Yuma building permits
VerifiedYuma, Colorado — as published 2026-08-26.
Verified 2026-08-02 · Source
Codes adopted
Permit types & fees
Building Permit (New Construction, Addition, Alteration, Repair)
VerifiedCity of Yuma issues a single general-purpose Building Permit Application covering new construction, additions, alterations, and repairs to residential structures, selected via a 'Class of Work' checkbox (New / Addition / Alteration / Repair / Move / Remove / Demolition) on one shared form. Reviewed under the 2015 IBC/IRC as adopted. No separate application exists per project type.
Verified 2026-08-02 · Source
Requirements
- Complete the City of Yuma Building Permit Application, selecting the applicable Class of Work checkbox (New, Addition, Alteration, Repair, Move, Remove, or Demolition)
- Provide owner name/address, contractor name and license number (where applicable to the trade), type of construction, occupancy group/division, zone, fire zone, zoning, and total estimated cost of project
- Attach a sketch of the project if applicable (sketch-attached checkbox on the form)
- Plans filed as required for the scope of work; the Building Inspector determines plan submittal requirements case by case (no separate published plan-submittal checklist was found distinct from the application form itself)
- Required inspections must be requested one working day in advance (call 970-848-3878)
- Work must be commenced within 6 months of permit issuance or the permit becomes invalid; work suspended or abandoned for 1 year likewise invalidates the permit
Required documents
- RequiredBuilding Permit ApplicationCity of Yuma's single shared application form covering New/Addition/Alteration/Repair/Move/Remove/Demolition classes of work; available at City Hall or via the City's Permits and Forms webpage
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $100.00 | Resolution #46, Series of 2024, City of Yuma Fee Schedule, effective 11/19/2024 |
| Building Permit Fee — valuation $501.00 and up | $100.00 for the first $500.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof) | Resolution #46, Series of 2024 |
| Penalty — work started prior to obtaining a building permit | $150.00 | Resolution #46, Series of 2024 |
Building Permit (Commercial New Construction, Addition, Alteration, Tenant Improvement)
VerifiedCommercial new construction, additions, alterations, tenant improvements, and repairs in the City of Yuma use the same single Building Permit Application used for residential work, selected via the same 'Class of Work' checkboxes, and are reviewed under the same adopted 2015 IBC. Municode Section 15.04.010 adopts the 2015 IBC for 'all property, buildings and structures' city-wide, not residential-limited, and Municode Sections 15.08.010/15.08.030 establish the Building Official as a City office rather than a county or contracted building department. Resolution #46, Series of 2024 (City of Yuma Fee Schedule, effective 11/19/2024) was read directly, page by page, and its Building Permit Fees table carries one valuation-based schedule with no separate commercial line item, no plan review fee, and no construction use tax. A new tenant or new use occupying existing commercial space can separately require a Zoning Compliance Permit under Municode Section 17.04.406, and a use marked conditional rather than by-right in the applicable zoning district's Schedule of Permitted Uses can require a Conditional Use Permit before City Council under Municode Chapter 17.05.
