflicts with the Town-specific 2024 Client Design Criteria document and appears to be a generic/stale SAFEbuilt template not yet updated to Severance's current 2024 code cycle; the Town's own jurisdiction-specific Design Criteria document (2024, explicitly labeled 'Severance') is treated as authoritative for this file rather than the generic PV guide.
- Note on a secondary (non-.gov, AI-generated meeting-summary) source found during research: a Citizen Portal article describing a Severance Town Council work session states building official Russ Weber (SAFEbuilt) briefed Council on the 2024 ICC model codes and state-mandated changes, and that no formal adoption ordinance/vote occurred at that specific work session — Council directed staff to return with a formal adoption package excluding wildfire-resiliency provisions pending clarification. This source was NOT used as a citation for any fact in this file (it is a third-party AI-summarized meeting recap, not an official Town/.gov document, and is explicitly excluded per this project's official-sources-only policy). It is noted here only as context for why a formal Chapter 18 Municode ordinance number could not be independently confirmed in the original research session — Municode's Severance library (library.municode.com/co/severance) returned only its client-side Angular application shell (no server-rendered ordinance text) to both a standard WebFetch and a full-browser-header curl request in that session. The Town's own primary-source Design Criteria and permit-guide PDFs (all dated 2026 or explicitly labeled '2024 IRC'/'2024 International Codes') were used instead as the governing record of currently-adopted codes at that time.
- UPDATE 2026-07-23: Municode's Severance library WAS successfully retrieved this session using the Claude Browser pane (direct navigation with specific nodeId query parameters, e.g. ?nodeId=CH18BURE_ART1BUCO, renders the JS-driven Angular SPA's actual section text — a plain WebFetch/curl request only ever returns the pre-render shell). The codified Municipal Code confirms: 'SEVERANCE MUNICIPAL CODE Codified through Ordinance No. 2025-27, enacted December 9, 2025' (Supp. No. 15, online content updated June 29, 2026), which repealed and re-enacted Chapter 18 Articles 1-10 and 12 in full. This resolved the previously-unconfirmed ordinance number (Ord. No. 2025-27 is exactly the Dec-2025-era code-adoption ordinance this file's original research could not pin down) and, on cross-check against every article, surfaced three code-edition corrections against the SAFEbuilt Design Criteria PDF: IMC and IPC are codified at the 2018 edition (not 2024) per Ord. No. 2025-27 §§ 4 and 6, and the Swimming Pool and Spa Code is codified at the 2018 edition (not 2024) per Ord. No. 2025-27 § 9 — see the corrected codesAdopted entries above. IBC, IRC, IECC, IFGC, IPMC, and IEBC are independently confirmed at the 2024 edition per the same ordinance (Sec. 18-1-10, 18-2-10, 18-8-10, 18-6-10, 18-9-10, 18-10-10), and NEC is confirmed at 2023 (Sec. 18-4-40, Ord. No. 2023-09). Chapter 18, Article 11 (Building Permits, Sec. 18-11-10 'Issuance' and Sec. 18-11-20 'Surcharge') was also checked in full: it contains only permit-issuance criteria and the administration surcharge (30% of inspection fees or $30.00, matching this file's existing Administration Fee line) — no permit-type-specific review-timeline SLA and no demolition-specific fee or process are codified anywhere in Chapter 18, confirming (from the Town's own adopted law, the strongest available primary source) that the review-timeline and demolition-fee gaps noted throughout this file's permitTypes are genuine publication gaps rather than a research miss. Separately, Ordinance No. 2025-08 adopted the 2024 International Fire Code (not previously tracked in this file's codesAdopted list; out of scope to add here since no fire-permit type exists in this file's permitTypes array).
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family, two-family, and townhome construction in the Town of Severance. Reviewed under the 2024 IRC and 2024 IECC (as adopted per the Town's Design Criteria document) plus the state-mandated Electric Ready/Solar Ready/EV Ready provisions. All plan review and inspections are performed by SAFEbuilt Colorado under contract to the Town; permits are applied for online via the Community Core portal.
Residential Addition / Remodel / Accessory Structure Permit
Required for home additions, basement finishes, kitchen remodels, structural modifications, accessory structures (over 120 sq ft or over a 10-ft peak), and similar residential renovation work in Severance, including Accessory Dwelling Units built as an addition or accessory structure. Reviewed under the 2024 IRC as adopted; SAFEbuilt Colorado performs plan review and inspections.
