Skip to main content
PermitBase

Sign Permit in Severance, Colorado

Town of Severance Land Use Code 2025, Division 4 (Signage), Section 16.5.415 requires a sign permit to erect, move, alter, reconstruct, or repair any permanent or temporary sign, except signs specifically exempted under Section 16.5.420. Town staff (not SAFEbuilt) review sign permits directly against seven listed criteria and may approve, approve with conditions, or deny; denials/conditions are appealable to the Board of Adjustment. Permitted number, maximum area, height, and illumination all vary by sign type and zone district (Residential, Business/Commercial, Town Core, Industrial Sub-District) per Tables 16.5.435.a and 16.5.435.b.

Verified 2026-08-14 · Source

When you need this permit

  • A sign permit is required to erect, move, alter, reconstruct, or repair any permanent or temporary sign, except signs exempt under Section 16.5.420; changing/replacing the copy on an existing lawful sign does not require a new permit provided the copy change doesn't alter the sign's nature or create a violation
  • A separate permit is required for each business entity's sign in a multiple-tenant building; separate building and/or electrical permits may also be required for a sign, determined case-by-case
  • Applications made in writing; Town staff determines completeness, then reviews against: (1) compliance with this section; (2) conformance with adopted building/electrical Codes; (3) no interference with pedestrian/vehicular safety; (4) no detraction from an architecturally significant/historic structure; (5) no negative impact on adjacent property; (6) no detraction from pedestrian quality of the street/area; (7) no contribution to an over-proliferation of signs on the property/area
  • Denial or approval-with-conditions may be appealed to the Board of Adjustment (BOA); a waiver for a larger-than-allowed sign area or a sign type not expressly permitted requires Town Council approval as a use by special review
  • Exempt signs (no permit required) include: nonvisible signs; nonilluminated address signs up to 2 sq ft; non-illuminated building-identification/historical-marker signs; bulletin board signs up to 15 sq ft accessory to a church/school/nonprofit; temporary construction signs (max 8 sq ft residential / 16 sq ft other uses, one per street front, unlit, removed within 7 days of project completion or 1 year); courtesy signs up to 4 sq ft/face or 8 sq ft aggregate; holiday decorations displayed up to 60 days/year; on-premises directional signs up to 6 sq ft; door-glass signs; seasonal farm product signs; flags/crests/banners (non-commercial); garage/yard sale signs (up to twice per year per dwelling, max 3 days); memorial signs; notice boards for public/religious institutions; oil and gas operation identification signs
  • Whenever a business/use is discontinued, its sign must be removed or obscured within 90 days of discontinuance
  • Illegal signs in the public right-of-way may be removed by the Town and stored 30 days (recoverable only upon payment of removal/storage costs); unrecovered signs are declared abandoned with title vesting in the Town, and unpaid costs may become a tax lien
  • Erecting a temporary sign requiring a permit without first obtaining one makes the person/entity ineligible for a temporary sign permit for the remainder of the calendar year

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Temporary Sign PermitTown of Severance 2026 Fee Schedule (revised 12/9/2025), § 16.15.020, verified visually against the fee-schedule table's rendered page to confirm correct row/value alignment
$100.00
Standard (Permanent) Sign PermitLand Use Code Sec. 16.5.415(a) states 'Fees shall be in accordance with the Town's fee schedule available upon request from Town staff' — no standalone dollar figure for a non-temporary sign permit is published in the Town's 2026 Fee Schedule (only the $100.00 Temporary Sign Permit line item, § 16.15.020, is itemized there). Contact the Building Department (970-692-7315 / building@townofseverance.org) for the current amount.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Severance?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sign Compliance Inspection

    The Town may inspect any sign governed by Division 4 and has authority to order painting, repair, alteration, or removal of a sign that constitutes a hazard by reason of inadequate maintenance, dilapidation, or obsolescence

See the full Severance inspection guide — scheduling & re-inspection fees →

Tips

  • The only sign-related dollar figure actually published anywhere in Severance's fee schedule is the $100.00 Temporary Sign Permit fee (§16.15.020) — a standard/permanent sign permit fee is available only on request from Town staff, so budget time to get a written quote before applying.
  • In a multi-tenant building, each business entity needs its own separate sign permit — a single building-wide permit does not cover every tenant's sign.
  • If your sign permit is denied or approved with conditions you don't want, your appeal path is the Board of Adjustment (BOA), not Town Council directly.
  • Don't erect a temporary sign before getting the permit — doing so makes you ineligible for a temporary sign permit for the rest of that calendar year, per Sec. 16.5.415(g)(2)(d).

