Residential Building Permit (New Construction) in Severance, Colorado

Required for new single-family, two-family, and townhome construction in the Town of Severance. Reviewed under the 2024 IRC and 2024 IECC (as adopted per the Town's Design Criteria document) plus the state-mandated Electric Ready/Solar Ready/EV Ready provisions. All plan review and inspections are performed by SAFEbuilt Colorado under contract to the Town; permits are applied for online via the Community Core portal.

Verified 2026-07-23 · Source

When you need this permit

  • Plans must comply with the 2024 IRC and 2024 IECC as adopted, and meet the Town's Design Criteria: 115 mph ultimate wind speed (ice and water shield + under-floor protection required), Seismic Design Category B, 30-inch frost line, 30 PSF roof live load / 15 PSF roof dead load / 30 PSF ground snow load
  • EV-ready, Solar-ready, and Electric-ready documentation required per the 2026 SAFEbuilt Residential Application Checklist: minimum 40-amp EV circuit within 3 ft of a parking space; roof plan solar-ready zone(s) with prewire routing and truss dead-load verification; electric-ready prewire note and full-load calculation for new single-family/two-family/townhome dwellings
  • Manual J, D, and S compliance calculations required
  • 2024 IECC energy code compliance required via ResCheck or an energy rating company report, or full prescriptive-method documentation
  • Engineered structural plans and foundation plans stamped by a Colorado-licensed engineer
  • Metro District/HOA approval letter required if applicable (check with subdivision ARC committee before submitting)
  • Contractor must hold a current Town of Severance Contractor License (Class A or B) plus, for electrical/plumbing trades, a current Colorado State license (contemporaneously verified, no separate town fee for those trades) Contractor
  • Since 2015: footing, foundation reinforcement, perimeter drain (Colorado-licensed engineer inspection), and U-fer ground engineer letters plus a signed Town Setback Certification form must be submitted to SAFEbuilt before the underground plumbing inspection and before framing begins
  • Applications submitted online via the Community Core portal only

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit / Inspection FeeVERIFIED-NEGATIVE, RE-CONFIRMED 2026-07-23 on the live current Fee Schedule: the Town's 2026 Fee Schedule PDF (revised 12/9/2025, re-fetched and full-text-extracted this session) contains a section literally titled 'BUILDING PERMIT FEES' whose complete, exhaustive content is exactly three line items — Use Tax (3% of 60% of valuation, 'as Determined by SafeBuilt'), Administration Fee, and Planning Review Fee — with no base valuation-based dollar table anywhere in that section or the rest of the 10-page document. This confirms, directly from the Town's own official fee ordinance/schedule (not merely 'not located in research'), that SAFEbuilt's underlying valuation fee table is genuinely not published by the Town for any permit type. Also checked the blank office-use Building Permit Application form (DocumentCenter/View/166 and /178) and an alternate-ID copy of the fee schedule (DocumentCenter/View/301, byte-identical to /334) — neither adds a dollar figure. Confirm a project-specific quote directly with SAFEbuilt or the Building Department.
Valuation-based, determined by SAFEbuilt Colorado
Use Tax2026 Fee Schedule, Town of Severance, revised 12/9/2025 (Sec. 4, 'BUILDING PERMIT FEES')
3% assessed on 60% of the Total Valuation of Improvement as determined by SAFEbuilt
Administration Fee
Greater of 30% of total inspection fees or $30.00
Planning Review Fee
Greater of 15% of total inspection fees or $30.00
Transportation Impact Fee (Single Family, per unit)
$6,075.00
Park Impact Fee (Single Family, per unit)
$1,645.00
General Government Impact Fee (Single Family, per unit)
$2,611.00
Police Impact Fee (Single Family, per unit)
$749.00
Water Utility Impact Fee (3/4-inch meter)
$16,975.00
Card Processing FeePaid via Community Core
3% surcharge on credit/debit card payments; no fee for e-check

Review timeline

Plan reviewSeverance’s published plan-review target
Up to 15 business days

How long did your Residential Building Permit (New Construction) permit actually take in Severance?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing

    After trenches excavated and forms erected, prior to concrete placement

  2. 2

    Foundation / Underground Plumbing

    Foundation reinforcement and U-fer ground per engineer letters; underground plumbing inspection requires prior submittal of footing, foundation, perimeter drain, and U-fer engineer letters plus signed Setback Certification

  3. 3

    Frame/Rough (including utility rough-ins)