Verified 2026-08-26 · Source
Requirements
- Complete the City of Yuma Building Permit Application, the same shared form used for residential work, selecting the applicable Class of Work checkbox (New, Addition, Alteration, Repair, Move, Remove, or Demolition)
- Provide owner name/address, contractor name and license number where applicable to the trade, type of construction, occupancy group/division, zone, fire zone, zoning, and total estimated cost of the project
- Reviewed under the 2015 International Building Code as adopted by Municode Section 15.04.010, which applies to all property, buildings, and structures city-wide rather than to residential construction only
- No separate commercial plan review or plan check fee is published; the valuation-based Building Permit Fee is the only charge shown on the City's fee schedule for this permit
- A change in use — a new tenant or new use occupying existing commercial space — separately requires a Zoning Compliance Permit under Municode Section 17.04.406 before the change begins and/or before a Certificate of Occupancy is issued
- A proposed use marked conditional rather than by-right in the applicable zoning district's Schedule of Permitted Uses requires a Conditional Use Permit approved by City Council under Municode Chapter 17.05
- Fire code compliance for commercial construction falls under the City's own Fire Department and the adopted 2015 International Fire Code; no distinct fire plan-review fee or submittal process is published, so confirm current practice with the Building Inspector before assuming it is bundled with or separate from the building permit
- Required inspections must be requested one working day in advance (call 970-848-3878)
- Work must be commenced within 6 months of permit issuance or the permit becomes invalid; work suspended or abandoned for 1 year likewise invalidates the permit
Required documents
- RequiredBuilding Permit ApplicationCity of Yuma's single shared application form covering New/Addition/Alteration/Repair/Move/Remove/Demolition classes of work for both residential and commercial projects; available at City Hall or via the City's Permits and Forms webpage
- OptionalZoning Compliance Permit ApplicationRequired separately, before the change begins and/or before a Certificate of Occupancy is issued, whenever the project involves a new tenant or new use in existing commercial space (Municode Section 17.04.406); not part of the Building Permit Application itself and not administered by the Building Inspector
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $100.00 | Resolution #46, Series of 2024, City of Yuma Fee Schedule (effective 11/19/2024), Building Permit Fees table — confirmed by a direct page-by-page read of the fee schedule PDF, 2026-08-26; Show full citationHideResolution #46, Series of 2024, City of Yuma Fee Schedule (effective 11/19/2024), Building Permit Fees table — confirmed by a direct page-by-page read of the fee schedule PDF, 2026-08-26; the table applies one uniform valuation-based schedule to residential and commercial permits alike, with no separate commercial line item |
| Building Permit Fee — valuation $501.00 and up | $100.00 for the first $500.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof) | Resolution #46, Series of 2024, City of Yuma Fee Schedule, Building Permit Fees table — confirmed by a direct page-by-page read of the fee schedule PDF, 2026-08-26 |
| Penalty — work started prior to obtaining a building permit | $150.00 | Resolution #46, Series of 2024, City of Yuma Fee Schedule, Building Permit Fees table — confirmed by a direct page-by-page read of the fee schedule PDF, 2026-08-26 |
| Plan Review Fee | No plan review fee is published | Resolution #46, Series of 2024, City of Yuma Fee Schedule was read directly, page by page, 2026-08-26: no plan review or plan check fee line item appears anywhere in the schedule's Building Permit… Show full citationHideResolution #46, Series of 2024, City of Yuma Fee Schedule was read directly, page by page, 2026-08-26: no plan review or plan check fee line item appears anywhere in the schedule's Building Permit Fees table or elsewhere in the document, and the Building Permit Application form carries no plan-review fee field |
| Construction Use Tax | No construction use tax is published for the City of Yuma | Checked the City of Yuma Fee Schedule (Resolution #46, Series of 2024), the City's website sitemap for a finance or revenue department page, and the Building Inspection and Permits and Forms pages… Show full citationHideChecked the City of Yuma Fee Schedule (Resolution #46, Series of 2024), the City's website sitemap for a finance or revenue department page, and the Building Inspection and Permits and Forms pages directly, 2026-08-26: none publish a construction-materials use tax or a sales/use tax collected at building permit issuance for the City of Yuma |
Demolition Permit
VerifiedDemolition is one of the explicit 'Class of Work' checkbox options (New / Addition / Alteration / Repair / Move / Remove / Demolition) on the City's single shared Building Permit Application, billed under the same valuation-based fee schedule as other building permit work — confirmed 2026-07-23 by a direct read of Municode §15.04.010 ('Adopted'), which states the adopted 2015 IBC governs '...the condemnation of buildings and structures unfit for human occupancy and use and the demolition of such structures in the City of Yuma; providing for the issuance of permits and collection of fees therefor...'. No separate City-specific demolition application or fee category is published. Independent of the City process, Colorado state law requires an asbestos inspection and a CDPHE notification (with its own fee and a 10-working-day waiting period) before ANY demolition in the state, regardless of size or whether asbestos is found.
