Yuma building permits

Verified

Yuma, Colorado — as published 2026-07-07.

Verified 2026-07-23 · Source

Codes adopted

2015 International Building Code (IBC) — per the City's own 'Roofing, Siding and Window Requirements' handout ('All projects must conform to Chapter 15 of the 2015 IBC, IRC and ICC as specified'; Siding requirements cite '2015 IBC Chapter 14 section 1403'); this is the most current, actively-maintained City-published statement of adopted edition found after full chasing.2015 International Residential Code (IRC) — same source as above.2015 International Existing Building Code (IEBC) — RE-VERIFIED 2026-07-23 on a live primary source: Municode Chapter 15.28 (§15.28.010, 'Adopted') was read directly via the Browser pane (which renders Municode's Angular SPA server-side content client-side, unlike a plain fetch/curl request, which still returns only the app shell), current through Supplement No. 5 (codified through Ordinance No. 5-2025, adopted 4-15-2025; online content updated 7-25-2025). Full section text confirmed verbatim: 'There is hereby adopted by reference the International Existing Building Code, 2015 edition, as published by the International Code Council, as the Existing Building Code of the City of Yuma, Colorado, regulating and governing the repair, alteration, change of occupancy, addition and relocation of existing buildings...' (Ord. 17-2018, 2018). This closes the prior partial-confidence flag, which had relied only on a search-engine-indexed snippet rather than a directly re-read chapter body.2015 International Fire Code (IFC) — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.16 (§15.16.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the International Fire Code, 2015 edition, as published by the International Code Council, as the Fire Code of the City of Yuma, Colorado...' (Ord. 17-2018, 2018) (administered by Fire Department, not modeled in this file's permitTypes).2015 International Property Maintenance Code (IPMC) — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.30 (§15.30.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the International Property Maintenance Code, 2015 edition...' (Ord. 17-2018, 2018) (administered by Code Enforcement, not modeled in this file's permitTypes).Most recent International Plumbing Code (IPC) as adopted by the State of Colorado, adopted by reference by the City of Yuma — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.32 (§15.32.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the most recent International Plumbing Code, adopted by the State of Colorado, as published by the International Code Council, as the Plumbing Code of the City of Yuma, Colorado...' (Ord. 17-2018, 2018) — confirming the City ties its plumbing code edition to whatever the State of Colorado has adopted rather than naming a fixed edition year itself; see localAmendments for why plumbing permits/inspections are administered by the State Plumbing Board (DORA/DPO), not the City, for Yuma jurisdiction.2015 International Energy Conservation Code (IECC), with the 2015 IECC/IRC Table R402.1.2/N1102.1.2 U-factor/SHGC table and the 2012 IECC/IRC Table R402.1.1/N1102.1.1 table both cited as applicable (values stated as identical between the two editions) in the City's 'Roofing, Siding and Window Requirements' handout, for window replacement energy compliance specifically.2023 National Electrical Code (NEC) as adopted by the Colorado State Electrical Board — City of Yuma does not run its own local electrical program (see localAmendments); wiring work is governed by whatever NEC edition the State Electrical Board has adopted, verify current edition directly with the State Electrical Board (dpo.colorado.gov/Electrical) at time of permit, since the City does not separately publish or amend an NEC edition of its own.No newer code-edition cycle (e.g. 2018, 2021, or 2024 IBC/IRC family) is referenced anywhere on the City's Building Inspection page, Permits and Forms page, Roofing/Siding/Window Requirements handout, or Building Permit Application form after full chasing (page fetch via full-header curl, PDF text extraction, and Municode search-index snippet) — the City's actively-maintained public materials consistently cite the 2015 ICC family, so this file records 2015 IBC/IRC/IEBC/IFC/IPMC as the governing adopted editions rather than assuming a later cycle. RE-VERIFIED 2026-07-23 with a genuinely new avenue — the Municode Library's own live Supplement History Table (nodeId=SUHITA, read directly via the Browser pane) — confirms the CURRENT codification is Supplement No. 5 (online content updated 7-25-2025), which lists every ordinance considered for codification through Ordinance No. 5-2025 (adopted 4-15-2025) as either 'Included' or 'Omitted'; no ordinance postdating 4-15-2025 (including no Dec-2025-era ordinance) appears anywhere in that table, and a direct read of every Title 15 code-adoption chapter (15.04, 15.10, 15.12, 15.16, 15.24, 15.28, 15.30, 15.32, 15.36, 15.40, 15.41) confirms each still cites its original 2015-cycle edition (or, for Chapter 15.24, the 1997 UCADB), with the only post-2018 touch to any of these chapters being the identical, uniform Ord. No. 3-2025 (4-1-2025) penalty-cross-reference amendment applied chapter-by-chapter — not a code-edition update. This is a live, direct, chapter-by-chapter confirmation (not an inference from absence), and closes this line to full confidence: as of 2026-07-23, Yuma has adopted no newer I-code cycle than 2015.