    After roof, framing, bracing, and fasteners are in place

  4. 4

    Water and Sewer Line Open Trench

    Finalized by the Town and SAFEbuilt before backfilling

  5. 5

    Final Meter Pit and Hard Surface Inspection

    Must be completed within 2 weeks of Certificate of Occupancy

  6. 6

    Final Inspection

    All trades must sign off before Certificate of Occupancy is printed

See the full Severance inspection guide — scheduling & re-inspection fees →

Tips

  • Budget for the Metro District/HOA ARC approval letter before submitting your building permit application if your subdivision has one — several Town documents flag this as required 'to move forward.'
  • The Town's own checklist states permit return can take up to 15 business days — this is the only published timeline figure in Severance's permitting process; plan review at SAFEbuilt does not carry its own separately published SLA.
  • Electric-ready, solar-ready, and EV-ready documentation is required on plans for new single-family, two-family, and townhome dwellings — this is a genuine current requirement (2026 SAFEbuilt checklist), not a future or optional item.
  • Since 2015, engineer letters (footing, foundation reinforcement, perimeter drain, U-fer ground) and the signed Setback Certification must reach SAFEbuilt before the underground plumbing inspection and before framing begins — missing this can stall your inspection schedule.

Frequently asked questions

Severance requires a residential building permit (new construction) for: Plans must comply with the 2024 IRC and 2024 IECC as adopted, and meet the Town's Design Criteria: 115 mph ultimate wind speed (ice and water shield + under-floor protection required), Seismic Design Category B, 30-inch frost line, 30 PSF roof live load / 15 PSF roof dead load / 30 PSF ground snow load; EV-ready, Solar-ready, and Electric-ready documentation required per the 2026 SAFEbuilt Residential Application Checklist: minimum 40-amp EV circuit within 3 ft of a parking space; roof plan solar-ready zone(s) with prewire routing and truss dead-load verification; electric-ready prewire note and full-load calculation for new single-family/two-family/townhome dwellings; Manual J, D, and S compliance calculations required; 2024 IECC energy code compliance required via ResCheck or an energy rating company report, or full prescriptive-method documentation; Engineered structural plans and foundation plans stamped by a Colorado-licensed engineer; Metro District/HOA approval letter required if applicable (check with subdivision ARC committee before submitting); Contractor must hold a current Town of Severance Contractor License (Class A or B) plus, for electrical/plumbing trades, a current Colorado State license (contemporaneously verified, no separate town fee for those trades); Since 2015: footing, foundation reinforcement, perimeter drain (Colorado-licensed engineer inspection), and U-fer ground engineer letters plus a signed Town Setback Certification form must be submitted to SAFEbuilt before the underground plumbing inspection and before framing begins; Applications submitted online via the Community Core portal only. If your project isn't listed, confirm with Town of Severance Building & Permits Department (Planning Services, Attn: Building Department) at 970-692-7315 before starting work.

In Severance, the published Building Permit / Inspection Fee is: Valuation-based, determined by SAFEbuilt Colorado. Additional published fees: Use Tax — 3% assessed on 60% of the Total Valuation of Improvement as determined by SAFEbuilt; Administration Fee — Greater of 30% of total inspection fees or $30.00; Planning Review Fee — Greater of 15% of total inspection fees or $30.00; Transportation Impact Fee (Single Family, per unit) — $6,075.00; Park Impact Fee (Single Family, per unit) — $1,645.00; General Government Impact Fee (Single Family, per unit) — $2,611.00; Police Impact Fee (Single Family, per unit) — $749.00; Water Utility Impact Fee (3/4-inch meter) — $16,975.00; Card Processing Fee — 3% surcharge on credit/debit card payments; no fee for e-check. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Severance's published plan-review target for a residential building permit (new construction) is Up to 15 business days.

You'll need: Building Permit Application; Site/Plot Plan; Architectural/Floor Plans, Engineered Structural Plans, Electrical Plans, Mechanical Plans; Manual J, D, and S Compliance Calculations; 2024 IECC Energy Code Compliance (ResCheck or equivalent); Setback Certification Letter and Form. Depending on your project, Severance may also ask for: Metro District/HOA Approval Letter. See the required-documents checklist on this page for details on each.

The Town of Severance Building & Permits Department administers the permit process, but plan review and inspections are contracted out to SAFEbuilt Colorado (windsor@safebuilt.com, 866-671-1036 / 970-674-1037). Applications are submitted online through the Community Core portal.