Verified 2026-07-23 · Source
Requirements
- Complete the City of Yuma Building Permit Application, selecting the 'Demolition' Class of Work checkbox
- Provide total estimated cost/valuation of the demolition project for fee calculation
- Coordinate utility disconnects (water, sewer, electric) with the City prior to demolition; no separate published checklist for this step was found beyond the general permit process
- STATE REQUIREMENT, independent of the City permit: under Colorado Air Quality Control Commission Regulation 8, Part B, administered by the Colorado Department of Public Health and Environment (CDPHE) Air Pollution Control Division, the building or area to be demolished must first be inspected for asbestos by a Colorado-certified asbestos inspector, and "you must provide notification for all demolitions of all facilities" - a Demolition Notification Application Form goes to CDPHE with a notification fee even if no asbestos is found, and a mandatory 10-working-day notification period runs before demolition can commence. This applies statewide rather than only in Yuma, and it is in addition to, not a substitute for, the City's Building Permit Application.
Required documents
- RequiredBuilding Permit Application (Demolition class of work)Same shared form used for all building permit classes of work
- RequiredCDPHE Demolition Notification Application FormSubmitted to the Colorado Department of Public Health and Environment (Air Pollution Control Division), not the City of Yuma, prior to any demolition statewide, even if no asbestos was found during the required pre-demolition inspection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as general building permits) | $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00 | Resolution #46, Series of 2024 — no separate demolition-specific fee line item was found; billed under the general Building Permit Fee schedule |
| State of Colorado CDPHE Demolition Notice Fee (separate from the City permit) | $50.00 base fee plus $5.00 per 1,000 square feet | Per CDPHE's Asbestos support and guidance: Renovation, demolition, and certification page. Pay it to CDPHE through its online payment portal, not to the City of Yuma; it is required statewide for all demolitions regardless of whether asbestos is found |
Re-Roof Permit
VerifiedRequired for roofing and re-roofing projects in the City of Yuma. Work must conform to Chapter 15 of the 2015 IBC/IRC/ICC. No contractor license is required. A distinctive feature of Yuma's process is a photo-based remote mid-roof inspection option as an alternative to an onsite visit.
Verified 2026-07-06 · Source
Requirements
- A building permit is required before starting any roofing or re-roofing project
- Work must conform to Chapter 15 of the 2015 IBC, IRC, and ICC as specified
- No contractor license is required for roofing work
- Mid-roof inspection required for all roofs, satisfied either by an onsite visit from the Building Inspector or by submitting photos of all roof slopes (plus the building front) once underlayment is installed
- Final inspection performed in-person by the Building Inspector once the roof is complete
Required documents
- RequiredBuilding Permit Application (Roofing/Re-Roof scope)Same shared Building Permit Application form; obtained from City Hall or the City's website
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as general building permits) | $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00 | Resolution #46, Series of 2024 — no separate flat re-roof fee is published; billed under the general Building Permit Fee schedule |
Electrical Permit
VerifiedElectrical permits and inspections within City of Yuma limits are administered by the Colorado State Electrical Board (Division of Professions and Occupations, DORA/DPO) rather than the City itself. Yuma County does not appear on the State's published list of counties with their own local Electrical Inspection Program, so State jurisdiction applies. Governed by the National Electrical Code (NEC) edition currently adopted by the State Electrical Board.
Verified 2026-07-06 · Source
Requirements
- Confirmed NOT locally administered: Yuma County is absent from the Colorado DPO 'Electrical Local Inspection Areas' exception list (Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Delta (City of Delta only), Denver, Douglas, Eagle, El Paso, Jefferson, Larimer, Mesa, Pitkin, Pueblo, Routt, San Miguel (Telluride/Mountain Village), Summit, Teller, Weld) — meaning the State, not the City, holds inspection jurisdiction
- Yuma County's own official Land Use Contact List page directs applicants to the State's online electrical permit system (dpo.colorado.gov/Electrical) rather than a City or County office
- Permit purchased through the State's Online Permitting System; a valid credit card, job site address, and (for electrical) square footage of living space to be wired, power supplier name, and materials/labor cost are required at application
- Per State policy, the contractor/contractor representative or an adult homeowner (18+) or their representative must be present for inspection of occupied dwelling units
- A homeowner may self-perform electrical work at their own residence and pull the permit themselves; a hired Electrical Contractor is responsible for obtaining the permit, and the homeowner should not submit the application themselves in that case
Required documents
- RequiredState of Colorado Online Electrical Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Electrical; not a City of Yuma form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Electrical Permit Fee | Set by the Colorado State Electrical Board fee schedule (not a City of Yuma fee) | Fee amounts are determined by the State's own published Electrical Board fee schedule (dpo.colorado.gov/Electrical), not by the City of Yuma's Resolution #46 Fee Schedule, since the City does not administer this permit type |
Plumbing Permit
VerifiedPlumbing permits and inspections within City of Yuma limits are administered by the Colorado State Plumbing Board (Division of Professions and Occupations, DORA/DPO) rather than the City itself. Yuma County does not appear on the State's published list of counties with their own local Plumbing Inspection Program, so State jurisdiction applies. Governed by the most recent International Plumbing Code (IPC) edition adopted by the State of Colorado.