Frequently asked questions

Severance requires a sign permit for: A sign permit is required to erect, move, alter, reconstruct, or repair any permanent or temporary sign, except signs exempt under Section 16.5.420; changing/replacing the copy on an existing lawful sign does not require a new permit provided the copy change doesn't alter the sign's nature or create a violation; A separate permit is required for each business entity's sign in a multiple-tenant building; separate building and/or electrical permits may also be required for a sign, determined case-by-case; Applications made in writing; Town staff determines completeness, then reviews against: (1) compliance with this section; (2) conformance with adopted building/electrical Codes; (3) no interference with pedestrian/vehicular safety; (4) no detraction from an architecturally significant/historic structure; (5) no negative impact on adjacent property; (6) no detraction from pedestrian quality of the street/area; (7) no contribution to an over-proliferation of signs on the property/area; Denial or approval-with-conditions may be appealed to the Board of Adjustment (BOA); a waiver for a larger-than-allowed sign area or a sign type not expressly permitted requires Town Council approval as a use by special review; Exempt signs (no permit required) include: nonvisible signs; nonilluminated address signs up to 2 sq ft; non-illuminated building-identification/historical-marker signs; bulletin board signs up to 15 sq ft accessory to a church/school/nonprofit; temporary construction signs (max 8 sq ft residential / 16 sq ft other uses, one per street front, unlit, removed within 7 days of project completion or 1 year); courtesy signs up to 4 sq ft/face or 8 sq ft aggregate; holiday decorations displayed up to 60 days/year; on-premises directional signs up to 6 sq ft; door-glass signs; seasonal farm product signs; flags/crests/banners (non-commercial); garage/yard sale signs (up to twice per year per dwelling, max 3 days); memorial signs; notice boards for public/religious institutions; oil and gas operation identification signs; Whenever a business/use is discontinued, its sign must be removed or obscured within 90 days of discontinuance; Illegal signs in the public right-of-way may be removed by the Town and stored 30 days (recoverable only upon payment of removal/storage costs); unrecovered signs are declared abandoned with title vesting in the Town, and unpaid costs may become a tax lien; Erecting a temporary sign requiring a permit without first obtaining one makes the person/entity ineligible for a temporary sign permit for the remainder of the calendar year. If your project isn't listed, confirm with Town of Severance Building & Permits Department (Planning Services, Attn: Building Department) at 970-692-7315 before starting work.

A Temporary Sign Permit costs $100.00 (§16.15.020, 2026 Fee Schedule). A standard/permanent sign permit's fee is not itself published as a dollar figure — the Land Use Code states it is set by the Town's fee schedule 'available upon request from Town staff.'

Severance does not publish a plan-review timeline for this permit. Contact Town of Severance Building & Permits Department (Planning Services, Attn: Building Department) at 970-692-7315 for current turnaround.

You'll need: Sign Permit Application. Depending on your project, Severance may also ask for: Temporary Sign Permit Application. See the required-documents checklist on this page for details on each.

Severance requires 1 inspection(s) for a sign permit, in order: Sign Compliance Inspection. Schedule each through Town of Severance Building & Permits Department (Planning Services, Attn: Building Department) (970-692-7315).

Apply through Town of Severance Building & Permits Department (Planning Services, Attn: Building Department) at 3 S. Timber Ridge Parkway, P.O. Box 339, Severance, CO 80546. Phone: 970-692-7315, email: building@townofseverance.org. Office hours: Monday-Friday, 8:00 am - 5:00 pm. General Permit Clerk / Town Hall line also published as 970-686-1218 (fax 970-686-6250) on Building Department PDF forms; primary Building Department contact line is 970-692-7315. Plan review and inspections are contracted out to SAFEbuilt Colorado, which uses its own contact channel (see inspections note).. Official information: https://www.townofseverance.org/173/Building-Permits.

