This is PermitBase’s published record for Boise as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Boise building permits

Verified

Boise, Idaho — as published 2026-07-01.

Verified 2026-06-29 · Source

Codes adopted

2018 International Building Code (IBC) — with Appendices H (Signs) and J (Grading); Mass Timber provisions only of the 2021 IBC2018 International Existing Building Code (IEBC)2018 International Residential Code (IRC), Parts I–IV and IX — with Appendices Q (Tiny Houses) and S (Strawbale Construction)2018 International Energy Conservation Code (IECC)2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code, including Chapter 13 – Medical Gas)2023 National Electrical Code (NEC) — effective April 26, 20242018 International Fire Code (IFC) — with Appendices B, C, D, F and L; 2019 NFPA 13; 2019 NFPA 722018 International Mechanical Code (IMC) — commercial and residential projects with 3+ units2018 International Fuel Gas Code (IFGC) — commercial and residential projects with 3+ units2018 IRC Parts V and VI — single- and two-family residential mechanical and fuel gas

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for all new single-family dwellings, duplexes, and townhouses in Boise. Covers structural construction, framing, envelope, and all associated systems.

Verified 2026-06-29 · Source

Requirements

  • All new residential construction requires a building permit and plan review approval
  • Submit online at permits.cityofboise.org or in person at 150 N Capitol Blvd
  • Plans must meet 2018 IRC and 2018 IECC requirements
  • ePlanReview required for digital plan submission

Required documents

  • RequiredCompleted Permit Application (Form 402/404)Official Boise PDS building permit application form available at permits.cityofboise.org or as a downloadable PDF
  • RequiredNew Residential Submittal ChecklistJuly 2024 checklist of all required plan set elements; must accompany the application
  • RequiredConstruction DrawingsComplete plans including site plan, floor plans, elevations, sections, and structural details drawn to scale
  • RequiredEnergy Code Compliance FormBoise-specific energy code compliance documentation (form dated July 2023) demonstrating compliance with the 2018 IECC
  • OptionalContractor Registration Declaration FormRequired when a licensed contractor (not the homeowner) is performing the work

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $2,000$26.37 for the first $500, plus $2.95 per each additional $100 or fraction thereofBoise Building Code Fee Schedule, Table 1-A (Oct 2021, confirmed identical in Oct 2023)
Building Permit — valuation $2,001 to $25,000$70.76 for the first $2,000, plus $12.71 per each additional $1,000 or fraction thereof
Building Permit — valuation $25,001 to $50,000$362.80 for the first $25,000, plus $9.30 per each additional $1,000 or fraction thereof
Building Permit — valuation $50,001 to $100,000$595.30 for the first $50,000, plus $6.35 per each additional $1,000 or fraction thereof
Building Permit — valuation $100,001 and up$913.09 for the first $100,000, plus $5.17 per each additional $1,000 or fraction thereof
Residential Plan Review (1- and 2-family dwellings, townhouses, and accessory structures)20% of the building permit feePer Boise Building Code Fee Schedule item 9
Reinspection Fee$55 per occurrence

Residential Addition / Alteration Permit

Verified

Required for additions, structural alterations, remodels, basement finishes, decks over 12 inches above grade, retaining walls over 4 feet, and other residential alterations in Boise.

Verified 2026-06-29 · Source

Requirements

  • Room additions and structural modifications
  • Decks more than 12 inches above grade
  • Retaining walls more than 4 feet in height
  • Basement finishes involving framing, electrical, plumbing, or mechanical work
  • Detached accessory structures exceeding 200 square feet
  • Fences exceeding 7 feet in height

Required documents

  • RequiredPermit Application (Form 406)Boise PDS residential additions/alterations application; available online at permits.cityofboise.org
  • RequiredSubmittal ChecklistRequired checklist for the specific alteration type; available on the 406 permit page
  • RequiredConstruction DrawingsPlans showing scope of work, dimensions, structural details, and connection to existing structure
  • OptionalEnergy Code Compliance FormRequired for additions that increase conditioned floor area
  • OptionalContractor Registration Declaration FormRequired when a licensed contractor performs the work
  • OptionalResidential Photovoltaic Systems ChecklistRequired for any solar panel installation under the 406 permit