Verified 2026-07-06 · Source
Requirements
- Confirmed NOT locally administered: Yuma County is absent from the Colorado DPO 'Plumbing Local Inspection Areas' exception list (Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Clear Creek, Denver, Douglas, Eagle, El Paso, Elbert, Garfield, Gilpin, Grand, Jackson, Jefferson, La Plata, Lake, Larimer, Mesa, Moffat, Pitkin, Prowers, Pueblo, Routt, Summit, Teller, Weld) — meaning the State, not the City, holds inspection jurisdiction
- Yuma County's own official Land Use Contact List page directs applicants to the State's online plumbing permit system (dpo.colorado.gov/Plumbing) rather than a City or County office
- Permit purchased through the State's Online Permitting System; residential installations require a fixture count (traps, water hammer arrestors, backflow preventers, water heaters, fuel gas outlets, fuel gas pressure regulators); commercial installations require a valuation of installation
- A separate permit is required for each detached structure on the same property
- Per State policy, the contractor/contractor representative or an adult homeowner (18+) or their representative must be present for inspection of occupied dwelling units
Required documents
- RequiredState of Colorado Online Plumbing Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Plumbing; not a City of Yuma form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Plumbing Permit Fee | Set by the Colorado State Plumbing Board fee schedule (not a City of Yuma fee) | Fee amounts are determined by the State's own published Plumbing Board fee schedule (dpo.colorado.gov/Plumbing), not by the City of Yuma's Resolution #46 Fee Schedule, since the City does not administer this permit type |
Rooftop Solar / Photovoltaic Permit
VerifiedRequired for solar PV (and small wind turbine) installations connecting to the City of Yuma Utilities electric grid. Requires both a building permit and an electrical inspection (performed by the State Electrical Board, since the City has no local electrical program), plus a separate Application for Interconnection and Facilities Interconnection Agreement with City of Yuma Utilities.
Verified 2026-07-06 · Source
Requirements
- Building permit required for the physical installation
- Electrical inspection required, performed by the State Electrical Board (City of Yuma has no local electrical inspection program; see electrical-permit entry)
- Separate Application for Interconnection and Facilities Interconnection Agreement required with City of Yuma Utilities before connecting to the grid
- Customer must purchase and install a meter socket on the generator output and a lockable, utility-accessible disconnect switch
- Net metering available for residential systems up to 10 kW and commercial systems up to 25 kW; larger systems may still interconnect but are billed differently (see fees)
- Wind turbines are treated the same as solar PV systems for interconnection purposes
Required documents
- RequiredApplication for Interconnection (City of Yuma Utilities, Document A)Submitted to City of Yuma Utilities with the applicable processing fee; requires job site address, system size, and equipment details
- RequiredFacilities Interconnection AgreementExecuted between the customer and City of Yuma Utilities prior to grid connection
- RequiredBuilding Permit ApplicationCity of Yuma's shared Building Permit Application, for the physical PV installation
- RequiredState Electrical PermitPurchased through the State Electrical Board's Online Permitting System for the required electrical inspection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Interconnection processing fee — systems 25 kW-DC and under | $250.00, non-refundable | Per the City of Yuma Utilities Interconnection Policy and Guidelines and the Colorado Rooftop Solar and Net Metering FAQ distributed by City of Yuma Utilities |
| Interconnection processing fee — systems larger than 25 kW | $500.00, non-refundable | Per the Rooftop Solar and Net Metering FAQ |
| Building Permit Fee (same valuation-based schedule as general building permits) | $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00 | Resolution #46, Series of 2024 |