Apply through Town of Severance Building & Permits Department (Planning Services, Attn: Building Department) at 3 S. Timber Ridge Parkway, P.O. Box 339, Severance, CO 80546. Phone: 970-692-7315, email: building@townofseverance.org. Office hours: Monday-Friday, 8:00 am - 5:00 pm. General Permit Clerk / Town Hall line also published as 970-686-1218 (fax 970-686-6250) on Building Department PDF forms; primary Building Department contact line is 970-692-7315. Plan review and inspections are contracted out to SAFEbuilt Colorado, which uses its own contact channel (see inspections note).. Official information: https://www.townofseverance.org/173/Building-Permits.

Severance, Colorado has adopted: 2024 International Residential Code (IRC) — Town of Severance 'Design Criteria Town of Severance' document (SAFEbuilt/Town primary source, DocumentCenter/View/1106), Residential Construction section; 2024 International Energy Conservation Code (IECC) — same source, Residential Construction section; 2023 National Electrical Code (NEC) — same source, listed under both Residential and Commercial Construction sections; 2024 International Building Code (IBC) — same source, Commercial Construction section; 2024 International Plumbing Code (IPC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (library.municode.com/co/severance, Chapter 18, Article 4, Sec. 18-4-10, successfully retrieved live via browser rendering on 2026-07-23) states: 'The International Plumbing Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Plumbing Code' (Ord. 2019-07 § 4; Ord. No. 2025-27, § 6, enacted Dec. 9, 2025) — i.e. the codified ordinance readopted/carried forward the 2018 IPC edition even in the same Dec. 9, 2025 recodification that moved most other codes to 2024. The codified Municipal Code (the Town's actual adopted law) is treated as authoritative over the SAFEbuilt client-facing summary sheet for this fact; IPC is 2018, not 2024, in Severance.; 2024 International Mechanical Code (IMC) — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 3, Sec. 18-3-10, retrieved live 2026-07-23) states: 'The International Mechanical Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Mechanical Code' (Ord. No. 2025-27, § 4, enacted Dec. 9, 2025) — the same Dec. 9, 2025 recodification ordinance that adopted 2024 IBC/IRC/IECC/IFGC/IPMC/IEBC left IMC at the 2018 edition. The codified Municipal Code is treated as authoritative over the SAFEbuilt summary sheet; IMC is 2018, not 2024, in Severance.; 2024 International Fuel Gas Code (IFGC) — same source, Commercial Construction section; 2024 International Energy Code — same source, Commercial Construction section (listed as a separate line from the 2024 IECC entry under Residential; the Town's document does not clarify whether these are intended as the same document cited twice or two distinct adoptions, so both are recorded as they appear on the primary source); 2024 Pool and Spa Code — per the 2024 Client Design Criteria document (SAFEbuilt/Town, Commercial Construction section); HOWEVER, the Town's own codified Municipal Code (Chapter 18, Article 12, Sec. 18-12-10, retrieved live 2026-07-23) states: 'The International Swimming Pool and Spa Code, 2018 Edition ... is hereby adopted by reference as the Town of Severance Swimming Pool and Spa Code' (Ord. No. 2025-27, § 9, enacted Dec. 9, 2025). The codified Municipal Code is treated as authoritative; ISPSC is 2018, not 2024, in Severance. (No standalone swimming-pool permit-type entry exists in this file's permitTypes array, so this correction is recorded here only; the 2024 Swimming Pools Guide, DocumentCenter/View/203, is a generic SAFEbuilt trade guide and does not itself state a code edition or fee/timeline figure.); 2024 International Property Maintenance Code — same source, 'Other Adopted Codes' section; 2024 International Existing Building Code — same source, 'Other Adopted Codes' section; State Codes (as listed on the Town's own Design Criteria document): Electric Ready, Solar Ready, EV Ready — consistent with Colorado HB22-1362's statewide energy/electrification floor (2021 IECC-derived electric-ready, solar-ready, EV-ready provisions, effective window July 2023-July 2026); confirmed independently by the '2026 SAFEbuilt Residential Application Checklist' (DocumentCenter/View/1149), which requires EV-ready (min. 40A circuit within 3ft of a car space), Solar-ready (roof-plan solar zones, prewire routing, truss dead-load verification), and Electric-ready (pre-wire location/note and full electric-appliance load calculation for new single-family, two-family, and townhome dwellings) documentation for permit submittal, and by the New Commercial Plan Submittal Procedure (DocumentCenter/View/182), which states 'EV ready, Solar ready and Electric ready are now required to be shown on plans.'; Note on a separate