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based per Table 1-ASame valuation table as new construction: $26.37 + $2.95/$100 (up to $2,000); $70.76 + $12.71/$1,000 ($2,001–$25,000); $362.80 + $9.30/$1,000 ($25,001–$50,000); etc.Boise Building Code Fee Schedule, Table 1-A
Residential Plan Review20% of the building permit feePer Boise Building Code Fee Schedule item 9
Reinspection Fee$55 per occurrence

Residential Electrical Permit

Verified

Required for electrical work in existing single-family dwellings and duplexes in Boise, including panel upgrades, new circuits, wiring for additions, and service changes. All work must comply with the 2023 NEC (effective April 26, 2024).

Verified 2026-06-29 · Source

Requirements

  • Installation, change, or repair of any hard-wired electrical system
  • Panel upgrades and service entrance changes
  • New circuits or rewiring for additions and alterations
  • Generator and solar panel electrical connections
  • Electric vehicle charger (EVSE) outlet installation
  • Homeowner may self-permit electrical work on their own primary or secondary residence per Idaho statute (no contractor license required for homeowner work)

Required documents

  • RequiredElectrical Permit ApplicationAvailable online at permits.cityofboise.org (Residential Electrical – 424) or as a downloadable PDF
  • OptionalHomeowner Electrical Permit GuideRequired reading for homeowners pulling their own permit; April 2026 version available from the 424 permit page

Fee schedule

Fee typeAmountNotes
New SFD / Duplex electrical — up to 2,500 sq ft$135 per dwelling unitBoise Electrical Code Fee Schedule, Table 1-a (Apr 2019)
New SFD / Duplex electrical — 2,501 to 3,500 sq ft$155 per dwelling unit
New SFD / Duplex electrical — 3,501 to 4,500 sq ft$175 per dwelling unit
New SFD / Duplex electrical — 4,501 sq ft or more$210 per dwelling unit, plus $65 per each additional 1,000 sq ft over 4,501 sq ft
Single fixture / appliance installation (existing residence) — base fee + fixture fee$14.00 base + $55 per fixtureApplies to: EV outlets, electric water heaters, electric fireplaces, exhaust fans, ceiling fans, porch lights, single outlets, A/C condensers, hot tubs, etc. — Table 2-b
Service equipment / panel change — up to 200 amp$55Table 5-a — new service entrance equipment or panel change/subpanel
Service equipment / panel change — over 200 amp$65Table 5-a
Multiple fixtures / addition, alteration, or repair$110 flat feeMore than one fixture installed under one permit — Table 3-a
Solar panel installation (electrical, existing residence)$110 (up to two inspections)Table 3-a — separate from the building/structural solar permit fee
Reinspection Fee$55

Residential Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Boise, including water heater replacements, fixture additions, re-piping, and sewer/water service line work. Governed by the 2017 Idaho State Plumbing Code (based on the 2015 UPC).

Verified 2026-06-29 · Source

Requirements

  • Repair, replace, relocate, or add to the plumbing system
  • Water heater installation or replacement
  • New fixtures (toilets, sinks, showers, bathtubs)
  • Water or waste re-piping
  • Sewer or water service line replacement
  • Homeowner may self-permit plumbing work on their own primary or secondary residence per Idaho statute
  • Note: Boilers, gas piping, hydronic heating, and solar thermal water heating require a Mechanical Permit, not a Plumbing Permit

Required documents

  • RequiredPlumbing Permit Application (Form 420-540)Boise PDS plumbing permit application; available online at permits.cityofboise.org or as downloadable PDF
  • OptionalWater Heater Installation GuideBoise-specific water heater guide (updated June 2025) available from the 420 permit page

