This is PermitBase’s published record for Blackfoot as of 2026-07-04. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Blackfoot building permits
VerifiedBlackfoot, Idaho — as published 2026-07-04.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition / Remodel)
VerifiedRequired for new single-family dwellings, duplexes, zero-lot-line units, additions, remodels/repairs, and accessory structures over 200 sq ft in Blackfoot, administered by the City of Blackfoot Building & Safety Department against the building/residential code 'current edition as adopted by the state' per Municipal Code 10-2-1, plus city-specific design loads (Seismic Design Category D, 50 psf ground snow load, 30-inch frost depth, 90/105 mph wind).
Verified 2026-07-04 · Source
Requirements
- Building permit required for single-family dwellings, duplexes, zero-lot-line units, remodels/repairs, additions, and accessory structures (sheds) over 200 sq ft
- Plans reviewed against the city/state-adopted IBC/IRC/IECC editions (per Municipal Code 10-2-1's 'current edition as adopted by the state' language) plus City design loads (Seismic Design Category D; 50 psf ground snow load / 35 psf roof snow load; 90/105 mph 3-second-gust wind; 30-inch frost depth; 24-inch ice barrier underlayment)
- Two full sets of plans (minimum 18in x 24in, maximum 24in x 36in, minimum 1/4-inch scale), pages numbered and stapled, plus a digital PDF for plan review
- Site plan showing orientation/north arrow, setbacks, lot dimensions, easements, drainage/grading, and all existing/proposed structures
- Energy Code Compliance: either Option 1 (REScheck Performance Approach compliance report) or Option 2 (Prescriptive Approach: R-38 attic, R-20 exterior walls, R-30 floors or R-13 perimeter walls, .35 U-value Low-E windows), clearly indicated on page 1 of plans
- Wall bracing design compliant with IRC 602.10; engineered shear design required for any wall exceeding 10 feet tall
- Manual S & J HVAC load calculations (including fresh-air calculations) submitted with plans
- Flood Plain Certificate from a licensed engineer required if the property is in a flood plain
- Project value disclosed (used to calculate the building permit fee via the Building Permit Fee Table); project value includes overhead/profit plus finish work, electrical, plumbing, HVAC, and owner-supplied items, excluding land value
- Electrical, plumbing, and mechanical/HVAC work requires separate permit applications acquired through the State of Idaho (dbs.idaho.gov/permits/) per the City's own Permits & Applications page -- NOT obtained from the City Building Department (see codesAdopted conflict note regarding the City's own Fee Schedule also listing City-charged mechanical/electrical/plumbing fees)
- Apply via the City's online Permit Applications portal or by requesting a paper Residential Building Permit Application from the Building Department
Required documents
- RequiredResidential Building Permit ApplicationCity of Blackfoot Building Department application form; requires project/owner/contractor/plan designer info, project value, square footages by area (first story, second story, basement, garage, carport, covered porch/patio), type of work, flood plain status, zoning info, and energy code compliance option
- RequiredResidential Plan Review ChecklistDesigner-completed checklist covering site plan, foundation/floor framing plan, floor plan/roof framing plan requirements, signed by the plan designer
- RequiredEnergy Code Compliance Documentation (REScheck report or Prescriptive Approach specification)REScheck cover sheet and inspection checklist (Performance Approach), or prescriptive R-value/U-value specification shown on plans (Prescriptive Approach)
- RequiredManual S & J HVAC CalculationsRequired with plans, showing fresh air calculations
- OptionalFlood Plain CertificateRequired from a licensed engineer if the property is within a flood plain
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee -- valuation $0 to $2,000 | $100 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025), Building Permit Fee Table |
| Building Permit Fee -- valuation over $2,000 to $25,000 | $69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $25,000 to $50,000 | $391.75 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $50,000 to $100,000 | $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $100,000 to $500,000 | $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $500,000 to $1,000,000 | $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $1,000,000 to $5,000,000 | $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000, or fraction thereof, to and including $5,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $5,000,000 to $10,000,000 | $20,208.75 for the first $5,000,000 plus $2.75 for each additional $1,000, or fraction thereof, to and including $10,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $10,000,000 | $33,958.75 for the first $10,000,000 plus $2.00 for each additional $1,000, or fraction thereof | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Plan Review Fee -- Residential (single family, duplex, townhomes, mobile/manufactured homes) | 15% of the Building Permit Fee | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Work without a permit | Double the cost of the permit fee | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Re-inspection fee | $47.00 per inspection | City of Blackfoot Fee Schedule, Resolution No. 425; required when more than two visits per item are needed or work is not ready at requested time; must be paid before re-inspection is scheduled |
| Additional plan review | $47.00 per additional review | City of Blackfoot Fee Schedule, Resolution No. 425; applies when changes/additions/revisions are made to an approved plan |
| Permit Re-instatement Fee | Half the cost of the permit fee | City of Blackfoot Fee Schedule, Resolution No. 425; requestable within one year of permit expiration |
| Temporary Certificate of Occupancy | $1,000 refundable fee | City of Blackfoot Residential Building Permit Application; for certain incomplete work under extenuating circumstances |
General Permits (Demolition / Retaining Wall / Mobile Home Block Set / Roof Repair / Fence)
VerifiedFlat-fee general permits issued by the City of Blackfoot Building & Safety Department for demolition, retaining walls, mobile home standard block-set installation, roof repair (truss and/or sheathing only), and fences (when non-exempt from the building code).