Permit types & fees

Building Permit (New Construction, Addition, Alteration, Repair)

Verified

City of Yuma issues a single general-purpose Building Permit Application covering new construction, additions, alterations, and repairs to residential structures, selected via a 'Class of Work' checkbox (New / Addition / Alteration / Repair / Move / Remove / Demolition) on one shared form. Reviewed under the 2015 IBC/IRC as adopted. No separate application exists per project type.

Verified 2026-07-06 · Source

Requirements

  • Complete the City of Yuma Building Permit Application, selecting the applicable Class of Work checkbox (New, Addition, Alteration, Repair, Move, Remove, or Demolition)
  • Provide owner name/address, contractor name and license number (where applicable to the trade), type of construction, occupancy group/division, zone, fire zone, zoning, and total estimated cost of project
  • Attach a sketch of the project if applicable (sketch-attached checkbox on the form)
  • Plans filed as required for the scope of work; the Building Inspector determines plan submittal requirements case by case (no separate published plan-submittal checklist was found distinct from the application form itself)
  • Required inspections must be requested one working day in advance (call 970-848-3878)
  • Work must be commenced within 6 months of permit issuance or the permit becomes invalid; work suspended or abandoned for 1 year likewise invalidates the permit

Required documents

  • RequiredBuilding Permit ApplicationCity of Yuma's single shared application form covering New/Addition/Alteration/Repair/Move/Remove/Demolition classes of work; available at City Hall or via the City's Permits and Forms webpage

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$100.00Resolution #46, Series of 2024, City of Yuma Fee Schedule, effective 11/19/2024
Building Permit Fee — valuation $501.00 and up$100.00 for the first $500.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof)Resolution #46, Series of 2024
Penalty — work started prior to obtaining a building permit$150.00Resolution #46, Series of 2024

Demolition Permit

Verified

Demolition is one of the explicit 'Class of Work' checkbox options (New / Addition / Alteration / Repair / Move / Remove / Demolition) on the City's single shared Building Permit Application, billed under the same valuation-based fee schedule as other building permit work — confirmed 2026-07-23 by a direct read of Municode §15.04.010 ('Adopted'), which states the adopted 2015 IBC governs '...the condemnation of buildings and structures unfit for human occupancy and use and the demolition of such structures in the City of Yuma; providing for the issuance of permits and collection of fees therefor...'. No separate City-specific demolition application or fee category is published. Independent of the City process, Colorado state law requires an asbestos inspection and a CDPHE notification (with its own fee and a 10-working-day waiting period) before ANY demolition in the state, regardless of size or whether asbestos is found.

