Skip to main content
PermitBase

Severance building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Severance, Colorado.

Last verified 2026-07-23 · Source · Embed this page’s badge · Version history

Building department

Address
3 S. Timber Ridge Parkway, P.O. Box 339, Severance, CO 80546
Phone
970-692-7315
Office hours
Monday-Friday, 8:00 am - 5:00 pm. General Permit Clerk / Town Hall line also published as 970-686-1218 (fax 970-686-6250) on Building Department PDF forms; primary Building Department contact line is 970-692-7315. Plan review and inspections are contracted out to SAFEbuilt Colorado, which uses its own contact channel (see inspections note).

Inspection guide

See how inspections work in Severance — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2024 International Residential Code (IRC) — Town of Severance 'Design Criteria Town of Severance' document (SAFEbuilt/Town primary source, DocumentCenter/View/1106), Residential Construction section
  • 2024 International Energy Conservation Code (IECC) — same source, Residential Construction section
  • 2023 National Electrical Code (NEC) — same source, listed under both Residential and Commercial Construction sections
  • 2024 International Building Code (IBC) — same source, Commercial Construction section
  • 2024 International Plumbing Code (IPC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (library.municode.com/co/severance, Chapter 18, Article 4, Sec. Show full text

    2024 International Plumbing Code (IPC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (library.municode.com/co/severance, Chapter 18, Article 4, Sec. 18-4-10, successfully retrieved live via browser rendering on 2026-07-23) states: 'The International Plumbing Code, 2018 Edition... is hereby adopted by reference as the Town of Severance Plumbing Code' (Ord. 2019-07 § 4; Ord. No. 2025-27, § 6, enacted Dec. 9, 2025) — i.e. the codified ordinance readopted/carried forward the 2018 IPC edition even in the same Dec. 9, 2025 recodification that moved most other codes to 2024. The codified Municipal Code (the Town's actual adopted law) is treated as authoritative over the SAFEbuilt client-facing summary sheet for this fact; IPC is 2018, not 2024, in Severance.

  • 2024 International Mechanical Code (IMC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. Show full text

    2024 International Mechanical Code (IMC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. 18-3-10, retrieved live 2026-07-23) states: 'The International Mechanical Code, 2018 Edition... is hereby adopted by reference as the Town of Severance Mechanical Code' (Ord. No. 2025-27, § 4, enacted Dec. 9, 2025) — the same Dec. 9, 2025 recodification ordinance that adopted 2024 IBC/IRC/IECC/IFGC/IPMC/IEBC left IMC at the 2018 edition. The codified Municipal Code is treated as authoritative over the SAFEbuilt summary sheet; IMC is 2018, not 2024, in Severance.

  • 2024 International Fuel Gas Code (IFGC) — same source, Commercial Construction section
  • 2024 International Energy Code — same source, Commercial Construction section (listed as a separate line from the 2024 IECC entry under Residential; the Town's document does not clarify whether these are intended as the same document cited twice or two distinct adoptions, so both are recorded as they appear on the primary source)
  • 2024 Pool and Spa Code — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 12, Sec. Show full text

    2024 Pool and Spa Code — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 12, Sec. 18-12-10, retrieved live 2026-07-23) states: 'The International Swimming Pool and Spa Code, 2018 Edition... is hereby adopted by reference as the Town of Severance Swimming Pool and Spa Code' (Ord. No. 2025-27, § 9, enacted Dec. 9, 2025). The codified Municipal Code is treated as authoritative; ISPSC is 2018, not 2024, in Severance. (No standalone swimming-pool permit-type entry exists in the permitTypes array, so this correction is recorded here only; the 2024 Swimming Pools Guide, DocumentCenter/View/203, is a generic SAFEbuilt trade guide and does not itself state a code edition or fee/timeline figure.)

  • 2024 International Property Maintenance Code — same source, 'Other Adopted Codes' section
  • 2024 International Existing Building Code — same source, 'Other Adopted Codes' section
  • State Codes (as listed on the Town's own Design Criteria document): Electric Ready, Solar Ready, EV Ready — consistent with Colorado HB22-1362's statewide energy/electrification floor (2021 IECC-derived electric-ready,… Show full text

    State Codes (as listed on the Town's own Design Criteria document): Electric Ready, Solar Ready, EV Ready — consistent with Colorado HB22-1362's statewide energy/electrification floor (2021 IECC-derived electric-ready, solar-ready, EV-ready provisions, effective window July 2023-July 2026); confirmed independently by the '2026 SAFEbuilt Residential Application Checklist' (DocumentCenter/View/1149), which requires EV-ready (min. 40A circuit within 3ft of a car space), Solar-ready (roof-plan solar zones, prewire routing, truss dead-load verification), and Electric-ready (pre-wire location/note and full electric-appliance load calculation for new single-family, two-family, and townhome dwellings) documentation for permit submittal, and by the New Commercial Plan Submittal Procedure (DocumentCenter/View/182), which states 'EV ready, Solar ready and Electric ready are now required to be shown on plans.'