Verified 2026-07-04 · Source
Requirements
- Demolition Permit required for building demolitions within city limits
- Retaining Wall Permit required for retaining wall construction
- Mobile Home Standard Block Set Installation Permit required for mobile home block-set installation
- Roof Repair Only permit (truss and/or sheathing work) required for structural roof repair
- Fence Permit required when the fence is non-exempt from the building code (additional Zoning Department fees may apply separately)
- Apply via the City's online Permit Applications portal or the Building Department
Required documents
- RequiredGeneral Permit ApplicationCity of Blackfoot Building Department application appropriate to the specific general permit type (demolition, retaining wall, mobile home block set, roof repair, fence)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025) |
| Retaining Wall Permit | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Mobile Home Standard Block Set Installation Permit | $140.00 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Roof Repair Only (truss and/or sheathing) | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Fence Permit (non-exempt from building code) | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425; additional fees apply under the Zoning Department (a separate $25.00 Fence Permit Fee is listed under Zoning for fences, with fences 7 feet and above referred to Building Department fees) |
Electrical / Mechanical (HVAC) / Plumbing Permit -- Routed to State of Idaho DOPL
VerifiedPer the City of Blackfoot's own Permits & Applications page, electrical, mechanical (HVAC), and plumbing permit applications within Blackfoot city limits are acquired directly through the State of Idaho Division of Occupational and Professional Licenses (DOPL) Building Safety Program, not through the City Building Department. This entry documents the state-level routing and the itemized City fee tables that appear (per a flagged, unresolved conflict) in the City's own Fee Schedule for these same trades.
Verified 2026-07-04 · Source
Requirements
- Electrical, mechanical (HVAC/gas line), and plumbing permit applications for work in Blackfoot are obtained through the State of Idaho at https://dbs.idaho.gov/permits/, per the City's own published statement
- DOPL administers statewide contractor/tradesperson licensing and, per this routing, permit issuance/plan review/inspection for these three trades within Blackfoot
- CONFLICT: the City of Blackfoot's own Fee Schedule (Resolution No. 425, effective 10/01/2025) separately lists detailed City-charged fee tables for Mechanical Permits (gas lines, HVAC units, residential $80/dwelling unit + $15/HVAC unit, commercial/industrial $80 + percentage of installation cost), Electrical Permits (temporary service $40, residential services $80/dwelling unit + $5/room, commercial/industrial $80 + percentage of cost, motor/generator/welder circuits by horsepower, electric signs), and Plumbing Permits (water/sewer lines $47/inspection, water heaters $47/inspection, residential $80/dwelling unit + $5/fixture, commercial/industrial $40 + percentage of cost) -- confirm directly with the Building & Safety Department at (208) 812-4198 whether the City has since assumed some or all of these trades, whether these fee tables are legacy/unused, or whether some subset of work (e.g., permits issued in conjunction with a City building permit) is still City-administered notwithstanding the general DOPL-routing statement
Required documents
- RequiredState of Idaho DOPL Electrical/Mechanical/Plumbing Permit ApplicationSubmitted directly through the DOPL online permit system at dbs.idaho.gov/permits/
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State of Idaho DOPL Electrical/Mechanical/Plumbing Permit Fees | Not published by the City; see DOPL Building Fees Calculator | Per City of Blackfoot Permits & Applications page routing statement; DOPL fee schedule available at dopl.idaho.gov/bld/bld-building-fees-calculator/ |
| City of Blackfoot Fee Schedule Mechanical/Electrical/Plumbing tables (flagged conflict, not confirmed currently applicable) | See itemized figures in codesAdopted conflict note and localAmendments | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025) -- listed here for completeness given it is a genuine City-published figure, but its applicability is unresolved against the City's own DOPL-routing statement |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Blackfoot building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.