Electrical Permit
Required for electrical installation, alteration, or modification work in Severance. Governed by the 2023 NEC as adopted. Severance does NOT run its own local electrical licensing/examination program — electricians must hold a current Colorado State (and Master) Electrical license, contemporaneously verified against the DORA State Electrical Board per the Town's Contemporaneous Review procedure; the local Contractor License Application confirms this trade is 'Verified through the State, no fee.'
Plumbing Permit
Required for plumbing installation, alteration, or modification work in Severance. The Town's SAFEbuilt-published 2024 Client Design Criteria document labels this '2024 IPC' for commercial work (IRC plumbing provisions govern residential work), but the Town's own codified Municipal Code (Chapter 18, Article 4, Sec. 18-4-10, confirmed live 2026-07-23) states the IPC is adopted at the 2018 Edition (Ord. 2019-07 § 4; Ord. No. 2025-27 § 6, enacted Dec. 9, 2025) — the codified ordinance is treated as authoritative for this fact. Like electrical, Severance does NOT run its own local plumbing licensing program — plumbers must hold a current Colorado State (and Master) Plumbing license, contemporaneously verified against the DORA State Plumbing Board.
Mechanical / HVAC Permit
Required for HVAC, furnace, boiler, and mechanical equipment installation or replacement in Severance. The SAFEbuilt-published 2024 Client Design Criteria document labels this '2024 IMC and 2024 IFGC' for commercial work (residential mechanical work follows the 2024 IRC's mechanical provisions), but the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. 18-3-10, confirmed live 2026-07-23) states the IMC is adopted at the 2018 Edition (Ord. No. 2025-27 § 4, enacted Dec. 9, 2025) — the codified ordinance is treated as authoritative for this fact. The IFGC is independently confirmed at the 2024 edition (Chapter 18, Article 6, Sec. 18-6-10, Ord. No. 2025-27 § 5), matching the Design Criteria document.
Re-Roof Permit
Required for re-roofing work in Severance (one permit per building on the property). Governed by the 2024 IRC as adopted; the Town publishes a dedicated 2024-IRC Residential Re-Roofing guide (SAFEbuilt, published 1.1.2026).
Rooftop Solar / Photovoltaic Permit
Required for solar panel installation or replacement in Severance. Electrical work governed by the 2023 NEC; a dedicated SAFEbuilt Photovoltaic System Submittal Requirements guide governs structural, electrical, and building-plan submittals, though that guide's own code-currency line ('2023 NEC, 2018 International Codes') appears to be a stale/generic template relative to the Town's current 2024 Design Criteria document.
Demolition Permit
Required to demolish any building or structure in Severance. Applied for through the same online Community Core process as other building permits; no standalone demolition-specific fee schedule or guide document was located separate from the general permit process.
Commercial Tenant Finish / Remodel Permit
Required for commercial tenant finish and remodel work in Severance. Governed by the 2024 International Codes (2024 IBC/IPC/IMC/IFGC, 2024 IECC, 2023 NEC as adopted). The Town publishes a dedicated Commercial Tenant Finish/Remodel Plan Submittal Procedure distinct from new commercial construction.
Deck / Covered Patio / Carport Permit
Required for attached and detached decks, pergolas, patio covers, and carports in Severance. Governed by the 2024 IRC as adopted; the Town publishes dedicated Uncovered Decks & Porches and Patio Covers/Carport guides.
EV Charger / Electric Vehicle Charging Station Permit
Severance does not publish a distinct EV-charger fee line or standalone EVSE permit type. Installing an EV charging station circuit is processed as electrical work under the Town's Electrical Permit mechanism already documented in this file: governed by the 2023 NEC as adopted, with electricians verified contemporaneously against their current Colorado State Electrical license (and Master Electrician license) per the Town's Procedure for Contemporaneous Reviews rather than a separate local trade exam. Severance is also one of the Colorado jurisdictions with an explicit, currently-enforced 'EV Ready' new-construction requirement (a minimum 40-amp dedicated circuit within 3 feet of a parking space), documented in the Town's own 2026 SAFEbuilt Residential Application Checklist and New Commercial Plan Submittal Procedure -- meaning many new homes and commercial buildings already have the EV circuit roughed in at construction, with a retrofit EV charger permit needed only when adding the circuit/charger to existing construction.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 6units
6 buildings · $1.4M valuation
- Trailing 12 months
- 69units
12 of 12 months reported · #35 in Colorado coverage by units
- Year to date (2026 YTD through 2026-05)
- 27units
27 buildings · $8.5M valuation
5 month(s) reported to Census
- Full year 2025
- 82units
82 buildings · $30.2M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Severance contracts ALL plan review and inspections to SAFEbuilt Colorado — the Town itself handles permit intake/issuance and Certificate of Occupancy sign-off, but questions about plan review status or inspection scheduling should go to SAFEbuilt (windsor@safebuilt.com, 866-671-1036 / 970-674-1037), not the Town's general Building Department line.
