This is PermitBase’s published record for Yuma as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Yuma building permits
Yuma, Colorado — as published 2026-07-06.
Reviewed 2026-07-06 · Source
Codes adopted
Permit types & fees
Building Permit (New Construction, Addition, Alteration, Repair)
VerifiedCity of Yuma issues a single general-purpose Building Permit Application covering new construction, additions, alterations, and repairs to residential structures, selected via a 'Class of Work' checkbox (New / Addition / Alteration / Repair / Move / Remove / Demolition) on one shared form. Reviewed under the 2015 IBC/IRC as adopted. No separate application exists per project type.
Verified 2026-07-06 · Source
Requirements
- Complete the City of Yuma Building Permit Application, selecting the applicable Class of Work checkbox (New, Addition, Alteration, Repair, Move, Remove, or Demolition)
- Provide owner name/address, contractor name and license number (where applicable to the trade), type of construction, occupancy group/division, zone, fire zone, zoning, and total estimated cost of project
- Attach a sketch of the project if applicable (sketch-attached checkbox on the form)
- Plans filed as required for the scope of work; the Building Inspector determines plan submittal requirements case by case (no separate published plan-submittal checklist was found distinct from the application form itself)
- Required inspections must be requested one working day in advance (call 970-848-3878)
- Work must be commenced within 6 months of permit issuance or the permit becomes invalid; work suspended or abandoned for 1 year likewise invalidates the permit
Required documents
- RequiredBuilding Permit ApplicationCity of Yuma's single shared application form covering New/Addition/Alteration/Repair/Move/Remove/Demolition classes of work; available at City Hall or via the City's Permits and Forms webpage
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $100.00 | Resolution #46, Series of 2024, City of Yuma Fee Schedule, effective 11/19/2024 |
| Building Permit Fee — valuation $501.00 and up | $100.00 for the first $500.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof) | Resolution #46, Series of 2024 |
| Penalty — work started prior to obtaining a building permit | $150.00 | Resolution #46, Series of 2024 |
Demolition Permit
Demolition is one of the explicit 'Class of Work' checkbox options (New / Addition / Alteration / Repair / Move / Remove / Demolition) on the City's single shared Building Permit Application, billed under the same valuation-based fee schedule as other building permit work. No separate demolition-specific application or fee category is published.
Reviewed 2026-07-06 · Source
Requirements
- Complete the City of Yuma Building Permit Application, selecting the 'Demolition' Class of Work checkbox
- Provide total estimated cost/valuation of the demolition project for fee calculation
- Coordinate utility disconnects (water, sewer, electric) with the City prior to demolition; no separate published checklist for this step was found beyond the general permit process
Required documents
- RequiredBuilding Permit Application (Demolition class of work)Same shared form used for all building permit classes of work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as general building permits) | $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00 | Resolution #46, Series of 2024 — no separate demolition-specific fee line item was found; billed under the general Building Permit Fee schedule |
Re-Roof Permit
VerifiedRequired for roofing and re-roofing projects in the City of Yuma. Work must conform to Chapter 15 of the 2015 IBC/IRC/ICC. No contractor license is required. A distinctive feature of Yuma's process is a photo-based remote mid-roof inspection option as an alternative to an onsite visit.
Verified 2026-07-06 · Source
Requirements
- A building permit is required before starting any roofing or re-roofing project
- Work must conform to Chapter 15 of the 2015 IBC, IRC, and ICC as specified
- No contractor license is required for roofing work
- Mid-roof inspection required for all roofs, satisfied either by an onsite visit from the Building Inspector or by submitting photos of all roof slopes (plus the building front) once underlayment is installed
- Final inspection performed in-person by the Building Inspector once the roof is complete
Required documents
- RequiredBuilding Permit Application (Roofing/Re-Roof scope)Same shared Building Permit Application form; obtained from City Hall or the City's website
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as general building permits) | $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00 | Resolution #46, Series of 2024 — no separate flat re-roof fee is published; billed under the general Building Permit Fee schedule |
Electrical Permit
VerifiedElectrical permits and inspections within City of Yuma limits are administered by the Colorado State Electrical Board (Division of Professions and Occupations, DORA/DPO) rather than the City itself. Yuma County does not appear on the State's published list of counties with their own local Electrical Inspection Program, so State jurisdiction applies. Governed by the National Electrical Code (NEC) edition currently adopted by the State Electrical Board.