Severance, Colorado has adopted: 2024 International Residential Code (IRC) — Town of Severance 'Design Criteria Town of Severance' document (SAFEbuilt/Town primary source, DocumentCenter/View/1106), Residential Construction section; 2024 International Energy Conservation Code (IECC) — same source, Residential Construction section; 2023 National Electrical Code (NEC) — same source, listed under both Residential and Commercial Construction sections; 2024 International Building Code (IBC) — same source, Commercial Construction section; 2024 International Plumbing Code (IPC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (library.municode.com/co/severance, Chapter 18, Article 4, Sec. 18-4-10, successfully retrieved live via browser rendering on 2026-07-23) states: 'The International Plumbing Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Plumbing Code' (Ord. 2019-07 § 4; Ord. No. 2025-27, § 6, enacted Dec. 9, 2025) — i.e. the codified ordinance readopted/carried forward the 2018 IPC edition even in the same Dec. 9, 2025 recodification that moved most other codes to 2024. The codified Municipal Code (the Town's actual adopted law) is treated as authoritative over the SAFEbuilt client-facing summary sheet for this fact; IPC is 2018, not 2024, in Severance.; 2024 International Mechanical Code (IMC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. 18-3-10, retrieved live 2026-07-23) states: 'The International Mechanical Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Mechanical Code' (Ord. No. 2025-27, § 4, enacted Dec. 9, 2025) — the same Dec. 9, 2025 recodification ordinance that adopted 2024 IBC/IRC/IECC/IFGC/IPMC/IEBC left IMC at the 2018 edition. The codified Municipal Code is treated as authoritative over the SAFEbuilt summary sheet; IMC is 2018, not 2024, in Severance.; 2024 International Fuel Gas Code (IFGC) — same source, Commercial Construction section; 2024 International Energy Code — same source, Commercial Construction section (listed as a separate line from the 2024 IECC entry under Residential; the Town's document does not clarify whether these are intended as the same document cited twice or two distinct adoptions, so both are recorded as they appear on the primary source); 2024 Pool and Spa Code — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 12, Sec. 18-12-10, retrieved live 2026-07-23) states: 'The International Swimming Pool and Spa Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Swimming Pool and Spa Code' (Ord. No. 2025-27, § 9, enacted Dec. 9, 2025). The codified Municipal Code is treated as authoritative; ISPSC is 2018, not 2024, in Severance. (No standalone swimming-pool permit-type entry exists in this file's permitTypes array, so this correction is recorded here only; the 2024 Swimming Pools Guide, DocumentCenter/View/203, is a generic SAFEbuilt trade guide and does not itself state a code edition or fee/timeline figure.); 2024 International Property Maintenance Code — same source, 'Other Adopted Codes' section; 2024 International Existing Building Code — same source, 'Other Adopted Codes' section; State Codes (as listed on the Town's own Design Criteria document): Electric Ready, Solar Ready, EV Ready — consistent with Colorado HB22-1362's statewide energy/electrification floor (2021 IECC-derived electric-ready, solar-ready, EV-ready provisions, effective window July 2023-July 2026); confirmed independently by the '2026 SAFEbuilt Residential Application Checklist' (DocumentCenter/View/1149), which requires EV-ready (min. 40A circuit within 3ft of a car space), Solar-ready (roof-plan solar zones, prewire routing, truss dead-load verification), and Electric-ready (pre-wire location/note and full electric-appliance load calculation for new single-family, two-family, and townhome dwellings) documentation for permit submittal, and by the New Commercial Plan Submittal Procedure (DocumentCenter/View/182), which states 'EV ready, Solar ready and Electric ready are now required to be shown on plans.'; Note on a separate SAFEbuilt-published document: the '2023 NEC Photovoltaic System Submittal Requirements' guide (DocumentCenter/View/210, last revised 08.11.2023) states 'Applicable current codes are the 2023 NEC, 2018 International Codes' — this conflicts with the Town-specific 2024 Client Design Criteria document and appears to be a generic/stale SAFEbuilt template not yet updated to