Verified 2026-07-23 · Source

Requirements

  • Complete the City of Yuma Building Permit Application, selecting the 'Demolition' Class of Work checkbox
  • Provide total estimated cost/valuation of the demolition project for fee calculation
  • Coordinate utility disconnects (water, sewer, electric) with the City prior to demolition; no separate published checklist for this step was found beyond the general permit process
  • STATE REQUIREMENT (independent of the City permit, RE-VERIFIED 2026-07-23 on a live primary source): per Colorado Air Quality Control Commission Regulation 8, Part B, administered by the Colorado Department of Public Health and Environment (CDPHE) Air Pollution Control Division, the building or area to be demolished must first be inspected for asbestos by a Colorado-certified asbestos inspector, and 'you must provide notification for all demolitions of all facilities' — a Demolition Notification Application Form must be submitted to CDPHE, along with payment of a notification fee, even if no asbestos is found, and a mandatory 10-working-day notification period is required before demolition can commence. This applies statewide (not a City-of-Yuma-specific requirement) and is in addition to, not a substitute for, the City's Building Permit Application.

Required documents

  • RequiredBuilding Permit Application (Demolition class of work)Same shared form used for all building permit classes of work
  • RequiredCDPHE Demolition Notification Application FormSubmitted to the Colorado Department of Public Health and Environment (Air Pollution Control Division), not the City of Yuma, prior to any demolition statewide, even if no asbestos was found during the required pre-demolition inspection

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule as general building permits)$100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00Resolution #46, Series of 2024 — no separate demolition-specific fee line item was found; billed under the general Building Permit Fee schedule
State of Colorado CDPHE Demolition Notice Fee (separate from the City permit)$50.00 base fee plus $5.00 per 1,000 square feetPer CDPHE's Asbestos support and guidance: Renovation, demolition, and certification page (live-verified 2026-07-23), paid to CDPHE via its online payment portal, not to the City of Yuma; required statewide for all demolitions regardless of whether asbestos is found

Re-Roof Permit

Verified

Required for roofing and re-roofing projects in the City of Yuma. Work must conform to Chapter 15 of the 2015 IBC/IRC/ICC. No contractor license is required. A distinctive feature of Yuma's process is a photo-based remote mid-roof inspection option as an alternative to an onsite visit.

Verified 2026-07-06 · Source

Requirements

  • A building permit is required before starting any roofing or re-roofing project
  • Work must conform to Chapter 15 of the 2015 IBC, IRC, and ICC as specified
  • No contractor license is required for roofing work
  • Mid-roof inspection required for all roofs, satisfied either by an onsite visit from the Building Inspector or by submitting photos of all roof slopes (plus the building front) once underlayment is installed
  • Final inspection performed in-person by the Building Inspector once the roof is complete

Required documents

  • RequiredBuilding Permit Application (Roofing/Re-Roof scope)Same shared Building Permit Application form; obtained from City Hall or the City's website

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule as general building permits)$100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00Resolution #46, Series of 2024 — no separate flat re-roof fee is published; billed under the general Building Permit Fee schedule

Electrical Permit

Verified

Electrical permits and inspections within City of Yuma limits are administered by the Colorado State Electrical Board (Division of Professions and Occupations, DORA/DPO) rather than the City itself. Yuma County does not appear on the State's published list of counties with their own local Electrical Inspection Program, so State jurisdiction applies. Governed by the National Electrical Code (NEC) edition currently adopted by the State Electrical Board.

Verified 2026-07-06 · Source

Requirements

  • Confirmed NOT locally administered: Yuma County is absent from the Colorado DPO 'Electrical Local Inspection Areas' exception list (Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Delta (City of Delta only), Denver, Douglas, Eagle, El Paso, Jefferson, Larimer, Mesa, Pitkin, Pueblo, Routt, San Miguel (Telluride/Mountain Village), Summit, Teller, Weld) — meaning the State, not the City, holds inspection jurisdiction
  • Yuma County's own official Land Use Contact List page directs applicants to the State's online electrical permit system (dpo.colorado.gov/Electrical) rather than a City or County office
  • Permit purchased through the State's Online Permitting System; a valid credit card, job site address, and (for electrical) square footage of living space to be wired, power supplier name, and materials/labor cost are required at application
  • Per State policy, the contractor/contractor representative or an adult homeowner (18+) or their representative must be present for inspection of occupied dwelling units
  • A homeowner may self-perform electrical work at their own residence and pull the permit themselves; a hired Electrical Contractor is responsible for obtaining the permit, and the homeowner should not submit the application themselves in that case