| State Electrical Permit Fee | Set by the Colorado State Electrical Board fee schedule (not a City fee) | — |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedThe City of Yuma has no dedicated EV charger/EVSE permit type or fee line. As with rooftop solar, the electrical portion of an EV charger installation (circuit wiring, panel/service upgrade, equipment) is permitted and inspected by the Colorado State Electrical Board (DORA/DPO), not the City's Building Inspector, since Yuma County does not appear on the State's list of counties with a local Electrical Inspection Program. A separate City of Yuma structural building permit (valuation-based, Resolution #46, Series of 2024) may apply if the installation involves new construction (e.g., a carport or panel enclosure). No City of Yuma Utilities interconnection fee applies to an EV charger the way it does to solar, since a charger draws power rather than exporting it to the grid. Because Yuma County has no local electrical inspection program, the governing mechanism is the State Electrical Board's direct statutory authority under C.R.S. § 12-115-120(2): a state electrical inspector must inspect the work within three WORKING days of the inspection request (§ 12-115-120(2)(b)), and the Board sets its own fee based on actual inspection cost (§ 12-115-121(1)) rather than a published table. The Board's current rules (3 CCR 710-1) likewise publish no static fee schedule.
Verified 2026-07-20 · Source
Requirements
- Apply for the electrical permit covering EV charger circuit wiring and equipment installation directly through the Colorado State Electrical Board's Online Permitting System (dpo.colorado.gov/Electrical) — NOT through the City of Yuma's Building Inspector, which has no electrical-permitting jurisdiction here
- Work must comply with whichever NEC edition the Colorado State Electrical Board currently has adopted
- If the charger installation is bundled with new construction or a structural addition, a separate City of Yuma structural building permit (valuation-based, Resolution #46, Series of 2024) applies for that portion
- A homeowner may self-perform electrical work at their own residence and pull the State permit themselves; a hired Electrical Contractor is responsible for obtaining the permit if one is hired
Required documents
- RequiredState of Colorado Online Electrical Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Electrical for the EV charger circuit/equipment work; not a City of Yuma form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Electrical Board Permit Fee | Set by the State Electrical Board per C.R.S. § 12-115-121(1) based on actual inspection cost — calculated and charged online at the DPO Online Permitting System, not published as a static table | No dedicated EV-specific fee tier exists; Show full citationHideNo dedicated EV-specific fee tier exists; same state-administered mechanism documented in the electrical-permit and rooftop-solar-pv-permit entries. The statutory reference point is § 12-115-121(2)(a)'s cap of $120 (base, CPI-adjusted annually since Jan 1, 2021) plus up to an 8% valuation-based surcharge, which governs LOCAL government fees — not the State Board's own direct-inspection fee for jurisdictions like Yuma County |
| Building Permit Fee (structural portion, if new construction/addition is involved) | $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00 | Resolution #46, Series of 2024 — applies only if the EV charger installation involves new structural work beyond the electrical circuit itself |
Zoning Compliance Permit (Change in Use)
Discovered on a dedicated 2026-08-02 adversarial re-verification pass (Municode Chapter 17.04 read directly for the first time in the history). Municode §17.04.406 ('Changes in Use') makes a Zoning Compliance Permit a codified prerequisite for any change in use in any zoning district: 'A change in use shall require that the person proposing such change be issued a zoning compliance permit prior to initiating the change and/or receiving a certificate of occupancy.' This is the actual code hook behind the 'Zoning Compliance Permit $30.00' and 'Change In Use $50.00' fee lines in Resolution #46's Land Use Fees table, and is the gate most likely to actually fire for an ordinary tenant-improvement scenario (a new tenant or new use occupying existing commercial space) — distinct from, and in addition to, the general Building Permit Application/2015 IBC process documented in the residential-building-permit entry.