Severance's current 2024 code cycle; the Town's own jurisdiction-specific Design Criteria document (2024, explicitly labeled 'Severance') is treated as authoritative for this file rather than the generic PV guide.; Note on a secondary (non-.gov, AI-generated meeting-summary) source found during research: a Citizen Portal article describing a Severance Town Council work session states building official Russ Weber (SAFEbuilt) briefed Council on the 2024 ICC model codes and state-mandated changes, and that no formal adoption ordinance/vote occurred at that specific work session — Council directed staff to return with a formal adoption package excluding wildfire-resiliency provisions pending clarification. This source was NOT used as a citation for any fact in this file (it is a third-party AI-summarized meeting recap, not an official Town/.gov document, and is explicitly excluded per this project's official-sources-only policy). It is noted here only as context for why a formal Chapter 18 Municode ordinance number could not be independently confirmed in the original research session — Municode's Severance library (library.municode.com/co/severance) returned only its client-side Angular application shell (no server-rendered ordinance text) to both a standard WebFetch and a full-browser-header curl request in that session. The Town's own primary-source Design Criteria and permit-guide PDFs (all dated 2026 or explicitly labeled '2024 IRC'/'2024 International Codes') were used instead as the governing record of currently-adopted codes at that time.; UPDATE 2026-07-23: Municode's Severance library WAS successfully retrieved this session using the Claude Browser pane (direct navigation with specific nodeId query parameters, e.g. ?nodeId=CH18BURE_ART1BUCO, renders the JS-driven Angular SPA's actual section text — a plain WebFetch/curl request only ever returns the pre-render shell). The codified Municipal Code confirms: 'SEVERANCE MUNICIPAL CODE Codified through Ordinance No. 2025-27, enacted December 9, 2025' (Supp. No. 15, online content updated June 29, 2026), which repealed and re-enacted Chapter 18 Articles 1-10 and 12 in full. This resolved the previously-unconfirmed ordinance number (Ord. No. 2025-27 is exactly the Dec-2025-era code-adoption ordinance this file's original research could not pin down) and, on cross-check against every article, surfaced three code-edition corrections against the SAFEbuilt Design Criteria PDF: IMC and IPC are codified at the 2018 edition (not 2024) per Ord. No. 2025-27 §§ 4 and 6, and the Swimming Pool and Spa Code is codified at the 2018 edition (not 2024) per Ord. No. 2025-27 § 9 — see the corrected codesAdopted entries above. IBC, IRC, IECC, IFGC, IPMC, and IEBC are independently confirmed at the 2024 edition per the same ordinance (Sec. 18-1-10, 18-2-10, 18-8-10, 18-6-10, 18-9-10, 18-10-10), and NEC is confirmed at 2023 (Sec. 18-4-40, Ord. No. 2023-09). Chapter 18, Article 11 (Building Permits, Sec. 18-11-10 'Issuance' and Sec. 18-11-20 'Surcharge') was also checked in full: it contains only permit-issuance criteria and the administration surcharge (30% of inspection fees or $30.00, matching this file's existing Administration Fee line) — no permit-type-specific review-timeline SLA and no demolition-specific fee or process are codified anywhere in Chapter 18, confirming (from the Town's own adopted law, the strongest available primary source) that the review-timeline and demolition-fee gaps noted throughout this file's permitTypes are genuine publication gaps rather than a research miss. Separately, Ordinance No. 2025-08 adopted the 2024 International Fire Code (not previously tracked in this file's codesAdopted list; out of scope to add here since no fire-permit type exists in this file's permitTypes array).. Local amendments apply — see the Severance overview page for the full list.

Yes, for most permanent and temporary signs. Land Use Code Sec. 16.5.415 requires a permit to erect, move, alter, reconstruct, or repair a sign, with a list of exempt sign types in Sec. 16.5.420 (small address/directional/courtesy signs, temporary construction signs, holiday decorations, flags, and others).

Sources & verification

Verified against official sources. Last reviewed 2026-08-14.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Severance building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.