- The only genuinely published turnaround figure in Severance's entire permitting process is 'up to 15 business days' for permit return, stated on the Building Permit & Certificate of Occupancy Checklist for Builders & Developers — no other permit type in this file has a published SLA, and none should be assumed from peer Front Range jurisdictions.
- Electrical and Plumbing trades are NOT locally licensed in Severance — the Town defers entirely to Colorado DORA's State Electrical Board and State Plumbing Board via a 'Contemporaneous Review' procedure; the Town's own Contractor License Application confirms these trades are 'Verified through the State, no fee' rather than requiring a separate town exam or fee (unlike Class A/B/B2/D contractors, who pay $50 license + $25 admin = $75 for a 3-year Town license).
- State-mandated Electric Ready, Solar Ready, and EV Ready provisions (consistent with Colorado HB22-1362) are actively enforced on new residential and commercial construction plans as of the 2026 SAFEbuilt Residential Application Checklist and the New Commercial Plan Submittal Procedure — these are not optional or future items.
- There is a code-currency discrepancy between the Town's jurisdiction-specific 2024 Client Design Criteria document (2024 IRC/IBC/IPC/IMC/IFGC/IECC, 2023 NEC, 2024 Pool and Spa Code) and a separate, seemingly generic SAFEbuilt Photovoltaic System Submittal Requirements guide that references '2023 NEC, 2018 International Codes.' This file treats the Town-specific Design Criteria document as authoritative; solar applicants should confirm current code-edition expectations directly with SAFEbuilt or the Building Department at intake.
- No standalone Accessory Dwelling Unit (ADU) permit type, fee, or dedicated guide exists on the Town's Building Permits pages — ADUs are a Chapter 16 (Land Use Code) zoning matter first, then processed for construction through the standard residential addition/accessory-structure permit pathway. Do not expect a distinct 'ADU permit' application or fee schedule.
- The base valuation-based Building Permit / inspection fee itself is determined by SAFEbuilt Colorado and is NOT reproduced as a standalone published table on the Town's own site — the Town's 2026 Fee Schedule only specifies the Use Tax (3% of 60% of valuation), Administration Fee (30% of inspection fees or $30 minimum), and Planning Review Fee (15% of inspection fees or $30 minimum) layered on top of that SAFEbuilt-determined base fee. Contact SAFEbuilt or the Building Department directly for the base fee amount on a specific project.
- Since January 1, 2015, all single-family homes must submit footing, foundation reinforcement, perimeter drain (Colorado-licensed engineer inspection specifically), and U-fer ground engineer letters, plus a signed Town Setback Certification form, to SAFEbuilt BEFORE requesting the underground plumbing inspection and before beginning any framing — missing this can stall your inspection schedule regardless of how quickly your permit itself was issued.
- UPDATED 2026-07-23: Municode's Severance library (library.municode.com/co/severance) WAS successfully retrieved this session via the Claude Browser pane (a plain WebFetch/curl only returns the client-side Angular shell, but direct browser navigation to a specific ?nodeId= renders the actual section text). The codified Municipal Code is codified through Ordinance No. 2025-27 (enacted Dec. 9, 2025) and confirms most Chapter 18 codes at the 2024 edition, EXCEPT the IMC, IPC, and Swimming Pool and Spa Code, which are codified at the 2018 edition despite the SAFEbuilt Design Criteria PDF's blanket '2024' labeling — see the corrected codesAdopted entries and the dated addendum note above. Chapter 18 Article 11 (the codified building-permit ordinance itself) confirms no permit-type-specific review-timeline SLA and no demolition-specific fee are codified in Town law, independently corroborating this file's PDF-based research.
- A third-party AI-generated meeting-summary article (Citizen Portal, not a .gov source) describing a Severance Town Council work session on the 2024 ICC code cycle was found during research but explicitly NOT used as a source for any fact in this file, per this project's official-sources-only policy — it is noted here only as background on why an ordinance number for the 2024-code adoption could not be independently pinned down in this session.