  • Note on a separate SAFEbuilt-published document: the '2023 NEC Photovoltaic System Submittal Requirements' guide (DocumentCenter/View/210, last revised 08.11.2023) states 'Applicable current codes are the 2023 NEC, 2018… Show full text

    Note on a separate SAFEbuilt-published document: the '2023 NEC Photovoltaic System Submittal Requirements' guide (DocumentCenter/View/210, last revised 08.11.2023) states 'Applicable current codes are the 2023 NEC, 2018 International Codes' — this conflicts with the Town-specific 2024 Client Design Criteria document and appears to be a generic/stale SAFEbuilt template not yet updated to Severance's current 2024 code cycle; the Town's own jurisdiction-specific Design Criteria document (2024, explicitly labeled 'Severance') is treated as authoritative for this record rather than the generic PV guide.

  • A note on sourcing: a Citizen Portal article — a third-party, AI-generated meeting summary, not an official Town/.gov document — describes a Severance Town Council work session at which building official Russ Weber… Show full text

    A note on sourcing: a Citizen Portal article — a third-party, AI-generated meeting summary, not an official Town/.gov document — describes a Severance Town Council work session at which building official Russ Weber (SAFEbuilt) briefed Council on the 2024 ICC model codes and state-mandated changes, and reports that no formal adoption ordinance/vote occurred at that specific work session; Council directed staff to return with a formal adoption package excluding wildfire-resiliency provisions pending clarification. Because it is not an official source, that article is not cited for any fact here; it is noted only as context for why a formal Chapter 18 adoption-ordinance number from Municode's Severance library (library.municode.com/co/severance) is not independently confirmed. The Town's own primary-source Design Criteria and permit-guide PDFs (all dated 2026 or explicitly labeled '2024 IRC'/'2024 International Codes') serve as the governing record of the currently-adopted codes.

  • The codified Municipal Code on Municode states: 'SEVERANCE MUNICIPAL CODE Codified through Ordinance No. Show full text

    The codified Municipal Code on Municode states: 'SEVERANCE MUNICIPAL CODE Codified through Ordinance No. 2025-27, enacted December 9, 2025' (Supp. No. 15, online content updated June 29, 2026); that ordinance repealed and re-enacted Chapter 18 Articles 1-10 and 12 in full. Ord. No. 2025-27 is the December-2025 code-adoption ordinance, and cross-checking every article against the SAFEbuilt Design Criteria PDF surfaces three code-edition corrections: IMC and IPC are codified at the 2018 edition (not 2024) per Ord. No. 2025-27 §§ 4 and 6, and the Swimming Pool and Spa Code is codified at the 2018 edition (not 2024) per Ord. No. 2025-27 § 9 — see the corrected codesAdopted entries above. IBC, IRC, IECC, IFGC, IPMC, and IEBC are independently confirmed at the 2024 edition per the same ordinance (Sec. 18-1-10, 18-2-10, 18-8-10, 18-6-10, 18-9-10, 18-10-10), and the NEC is confirmed at 2023 (Sec. 18-4-40, Ord. No. 2023-09). Chapter 18, Article 11 (Building Permits, Sec. 18-11-10 'Issuance' and Sec. 18-11-20 'Surcharge') contains only permit-issuance criteria and the administration surcharge (30% of inspection fees or $30.00, matching the Administration Fee line above) — no permit-type-specific review-timeline SLA and no demolition-specific fee or process are codified anywhere in Chapter 18, confirming from the Town's own adopted law (the strongest available primary source) that the review-timeline and demolition-fee gaps noted across these permit types are genuine publication gaps. Separately, Ordinance No. 2025-08 adopted the 2024 International Fire Code.