Required documents

  • RequiredState of Colorado Online Electrical Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Electrical; not a City of Yuma form

Fee schedule

Fee typeAmountNotes
State Electrical Permit FeeSet by the Colorado State Electrical Board fee schedule (not a City of Yuma fee)Fee amounts are determined by the State's own published Electrical Board fee schedule (dpo.colorado.gov/Electrical), not by the City of Yuma's Resolution #46 Fee Schedule, since the City does not administer this permit type

Plumbing Permit

Verified

Plumbing permits and inspections within City of Yuma limits are administered by the Colorado State Plumbing Board (Division of Professions and Occupations, DORA/DPO) rather than the City itself. Yuma County does not appear on the State's published list of counties with their own local Plumbing Inspection Program, so State jurisdiction applies. Governed by the most recent International Plumbing Code (IPC) edition adopted by the State of Colorado.

Verified 2026-07-06 · Source

Requirements

  • Confirmed NOT locally administered: Yuma County is absent from the Colorado DPO 'Plumbing Local Inspection Areas' exception list (Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Clear Creek, Denver, Douglas, Eagle, El Paso, Elbert, Garfield, Gilpin, Grand, Jackson, Jefferson, La Plata, Lake, Larimer, Mesa, Moffat, Pitkin, Prowers, Pueblo, Routt, Summit, Teller, Weld) — meaning the State, not the City, holds inspection jurisdiction
  • Yuma County's own official Land Use Contact List page directs applicants to the State's online plumbing permit system (dpo.colorado.gov/Plumbing) rather than a City or County office
  • Permit purchased through the State's Online Permitting System; residential installations require a fixture count (traps, water hammer arrestors, backflow preventers, water heaters, fuel gas outlets, fuel gas pressure regulators); commercial installations require a valuation of installation
  • A separate permit is required for each detached structure on the same property
  • Per State policy, the contractor/contractor representative or an adult homeowner (18+) or their representative must be present for inspection of occupied dwelling units

Required documents

  • RequiredState of Colorado Online Plumbing Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Plumbing; not a City of Yuma form

Fee schedule

Fee typeAmountNotes
State Plumbing Permit FeeSet by the Colorado State Plumbing Board fee schedule (not a City of Yuma fee)Fee amounts are determined by the State's own published Plumbing Board fee schedule (dpo.colorado.gov/Plumbing), not by the City of Yuma's Resolution #46 Fee Schedule, since the City does not administer this permit type

Rooftop Solar / Photovoltaic Permit

Verified

Required for solar PV (and small wind turbine) installations connecting to the City of Yuma Utilities electric grid. Requires both a building permit and an electrical inspection (performed by the State Electrical Board, since the City has no local electrical program), plus a separate Application for Interconnection and Facilities Interconnection Agreement with City of Yuma Utilities.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for the physical installation
  • Electrical inspection required, performed by the State Electrical Board (City of Yuma has no local electrical inspection program; see electrical-permit entry)
  • Separate Application for Interconnection and Facilities Interconnection Agreement required with City of Yuma Utilities before connecting to the grid
  • Customer must purchase and install a meter socket on the generator output and a lockable, utility-accessible disconnect switch
  • Net metering available for residential systems up to 10 kW and commercial systems up to 25 kW; larger systems may still interconnect but are billed differently (see fees)
  • Wind turbines are treated the same as solar PV systems for interconnection purposes

Required documents

  • RequiredApplication for Interconnection (City of Yuma Utilities, Document A)Submitted to City of Yuma Utilities with the applicable processing fee; requires job site address, system size, and equipment details
  • RequiredFacilities Interconnection AgreementExecuted between the customer and City of Yuma Utilities prior to grid connection
  • RequiredBuilding Permit ApplicationCity of Yuma's shared Building Permit Application, for the physical PV installation
  • RequiredState Electrical PermitPurchased through the State Electrical Board's Online Permitting System for the required electrical inspection

