Severance building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Severance, Colorado.

Verified 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
3 S. Timber Ridge Parkway, P.O. Box 339, Severance, CO 80546
Phone
970-692-7315
Office hours
Monday-Friday, 8:00 am - 5:00 pm. General Permit Clerk / Town Hall line also published as 970-686-1218 (fax 970-686-6250) on Building Department PDF forms; primary Building Department contact line is 970-692-7315. Plan review and inspections are contracted out to SAFEbuilt Colorado, which uses its own contact channel (see inspections note).

Published scheduling rules

  • Severance contracts ALL plan review and inspections to SAFEbuilt Colorado — the Town itself handles permit intake/issuance and Certificate of Occupancy sign-off, but questions about plan review status or inspection scheduling should go to SAFEbuilt (windsor@safebuilt.com, 866-671-1036 / 970-674-1037), not the Town's general Building Department line. (General)

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footing

    After trenches excavated and forms erected, prior to concrete placement

  2. 2

    Foundation / Underground Plumbing

    Foundation reinforcement and U-fer ground per engineer letters; underground plumbing inspection requires prior submittal of footing, foundation, perimeter drain, and U-fer engineer letters plus signed Setback Certification

  3. 3

    Frame/Rough (including utility rough-ins)

    After roof, framing, bracing, and fasteners are in place

  4. 4

    Water and Sewer Line Open Trench

    Finalized by the Town and SAFEbuilt before backfilling

  5. 5

    Final Meter Pit and Hard Surface Inspection

    Must be completed within 2 weeks of Certificate of Occupancy

  6. 6

    Final Inspection

    All trades must sign off before Certificate of Occupancy is printed

Applies to: Residential Addition / Remodel / Accessory Structure Permit

  1. 1

    Footings

    After trenches excavated and forms erected, prior to concrete placement

  2. 2

    Slab

    Prior to placing concrete, where applicable

  3. 3

    Frame/Rough (including utility rough-ins if installed)

    After roof, framing, bracing, and fasteners are in place

  4. 4

    Final Inspection

    After the structure is completed

Applies to: Deck / Covered Patio / Carport Permit

  1. 1

    Footing

    Prior to concrete placement

  2. 2

    Frame/Rough

    Structural framing and house-attachment connection complete before cover

  3. 3

    Final Inspection

    Guardrails, stairs, and structural connections verified complete

Applies to: Commercial Tenant Finish / Remodel Permit

  1. 1

    Rough Electrical/Mechanical/Plumbing

    Trade rough-ins before concealment

  2. 2

    Final Inspection

    All trades complete per approved plans

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring, panel, and circuit installation before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system verified

Applies to: EV Charger / Electric Vehicle Charging Station Permit

  1. 1

    Rough Electrical

    New circuit wiring, breaker, and disconnect verified before concealment

  2. 2

    Final Inspection

    Charging unit installed, panel labeled, circuit verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, venting/combustion air verified

Applies to: Plumbing Permit

  1. 1

    Underground / Rough Plumbing

    Requires prior submittal of footing, foundation, perimeter drain, and U-fer engineer letters plus signed Setback Certification before this inspection may be requested (new single-family homes)

  2. 2

    Final Inspection

    Fixtures connected, venting and leak-testing verified

Applies to: Re-Roof Permit

  1. 1

    Mid-Roof Inspection

    May be required; consult the Building Department upon permit issuance

  2. 2

    Final Roof Inspection

    Permit holder must call for this inspection

Applies to: Rooftop Solar / Photovoltaic Permit

  1. 1

    Rough Electrical

    Conduit runs, disconnects, and mounting/attachment hardware before cover

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified, system energized

Final inspection only: Demolition Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Severance building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Severance building permits

Get alerts for Severance

We'll email you when Severance's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.