Permit types & fees

Severance's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Severance yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Severance lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
4units

4 buildings · $2M valuation

Trailing 12 months
70units

12 of 12 months reported · #40 in Colorado coverage by units

Year to date (2026 YTD through 2026-07)
35units

35 buildings · $11.7M valuation

7 month(s) reported to Census

Full year 2025
82units

82 buildings · $30.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Severance contracts ALL plan review and inspections to SAFEbuilt Colorado — the Town itself handles permit intake/issuance and Certificate of Occupancy sign-off, but questions about plan review status or inspection scheduling should go to SAFEbuilt (windsor@safebuilt.com, 866-671-1036 / 970-674-1037), not the Town's general Building Department line.
  • The only genuinely published turnaround figure in Severance's entire permitting process is 'up to 15 business days' for permit return, stated on the Building Permit & Certificate of Occupancy Checklist for Builders & Developers — no other permit type in this record has a published SLA, and none should be assumed from peer Front Range jurisdictions.
  • Electrical and Plumbing trades are NOT locally licensed in Severance — the Town defers entirely to Colorado DORA's State Electrical Board and State Plumbing Board via a 'Contemporaneous Review' procedure; the Town's own Contractor License Application confirms these trades are 'Verified through the State, no fee' rather than requiring a separate town exam or fee (unlike Class A/B/B2/D contractors, who pay $50 license + $25 admin = $75 for a 3-year Town license).
  • State-mandated Electric Ready, Solar Ready, and EV Ready provisions (consistent with Colorado HB22-1362) are actively enforced on new residential and commercial construction plans as of the 2026 SAFEbuilt Residential Application Checklist and the New Commercial Plan Submittal Procedure — these are not optional or future items.
  • There is a code-currency discrepancy between the Town's jurisdiction-specific 2024 Client Design Criteria document (2024 IRC/IBC/IPC/IMC/IFGC/IECC, 2023 NEC, 2024 Pool and Spa Code) and a separate, seemingly generic SAFEbuilt Photovoltaic System Submittal Requirements guide that references '2023 NEC, 2018 International Codes.' This record treats the Town-specific Design Criteria document as authoritative; solar applicants should confirm current code-edition expectations directly with SAFEbuilt or the Building Department at intake.
  • No standalone Accessory Dwelling Unit (ADU) permit type, fee, or dedicated guide exists on the Town's Building Permits pages — ADUs are a Chapter 16 (Land Use Code) zoning matter first, then processed for construction through the standard residential addition/accessory-structure permit pathway. Do not expect a distinct 'ADU permit' application or fee schedule.
  • The base valuation-based Building Permit / inspection fee itself is determined by SAFEbuilt Colorado and is NOT reproduced as a standalone published table on the Town's own site — the Town's 2026 Fee Schedule only specifies the Use Tax (3% of 60% of valuation), Administration Fee (30% of inspection fees or $30 minimum), and Planning Review Fee (15% of inspection fees or $30 minimum) layered on top of that SAFEbuilt-determined base fee. Contact SAFEbuilt or the Building Department directly for the base fee amount on a specific project.
  • Since January 1, 2015, all single-family homes must submit footing, foundation reinforcement, perimeter drain (Colorado-licensed engineer inspection specifically), and U-fer ground engineer letters, plus a signed Town Setback Certification form, to SAFEbuilt BEFORE requesting the underground plumbing inspection and before beginning any framing — missing this can stall your inspection schedule regardless of how quickly your permit itself was issued.
  • Per Municode's Severance library (library.municode.com/co/severance), the codified Municipal Code is current through Ordinance No. 2025-27 (enacted Dec. 9, 2025) and confirms most Chapter 18 codes at the 2024 edition, EXCEPT the IMC, IPC, and Swimming Pool and Spa Code, which are codified at the 2018 edition despite the SAFEbuilt Design Criteria PDF's blanket '2024' labeling — see the corrected codesAdopted entries. Chapter 18 Article 11 (the codified building-permit ordinance itself) confirms no permit-type-specific review-timeline SLA and no demolition-specific fee are codified in Town law, independently corroborating the PDF-based sourcing elsewhere in this record.
  • A third-party AI-generated meeting-summary article (Citizen Portal, not a.gov source) describes a Severance Town Council work session on the 2024 ICC code cycle; it is not used as a source for any fact here, since only official sources are relied on. It is noted only as background on why an ordinance number for the 2024-code adoption remains unconfirmed.

Comparable nearby cities

Ault
Both in Weld County14 shared permit types~9 mi away
Compare fees →
Pierce
Both in Weld County14 shared permit types~11 mi away
Compare fees →
La Salle
Both in Weld County14 shared permit types~14 mi away
Compare fees →