Version history — Blackfoot, Idaho
This is PermitBase’s own verified record for Blackfoot, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Blackfoot’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-20Superseded
- 2026-08-13Superseded
- 2026-08-02Superseded
- Blackfoot, Idaho — Commercial Building Permit (New Complete Building / Shell Building / Addition / Multi-Family 3+ Units) record added
- Blackfoot, Idaho — Commercial Tenant Improvement / Remodel Permit record added
- 2026-07-20Superseded
- Blackfoot, Idaho — EV Charger / EVSE Installation Permit record added
- Blackfoot, Idaho — EV Charger / EVSE Installation Permit fee record added: Existing Residence / Modular, Manufactured or Mobile Home / Detached Shop (EV charger circuit added to an existing dwelling) ($65.00 fee plus $10.00 per additional branch circuit (one circuit included in the $65.00))
- Blackfoot, Idaho — EV Charger / EVSE Installation Permit fee record added: City of Blackfoot Fee Schedule Electrical Permit table (superseded for this scope by the City's own DOPL-routing statement, listed for reference only) (Residential services $80/dwelling unit + $5/room; temporary service $40)
- Blackfoot, Idaho — EV Charger / EVSE Installation Permit fee record removed: State of Idaho DOPL Electrical Permit Fee (EV charger circuit)
- Blackfoot, Idaho — EV Charger / EVSE Installation Permit fee record removed: City of Blackfoot Fee Schedule Electrical Permit table (flagged conflict, not confirmed currently applicable)
- Blackfoot, Idaho — Solar PV Permit record added
- 2026-07-16Superseded
- Blackfoot, Idaho — adopted-codes record updated
- 2026-07-04Initial record — coverage of Blackfoot began