Verified 2026-07-06 · Source
Requirements
- Confirmed NOT locally administered: Yuma County is absent from the Colorado DPO 'Electrical Local Inspection Areas' exception list (Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Delta (City of Delta only), Denver, Douglas, Eagle, El Paso, Jefferson, Larimer, Mesa, Pitkin, Pueblo, Routt, San Miguel (Telluride/Mountain Village), Summit, Teller, Weld) — meaning the State, not the City, holds inspection jurisdiction
- Yuma County's own official Land Use Contact List page directs applicants to the State's online electrical permit system (dpo.colorado.gov/Electrical) rather than a City or County office
- Permit purchased through the State's Online Permitting System; a valid credit card, job site address, and (for electrical) square footage of living space to be wired, power supplier name, and materials/labor cost are required at application
- Per State policy, the contractor/contractor representative or an adult homeowner (18+) or their representative must be present for inspection of occupied dwelling units
- A homeowner may self-perform electrical work at their own residence and pull the permit themselves; a hired Electrical Contractor is responsible for obtaining the permit, and the homeowner should not submit the application themselves in that case
Required documents
- RequiredState of Colorado Online Electrical Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Electrical; not a City of Yuma form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Electrical Permit Fee | Set by the Colorado State Electrical Board fee schedule (not a City of Yuma fee) | Fee amounts are determined by the State's own published Electrical Board fee schedule (dpo.colorado.gov/Electrical), not by the City of Yuma's Resolution #46 Fee Schedule, since the City does not administer this permit type |
Plumbing Permit
VerifiedPlumbing permits and inspections within City of Yuma limits are administered by the Colorado State Plumbing Board (Division of Professions and Occupations, DORA/DPO) rather than the City itself. Yuma County does not appear on the State's published list of counties with their own local Plumbing Inspection Program, so State jurisdiction applies. Governed by the most recent International Plumbing Code (IPC) edition adopted by the State of Colorado.
Verified 2026-07-06 · Source
Requirements
- Confirmed NOT locally administered: Yuma County is absent from the Colorado DPO 'Plumbing Local Inspection Areas' exception list (Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Clear Creek, Denver, Douglas, Eagle, El Paso, Elbert, Garfield, Gilpin, Grand, Jackson, Jefferson, La Plata, Lake, Larimer, Mesa, Moffat, Pitkin, Prowers, Pueblo, Routt, Summit, Teller, Weld) — meaning the State, not the City, holds inspection jurisdiction
- Yuma County's own official Land Use Contact List page directs applicants to the State's online plumbing permit system (dpo.colorado.gov/Plumbing) rather than a City or County office
- Permit purchased through the State's Online Permitting System; residential installations require a fixture count (traps, water hammer arrestors, backflow preventers, water heaters, fuel gas outlets, fuel gas pressure regulators); commercial installations require a valuation of installation
- A separate permit is required for each detached structure on the same property
- Per State policy, the contractor/contractor representative or an adult homeowner (18+) or their representative must be present for inspection of occupied dwelling units
Required documents
- RequiredState of Colorado Online Plumbing Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Plumbing; not a City of Yuma form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Plumbing Permit Fee | Set by the Colorado State Plumbing Board fee schedule (not a City of Yuma fee) | Fee amounts are determined by the State's own published Plumbing Board fee schedule (dpo.colorado.gov/Plumbing), not by the City of Yuma's Resolution #46 Fee Schedule, since the City does not administer this permit type |
Rooftop Solar / Photovoltaic Permit
VerifiedRequired for solar PV (and small wind turbine) installations connecting to the City of Yuma Utilities electric grid. Requires both a building permit and an electrical inspection (performed by the State Electrical Board, since the City has no local electrical program), plus a separate Application for Interconnection and Facilities Interconnection Agreement with City of Yuma Utilities.
Verified 2026-07-06 · Source
Requirements
- Building permit required for the physical installation
- Electrical inspection required, performed by the State Electrical Board (City of Yuma has no local electrical inspection program; see electrical-permit entry)
- Separate Application for Interconnection and Facilities Interconnection Agreement required with City of Yuma Utilities before connecting to the grid
- Customer must purchase and install a meter socket on the generator output and a lockable, utility-accessible disconnect switch
- Net metering available for residential systems up to 10 kW and commercial systems up to 25 kW; larger systems may still interconnect but are billed differently (see fees)
- Wind turbines are treated the same as solar PV systems for interconnection purposes
Required documents
- RequiredApplication for Interconnection (City of Yuma Utilities, Document A)Submitted to City of Yuma Utilities with the applicable processing fee; requires job site address, system size, and equipment details
- RequiredFacilities Interconnection AgreementExecuted between the customer and City of Yuma Utilities prior to grid connection
- RequiredBuilding Permit ApplicationCity of Yuma's shared Building Permit Application, for the physical PV installation
- RequiredState Electrical PermitPurchased through the State Electrical Board's Online Permitting System for the required electrical inspection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Interconnection processing fee — systems 25 kW-DC and under | $250.00, non-refundable | Per the City of Yuma Utilities Interconnection Policy and Guidelines and the Colorado Rooftop Solar and Net Metering FAQ distributed by City of Yuma Utilities |
| Interconnection processing fee — systems larger than 25 kW | $500.00, non-refundable | Per the Rooftop Solar and Net Metering FAQ |
| Building Permit Fee (same valuation-based schedule as general building permits) | $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00 | Resolution #46, Series of 2024 |
| State Electrical Permit Fee | Set by the Colorado State Electrical Board fee schedule (not a City fee) | — |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.