SAFEbuilt-published document: the '2023 NEC Photovoltaic System Submittal Requirements' guide (DocumentCenter/View/210, last revised 08.11.2023) states 'Applicable current codes are the 2023 NEC, 2018 International Codes' — this conflicts with the Town-specific 2024 Client Design Criteria document and appears to be a generic/stale SAFEbuilt template not yet updated to Severance's current 2024 code cycle; the Town's own jurisdiction-specific Design Criteria document (2024, explicitly labeled 'Severance') is treated as authoritative for this file rather than the generic PV guide.; Note on a secondary (non-.gov, AI-generated meeting-summary) source found during research: a Citizen Portal article describing a Severance Town Council work session states building official Russ Weber (SAFEbuilt) briefed Council on the 2024 ICC model codes and state-mandated changes, and that no formal adoption ordinance/vote occurred at that specific work session — Council directed staff to return with a formal adoption package excluding wildfire-resiliency provisions pending clarification. This source was NOT used as a citation for any fact in this file (it is a third-party AI-summarized meeting recap, not an official Town/.gov document, and is explicitly excluded per this project's official-sources-only policy). It is noted here only as context for why a formal Chapter 18 Municode ordinance number could not be independently confirmed in the original research session — Municode's Severance library (library.municode.com/co/severance) returned only its client-side Angular application shell (no server-rendered ordinance text) to both a standard WebFetch and a full-browser-header curl request in that session. The Town's own primary-source Design Criteria and permit-guide PDFs (all dated 2026 or explicitly labeled '2024 IRC'/'2024 International Codes') were used instead as the governing record of currently-adopted codes at that time.; UPDATE 2026-07-23: Municode's Severance library WAS successfully retrieved this session using the Claude Browser pane (direct navigation with specific nodeId query parameters, e.g. ?nodeId=CH18BURE_ART1BUCO, renders the JS-driven Angular SPA's actual section text — a plain WebFetch/curl request only ever returns the pre-render shell). The codified Municipal Code confirms: 'SEVERANCE MUNICIPAL CODE Codified through Ordinance No. 2025-27, enacted December 9, 2025' (Supp. No. 15, online content updated June 29, 2026), which repealed and re-enacted Chapter 18 Articles 1-10 and 12 in full. This resolved the previously-unconfirmed ordinance number (Ord. No. 2025-27 is exactly the Dec-2025-era code-adoption ordinance this file's original research could not pin down) and, on cross-check against every article, surfaced three code-edition corrections against the SAFEbuilt Design Criteria PDF: IMC and IPC are codified at the 2018 edition (not 2024) per Ord. No. 2025-27 §§ 4 and 6, and the Swimming Pool and Spa Code is codified at the 2018 edition (not 2024) per Ord. No. 2025-27 § 9 — see the corrected codesAdopted entries above. IBC, IRC, IECC, IFGC, IPMC, and IEBC are independently confirmed at the 2024 edition per the same ordinance (Sec. 18-1-10, 18-2-10, 18-8-10, 18-6-10, 18-9-10, 18-10-10), and NEC is confirmed at 2023 (Sec. 18-4-40, Ord. No. 2023-09). Chapter 18, Article 11 (Building Permits, Sec. 18-11-10 'Issuance' and Sec. 18-11-20 'Surcharge') was also checked in full: it contains only permit-issuance criteria and the administration surcharge (30% of inspection fees or $30.00, matching this file's existing Administration Fee line) — no permit-type-specific review-timeline SLA and no demolition-specific fee or process are codified anywhere in Chapter 18, confirming (from the Town's own adopted law, the strongest available primary source) that the review-timeline and demolition-fee gaps noted throughout this file's permitTypes are genuine publication gaps rather than a research miss. Separately, Ordinance No. 2025-08 adopted the 2024 International Fire Code (not previously tracked in this file's codesAdopted list; out of scope to add here since no fire-permit type exists in this file's permitTypes array).. Local amendments apply — see the Severance overview page for the full list.

Yes. The Town's 2026 SAFEbuilt Residential Application Checklist requires EV-ready (minimum 40-amp circuit within 3 ft of a parking space), Solar-ready (roof plan solar zones, prewire routing, truss load verification), and Electric-ready (prewire location and full electric-appliance load calculation) documentation for new single-family, two-family, and townhome dwellings, consistent with Colorado's statewide HB22-1362 energy/electrification requirements.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Severance building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.