Fee schedule

Fee typeAmountNotes
New SFD / Duplex plumbing — up to 1,500 sq ft$130 per dwelling unitBoise Plumbing Code Fee Schedule, Table B(1) (Oct 2021)
New SFD / Duplex plumbing — 1,501 to 2,500 sq ft$180 per dwelling unit
New SFD / Duplex plumbing — 2,501 to 3,500 sq ft$250 per dwelling unit
New SFD / Duplex plumbing — 3,501 to 4,500 sq ft$290 per dwelling unit
New SFD / Duplex plumbing — 4,501 sq ft or more$325 per unit, plus $65 per each additional 1,000 sq ft over 4,501 sq ft
Single fixture installation (existing residence) — water heater, toilet, sink, bathtub, shower, backflow preventer, etc.$55Table B(3) — miscellaneous residential plumbing, single fixture
Water or waste re-piping (interior)$80Table B(3)
Re-plumbing entire house or unit$110Table B(3)
Sewer or water service line replacement (single line)$55Table B(3)
Base fee for residential addition/alteration with multiple fixtures$32 base, plus $12 per fixtureTable B(2) — applies to alterations with multiple fixtures; $12 each for water heaters, sinks, toilets, bathtubs, showers, etc.
Reinspection Fee$55

Residential Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, fuel gas, and related mechanical installations in Boise single-family dwellings and duplexes. Covers furnaces, A/C, heat pumps, ductwork, gas fireplaces, gas piping, dryer vents, range hoods, and bath exhaust fans.

Verified 2026-06-29 · Source

Requirements

  • Install or change any part of a heating or cooling system
  • Furnace, air conditioner, heat pump, or boiler installation or replacement
  • Ductwork installation or major modification
  • Gas piping installation or pressure testing
  • Wood stoves, pellet stoves, gas fireplaces installation
  • Gas piping and fuel oil tank installation or modification

Required documents

  • RequiredMechanical Permit ApplicationBoise PDS mechanical permit application (MEC-PDS Application Building.pdf); available online at permits.cityofboise.org or as a PDF

Fee schedule

Fee typeAmountNotes
New SFD / Duplex mechanical — up to 1,500 sq ft$130 per dwelling unitBoise Mechanical Code and Fuel Gas Code Fee Schedule, Table B(1) (Oct 2021)
New SFD / Duplex mechanical — 1,501 to 2,500 sq ft$180 per dwelling unit
New SFD / Duplex mechanical — 2,501 to 3,500 sq ft$250 per dwelling unit
New SFD / Duplex mechanical — 3,501 to 4,500 sq ft$290 per dwelling unit
New SFD / Duplex mechanical — 4,501 sq ft or more$325 per dwelling unit, plus $65 per each additional 1,000 sq ft over 4,501 sq ft
Single mechanical fixture/appliance installation (existing residence)$55Table B(3) — applies to single furnace, A/C, mini-split, gas fireplace, gas piping, pellet stove, woodstove, pool heater, gas fire pit, solar thermal system, etc.
Multiple fixtures — residential addition, alteration, or repair (base fee + per fixture)$32 base, plus $12 per appliance/fixtureTable B(2) — applies to alterations involving multiple fixtures: furnaces, A/C, mini-splits, gas piping pressure tests, ductwork, dryer exhaust, bath exhaust, range hoods, etc.
Reinspection Fee$55

Residential Roofing Permit

Verified

Required for roof replacement, re-roofing, siding replacement, and window replacement in Boise. Permit type 428 covers all three categories.

Verified 2026-06-29 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Re-roofing overlay
  • Siding replacement
  • Window replacement

Required documents

  • RequiredPermit Application (Form 428-534)Boise PDS Roofing/Siding/Windows application; available at permits.cityofboise.org or as a downloadable PDF

Fee schedule

Fee typeAmountNotes
Roofing / Siding / Windows — building permitValuation-based per Table 1-A; residential plan review 20% of permit feeBoise Building Code Fee Schedule, Table 1-A (Oct 2023); roofing projects are typically low-valuation and fall in the $26.37–$70.76 range for most residential re-roofs
Reinspection Fee$55

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems on residential properties in Boise. Requires both a building permit for structural mounting (flat $165 fee) and a separate electrical permit for wiring ($110 for the electrical portion on existing residences).