Reviewed 2026-08-02 · Source
Requirements
- Present the proposed change in use to the City Manager or designee, who determines which procedure applies (Municode §17.04.406)
- Obtain a Zoning Compliance Permit BEFORE initiating the change in use and/or before receiving a Certificate of Occupancy
- If the proposed new use is listed as conditional ('C') rather than by-right ('X') for the applicable zoning district in §17.04.402's Schedule of Permitted Uses, the separate Conditional Use Permit process (see conditional-use-permit entry) applies instead of, or in addition to, this permit — this record could not retrieve the Schedule of Permitted Uses chart's contents from Municode to state which uses trigger that escalation
Required documents
- RequiredZoning Compliance Permit ApplicationThe City's Permits and Forms page publishes no standalone Zoning Compliance Permit application form; the City Manager or designee determines the applicable procedure per § 17.04.406, so confirm the intake process and form with City Hall (970-848-3878)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Zoning Compliance Permit | $30.00 | Resolution #46, Series of 2024, Land Use Fees table |
| Change In Use | $50.00 | Resolution #46, Series of 2024, Land Use Fees table — listed as a separate line item from the Zoning Compliance Permit fee above; Show full citationHideResolution #46, Series of 2024, Land Use Fees table — listed as a separate line item from the Zoning Compliance Permit fee above; the ordinance text (§17.04.406) does not itself use the phrase 'Change In Use' as a distinct fee category, so this record cannot confirm from primary sources whether both fees apply together to one change-of-use transaction or whether 'Change In Use' is a duplicate/alternate label for the same action — flagged honestly rather than guessed at |
Conditional Use Permit
Discovered on a dedicated 2026-08-02 adversarial re-verification pass (Municode Chapter 17.05 read directly for the first time in the history — the prior pass had cited only the Title 17 table of contents). Required under Municode §§17.05.501-509 whenever a proposed use is listed as conditional ('C') rather than by-right ('X') for the applicable zoning district in §17.04.402's Schedule of Permitted Uses. Approved (or denied) by City Council after a public hearing, not administered by the Building Inspector. A genuine zoning-based gate a commercial or TI project could hit depending on its proposed use — distinct from, and in addition to, the general Building Permit Application/2015 IBC process documented in the residential-building-permit entry.
Reviewed 2026-08-02 · Source
Requirements
- Submit 10 copies of a complete application to the City at least 30 days prior to a regularly scheduled City Council meeting (§17.05.503)
- Application must include: a current list of property owners within 300 feet per Yuma County Assessor records; a list of easements, encumbrances, rights-of-way, and protective covenants; a statement of intent; a complete site plan (existing adjacent land uses, existing/proposed buildings and structures, off-street parking and loading, access, signage, pedestrian/open space, natural or manmade features); a time schedule for development; and documentation of compliance with Chapter 17.06 special regulations where applicable
- Written concurrence of all owners of record is required if the applicant is not the sole owner
- Public hearing notice must be published in a newspaper of general circulation and mailed to property owners within 300 feet at least 10 days prior to the City Council hearing (§17.05.502)
- City Council renders a final decision — approval, conditional approval with imposed conditions, or denial — with reasons stated in the official meeting minutes and mailed to the applicant (§17.05.505-506)
Required documents
- RequiredConditional Use Permit ApplicationFiled with the City at least 30 days before a regularly scheduled City Council meeting, per §17.05.503; no standalone form was located as a separate published PDF after direct checking 2026-08-02 — confirm intake process with City Hall (970-848-3878)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Conditional Use Permit | $125.00 | Resolution #46, Series of 2024, Land Use Fees table |
Historic Preservation Alteration Certificate (Certificate of Appropriateness)
Discovered on a dedicated 2026-08-02 adversarial re-verification pass: Municode TITLE 16 — HISTORIC PRESERVATION (Chapter 16.01, created by Ord. 1-2018) was never checked by any prior pass in this record — every source list previously jumped straight from Title 15 to Title 17. Title 16 creates a seven-member Historic Preservation Commission that issues Alteration Certificates for locally-designated historic structures, sites, and districts. Critically, §16.01.090.B states: 'The Building Department shall not issue a building permit for work on designated structures or features until an alteration certificate or exemption certificate has been obtained by the property owner' — a genuine, codified building-permit-blocking gate. However, this gate only binds properties that have gone through Yuma's own LOCAL historic-designation process (separate from listing on the National or State Register); the City's own Historic Preservation Committee webpage, read directly 2026-08-02, states 'there has not been a process in place for a local designation' and describes the Commission's current work as still an identification/planning phase, so this record could not confirm how many (if any) properties are currently subject to this gate in practice — the designated-properties list is kept at the Yuma Public Library (970-848-2368), not published online.
