Skip to main content
PermitBase

Version history — Boise, Idaho

This is PermitBase’s own verified record for Boise, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Boise’s actual law was at that time.

Permanent link to today’s record

/idaho/ada-county/boise/as-of/2026-07-16/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-07-16Current record
    • Boise, Idaho — plan-review timeline record updated: 9–123 business days
    • Boise, Idaho — plan-review timeline record updated: 1–28 business days
  • 2026-07-01Superseded
    • Boise, Idaho — Accessory Dwelling Unit (ADU) Permit fee record added: Residential Plan Review (1- and 2-family dwellings, townhouses, and accessory structures) (20% of the building permit fee)
    • Boise, Idaho — Accessory Dwelling Unit (ADU) Permit fee record updated: Same valuation-based schedule as new residential construction (Table 1-A); residential plan review is 20% of permit fee → Same valuation-based schedule as new residential construction (Table 1-A): $26.37 + $2.95/$100 (up to $2,000); $70.76 + $12.71/$1,000 ($2,001–$25,000); $362.80 + $9.30/$1,000 ($25,001–$50,000); $595.30 + $6.35/$1,000 ($50,001–$100,000); $913.09 + $5.17/$1,000 ($100,001+)
  • 2026-06-29Initial record — coverage of Boise began