Verified 2026-06-29 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation associated with solar
  • Building permit (406 — Residential Addition/Alteration with Photovoltaic Checklist) for structural mounting
  • Electrical permit (424 — Residential Electrical) for wiring and inverter connections

Required documents

  • RequiredPermit Application (406)Residential Additions/Alterations permit application for the structural/building portion
  • RequiredResidential Photovoltaic Systems ChecklistRequired checklist for solar installations under the 406 permit; available on the 406 permit page
  • RequiredElectrical Permit Application (424)Separate electrical permit for solar wiring, inverter, and interconnection
  • RequiredSolar Site PlanRoof plan or ground layout showing panel placement and access pathways
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel
  • RequiredStructural Analysis / Roof Load CalculationConfirming existing roof structure can support panel weight; roof snow load in Boise is 25 PSF minimum
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system

Fee schedule

Fee typeAmountNotes
Residential Solar PV — building permit (plan review/inspections)$165 flat feeBoise Building Code Fee Schedule item 11 (Oct 2023): 'Residential Solar Photovoltaic Systems plan review/inspections permit fee: $165'
Residential Solar PV — electrical permit (installation on existing residence)$110 (up to two inspections)Boise Electrical Code Fee Schedule, Table 3-a: 'Installation of solar panels: (up to two inspections) $110'

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of a new accessory dwelling unit on a residential property in Boise, including detached cottages, attached additions, and internal conversions. Boise offers a Pre-Approved ADU program (permit type 402-B) with pre-reviewed plan sets to expedite permitting.

Verified 2026-07-01 · Source

Requirements

  • Property must be zoned to allow an ADU under Boise Zoning Code
  • Pre-Approved ADU program (402-B) allows use of Boise-reviewed plan sets — fastest path
  • Standard ADU uses the New Residential (402) or Additions/Alterations (406) permit depending on type
  • Submit Pre-Approved ADU Submittal Checklist for 402-B program

Required documents

  • RequiredPre-Approved ADU Submittal ChecklistRequired checklist for the 402-B Pre-Approved ADU program; available from the 402-B permit page
  • OptionalConstruction DrawingsFull construction drawings for custom ADU designs; not required if using pre-approved plan set

Fee schedule

Fee typeAmountNotes
ADU Building Permit — valuation-based per Table 1-ASame valuation-based schedule as new residential construction (Table 1-A): $26.37 + $2.95/$100 (up to $2,000); $70.76 + $12.71/$1,000 ($2,001–$25,000); $362.80 + $9.30/$1,000 ($25,001–$50,000); $595.30 + $6.35/$1,000 ($50,001–$100,000); $913.09 + $5.17/$1,000 ($100,001+)Assessed on project valuation per Boise's Building Code Fee Schedule, Table No. 1-A (Oct 2023, item 9 for the 20% residential plan review add-on), cited. Confirmed the schedule has no separate ADU-specific fee line — the 402-B Pre-Approved ADU program page (permits.cityofboise.org checklist/apply-online only) and the fee schedule PDF both show new/converted ADUs are billed as standard residential construction under Table 1-A, same as the 402 New Residential Construction permit.
Residential Plan Review (1- and 2-family dwellings, townhouses, and accessory structures)20% of the building permit feePer Boise Building Code Fee Schedule item 9

Water Heater Permit

Verified

Required for water heater installation or replacement in Boise, issued as a Residential Plumbing Permit (420). A water heater is a single-fixture installation per the Boise Plumbing Code Fee Schedule.

Verified 2026-06-29 · Source

Requirements

  • Water heater replacement (any fuel type — gas, electric, heat pump)
  • New water heater installation
  • Homeowner may self-permit on their own primary or secondary residence per Idaho statute
  • Note: Gas piping modifications for a new water heater require a Mechanical Permit (422)

Required documents

  • RequiredPlumbing Permit Application (420)Boise PDS plumbing permit application; available at permits.cityofboise.org
  • OptionalWater Heater Installation GuideBoise-specific guide (updated June 2025) available from the 420 permit page — review before installation

Fee schedule

Fee typeAmountNotes
Water Heater Replacement — single fixture plumbing permit$55Boise Plumbing Code Fee Schedule, Table B(3): 'Installation of single fixtures or appliances including...hot water heaters...etc. — $55'

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Boise building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-29)Later version (2026-07-16) →View current record →All versions →