Reviewed 2026-08-02 · Source
Requirements
- This chapter only applies to a structure, site, or district that has gone through Yuma's LOCAL historic-designation process: nomination on City-provided forms (75% property-owner approval required for a district nomination), a Historic Preservation Commission public hearing held within 60 days of the nomination being deemed complete, a Commission decision within 30 days after the hearing concludes, and recording of the designation resolution with the Yuma County Clerk and Recorder (§§16.01.060,.070,.080)
- For a LOCALLY-DESIGNATED structure/site/feature: no construction, alteration, restoration, removal, or demolition may occur, and the Building Department will not issue a building permit for the work, until an Alteration Certificate (or a Certificate of Exemption) is obtained from the Commission (§16.01.090.A-B)
- File a 'Historic Preservation Committee Review Application (Request for a Certificate of Appropriateness)' with the Commission (c/o Yuma Public Library, PO Box 291, Yuma CO 80759, 970-848-2368) before starting work; the Commission meets the 3rd Monday of each month when there is something to review, with a submittal deadline of the last day of the month prior to the target meeting
- Required submittal items per the application form: detailed project description (scope, materials, design elements, colors), proof of ownership, historic and present photos of the property, a site plan (if applicable, showing access/property lines/setbacks/driveways/parking), and elevations with height indicated (if applicable)
- Administrative staff approval (without a full Commission hearing) is available for: repainting in approved colors, minor repairs that don't affect exterior appearance, normal maintenance, interior work, and pruning/removal of dead landscape materials (application form, page 2)
- The owner or authorized agent must be present at the HPC review hearing; an approved Alteration Certificate is valid for one year and void thereafter
- A Commission denial (or an approval with unacceptable conditions) may be appealed in writing to the City Council within 20 days of the Commission's decision (§16.01.090.G, §16.01.110)
Required documents
- RequiredHistoric Preservation Committee Review Application (Request for a Certificate of Appropriateness)Two-page City of Yuma form; submitted to the Historic Preservation Committee c/o Yuma Public Library, not the Building Department
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Historic Preservation Committee / Alteration Certificate review | No fee found | The City's full consolidated Fee Schedule (Resolution #46, Series of 2024) contains no Historic Preservation, Alteration Certificate, or Certificate of Appropriateness fee line item anywhere in its six pages. Show full citationHideThe City's full consolidated Fee Schedule (Resolution #46, Series of 2024) contains no Historic Preservation, Alteration Certificate, or Certificate of Appropriateness fee line item anywhere in its six pages. The PDF is unindexed and a fee line is easy to miss there, so confirm with the City before assuming no fee applies. |
Sign Permit
VerifiedThe City of Yuma's Resolution #46, Series of 2024 (Fee Schedule, effective 11/19/2024) lists a 'Sign Permit' as its own line item, billed 'Same as building permit fee.' Read that line from the fee schedule's Building Permit Fees page as published rather than from a copy-paste — the table's rows wrap across multiple lines when copied, which can attach a dollar figure to the wrong row. Beyond that one fee line, no dedicated Sign Code chapter, standalone sign application form, or sign-specific design/placement standard could be located: Municode/amlegal Title 17 (Zoning Regulations) was reviewed chapter by chapter (17.01 General Provisions, 17.02 Zoning Districts, 17.03 Rules and Definitions, 17.04 Use Regulations, 17.05 Conditional Uses and Variances, 17.06 Special Regulations, 17.07 Fence Regulations, 17.12 AID Airport Influence District) and none is titled or scoped to signs; the City's Permits and Forms webpage lists no sign-specific application PDF (only the general Building Permit Application, Excavation Permit Application, and Roofing/Siding/Window Requirements handout). Signs in Yuma therefore appear to be processed through the same general Building Permit Application used for every other project type, billed at the general valuation-based fee schedule.
Verified 2026-08-14 · Source
Requirements
- The City publishes no dedicated Sign Permit application form separate from its general Building Permit Application on the Permits and Forms page
- No dedicated Sign Code chapter (design standards, height/area limits, illumination rules, exemptions) was located in Title 15 (Building and Construction) or Title 17 (Zoning Regulations) of the Municipal Code after a chapter-by-chapter check
- The Resolution #46 Fee Schedule confirms a sign permit is required and is billed at the same rate as a building permit — implying the same general 'Class of Work' Building Permit Application process (New/Addition/Alteration/Repair/Move/Remove/Demolition checkboxes) applies, likely under 'Other' or 'Alteration,' since no distinct 'Sign' checkbox exists on that form
- Confirm current sign-specific requirements (height, area, illumination, setback) directly with the Building Inspector (970-630-7118) or City Hall (970-848-3878) before finalizing a sign design, since no governing design-standard document could be located publicly
Required documents
- RequiredBuilding Permit Application (Sign scope)Same shared City of Yuma form used for all other classes of work; no distinct 'Sign' checkbox exists, so this would likely be submitted under 'Alteration' or 'Other'
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit | Same as building permit fee: $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof) above $500.00 | Resolution #46, Series of 2024, City of Yuma Fee Schedule, effective 11/19/2024 — the 'Sign Permit / Same as building permit fee' row. This table's rows wrap in a way that garbles a copy-paste, so read the row from the page as laid out |
Fire Sprinkler / Fire Alarm System Permit
VerifiedFire code enforcement in the City of Yuma is administered by the City's own Fire Department (the Yuma Volunteer Fire Department, organized November 26, 1920), under the 2015 International Fire Code as adopted by Municode/amlegal Chapter 15.16 (§15.16.010, 'Adopted') — see codesAdopted. The City of Yuma Fire Department's own webpage (cityofyuma.colorado.gov/fire-department) is purely a historical narrative page about the volunteer department's 1920 founding, with no fire-prevention, plan-review, or permit content of any kind. The City's Resolution #46 Fee Schedule contains no line item for a sprinkler system, fire alarm system, or fire suppression permit — 'Sign Permit' and 'Fence Permit' are the only permit-adjacent lines beyond the general Building Permit Fees table. No sprinkler/alarm-specific application form appears on the City's Permits and Forms page either.
Verified 2026-08-14 · Source
Requirements
- The City publishes no sprinkler- or alarm-specific permit application, fee schedule, or submittal checklist — none appears on the City's Fire Department page, its Permits and Forms page, or the 2024 Fee Schedule (Resolution #46)
- The City of Yuma has adopted the 2015 International Fire Code by reference (Municode/amlegal §15.16.010), which governs the substantive fire-protection-system design/installation standards, but this record could not confirm a distinct City permitting process or fee for fire sprinkler/alarm work separate from the general Building Permit Application
- A fire sprinkler or alarm installation accompanying new construction or an alteration would, at minimum, need the City's general Building Permit Application (New/Addition/Alteration/Repair/Move/Remove/Demolition checkboxes), billed at the same valuation-based fee schedule documented in the residential-building-permit entry
- Confirm current sprinkler/alarm permitting practice directly with City Hall (970-848-3878) or the Building Inspector (970-630-7118), since the City's own Fire Department webpage publishes no permit-related content
Required documents
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler / Fire Alarm System Permit | No dedicated fee line exists in the City of Yuma's Resolution #46 Fee Schedule for sprinkler systems, fire alarm systems, or fire suppression work — only 'Sign Permit' and 'Fence Permit' appear as… Show full citationHideNo dedicated fee line exists in the City of Yuma's Resolution #46 Fee Schedule for sprinkler systems, fire alarm systems, or fire suppression work — only 'Sign Permit' and 'Fence Permit' appear as permit-adjacent lines beyond the general Building Permit Fees table. Contact the Building Inspector directly: 970-630-7118, building.inspector@yumacolo.org, or City Hall: 970-848-3878, 320 South Main Street, Yuma, CO 80759. |
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.