Fee schedule

Fee typeAmountNotes
Interconnection processing fee — systems 25 kW-DC and under$250.00, non-refundablePer the City of Yuma Utilities Interconnection Policy and Guidelines and the Colorado Rooftop Solar and Net Metering FAQ distributed by City of Yuma Utilities
Interconnection processing fee — systems larger than 25 kW$500.00, non-refundablePer the Rooftop Solar and Net Metering FAQ
Building Permit Fee (same valuation-based schedule as general building permits)$100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00Resolution #46, Series of 2024
State Electrical Permit FeeSet by the Colorado State Electrical Board fee schedule (not a City fee)

EV Charger / Electric Vehicle Charging Station Permit

Verified

The City of Yuma has no dedicated EV charger/EVSE permit type or fee line. As with rooftop solar, the electrical portion of an EV charger installation (circuit wiring, panel/service upgrade, equipment) is permitted and inspected by the Colorado State Electrical Board (DORA/DPO), not the City's Building Inspector, since Yuma County does not appear on the State's list of counties with a local Electrical Inspection Program. A separate City of Yuma structural building permit (valuation-based, Resolution #46, Series of 2024) may apply if the installation involves new construction (e.g., a carport or panel enclosure). No City of Yuma Utilities interconnection fee applies to an EV charger the way it does to solar, since a charger draws power rather than exporting it to the grid. Re-verified 2026-07-20: because Yuma County has no local electrical inspection program, the governing mechanism is the State Electrical Board's direct statutory authority under C.R.S. § 12-115-120(2) — a state electrical inspector must inspect the work within three WORKING days of the inspection request (§ 12-115-120(2)(b)), and the Board sets its own fee based on actual inspection cost (§ 12-115-121(1)) rather than a published table, confirmed directly against both statute sections and the Board's current rules (3 CCR 710-1), which likewise publish no static fee schedule.

Verified 2026-07-20 · Source

Requirements

  • Apply for the electrical permit covering EV charger circuit wiring and equipment installation directly through the Colorado State Electrical Board's Online Permitting System (dpo.colorado.gov/Electrical) — NOT through the City of Yuma's Building Inspector, which has no electrical-permitting jurisdiction here
  • Work must comply with whichever NEC edition the Colorado State Electrical Board currently has adopted
  • If the charger installation is bundled with new construction or a structural addition, a separate City of Yuma structural building permit (valuation-based, Resolution #46, Series of 2024) applies for that portion
  • A homeowner may self-perform electrical work at their own residence and pull the State permit themselves; a hired Electrical Contractor is responsible for obtaining the permit if one is hired

Required documents

  • RequiredState of Colorado Online Electrical Permit (via DORA/DPO Online Permitting System)Purchased directly through dpo.colorado.gov/Electrical for the EV charger circuit/equipment work; not a City of Yuma form

Fee schedule

Fee typeAmountNotes
State Electrical Board Permit FeeSet by the State Electrical Board per C.R.S. § 12-115-121(1) based on actual inspection cost — calculated and charged online at the DPO Online Permitting System, not published as a static tableNo dedicated EV-specific fee tier exists; same state-administered mechanism documented in this file's electrical-permit and rooftop-solar-pv-permit entries. The statutory reference point is § 12-115-121(2)(a)'s cap of $120 (base, CPI-adjusted annually since Jan 1, 2021) plus up to an 8% valuation-based surcharge, which governs LOCAL government fees — not the State Board's own direct-inspection fee for jurisdictions like Yuma County
Building Permit Fee (structural portion, if new construction/addition is involved)$100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 per additional $1,000.00 of valuation above $500.00Resolution #46, Series of 2024 — applies only if the EV charger installation involves new structural work beyond the electrical circuit itself

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →