Version history — Yuma, Colorado
This is PermitBase’s own verified record for Yuma, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Yuma’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-25Superseded
- 2026-08-21Superseded
- 2026-08-17Superseded
- 2026-08-14Superseded
- 2026-08-02Superseded
- Yuma, Colorado — Zoning Compliance Permit (Change in Use) record added
- Yuma, Colorado — Conditional Use Permit record added
- Yuma, Colorado — Historic Preservation Alteration Certificate (Certificate of Appropriateness) record added
- 2026-07-23Superseded
- Yuma, Colorado — adopted-codes record updated
- Yuma, Colorado — Demolition Permit fee record added: State of Colorado CDPHE Demolition Notice Fee (separate from the City permit) ($50.00 base fee plus $5.00 per 1,000 square feet)
- 2026-07-20Superseded
- Yuma, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record added: State Electrical Board Permit Fee (Set by the State Electrical Board per C.R.S. § 12-115-121(1) based on actual inspection cost — calculated and charged online at the DPO Online Permitting System, not published as a static table)
- Yuma, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record removed: State Electrical Permit Fee
- Yuma, Colorado — plan-review timeline record updated: undefined–3 business days
- Yuma, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Yuma began