This is PermitBase’s published record for Blackfoot as of 2026-08-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Blackfoot building permits
VerifiedBlackfoot, Idaho — as published 2026-08-20.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition / Remodel)
VerifiedRequired for new single-family dwellings, duplexes, zero-lot-line units, additions, remodels/repairs, and accessory structures over 200 sq ft in Blackfoot, administered by the City of Blackfoot Building & Safety Department against the building/residential code 'current edition as adopted by the state' per Municipal Code 10-2-1, plus city-specific design loads (Seismic Design Category D, 50 psf ground snow load, 30-inch frost depth, 90/105 mph wind).
Verified 2026-07-04 · Source
Requirements
- Building permit required for single-family dwellings, duplexes, zero-lot-line units, remodels/repairs, additions, and accessory structures (sheds) over 200 sq ft
- Plans reviewed against the city/state-adopted IBC/IRC/IECC editions (per Municipal Code 10-2-1's 'current edition as adopted by the state' language) plus City design loads (Seismic Design Category D; 50 psf ground snow load / 35 psf roof snow load; 90/105 mph 3-second-gust wind; 30-inch frost depth; 24-inch ice barrier underlayment)
- Two full sets of plans (minimum 18in x 24in, maximum 24in x 36in, minimum 1/4-inch scale), pages numbered and stapled, plus a digital PDF for plan review
- Site plan showing orientation/north arrow, setbacks, lot dimensions, easements, drainage/grading, and all existing/proposed structures
- Energy Code Compliance: either Option 1 (REScheck Performance Approach compliance report) or Option 2 (Prescriptive Approach: R-38 attic, R-20 exterior walls, R-30 floors or R-13 perimeter walls, .35 U-value Low-E windows), clearly indicated on page 1 of plans
- Wall bracing design compliant with IRC 602.10; engineered shear design required for any wall exceeding 10 feet tall
- Manual S & J HVAC load calculations (including fresh-air calculations) submitted with plans
- Flood Plain Certificate from a licensed engineer required if the property is in a flood plain
- Project value disclosed (used to calculate the building permit fee via the Building Permit Fee Table); project value includes overhead/profit plus finish work, electrical, plumbing, HVAC, and owner-supplied items, excluding land value
- Electrical, plumbing, and mechanical/HVAC work requires separate permit applications acquired through the State of Idaho per the City's own Permits & Applications page (which cites dbs.idaho.gov/permits/ -- as of 2026-07-16 this URL redirects to the DOPL homepage rather than a working permits page; the current live equivalents are dopl.idaho.gov/ele/, dopl.idaho.gov/hvac/, and dopl.idaho.gov/plb/) -- NOT obtained from the City Building Department (see codesAdopted conflict note regarding the City's own Fee Schedule also listing City-charged mechanical/electrical/plumbing fees)
- Apply via the City's online Permit Applications portal or by requesting a paper Residential Building Permit Application from the Building Department
Required documents
- RequiredResidential Building Permit ApplicationCity of Blackfoot Building Department application form; requires project/owner/contractor/plan designer info, project value, square footages by area (first story, second story, basement, garage, carport, covered porch/patio), type of work, flood plain status, zoning info, and energy code compliance option
- RequiredResidential Plan Review ChecklistDesigner-completed checklist covering site plan, foundation/floor framing plan, floor plan/roof framing plan requirements, signed by the plan designer
- RequiredEnergy Code Compliance Documentation (REScheck report or Prescriptive Approach specification)REScheck cover sheet and inspection checklist (Performance Approach), or prescriptive R-value/U-value specification shown on plans (Prescriptive Approach)
- RequiredManual S & J HVAC CalculationsRequired with plans, showing fresh air calculations
- OptionalFlood Plain CertificateRequired from a licensed engineer if the property is within a flood plain
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee -- valuation $0 to $2,000 | $100 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025), Building Permit Fee Table |
| Building Permit Fee -- valuation over $2,000 to $25,000 | $69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $25,000 to $50,000 | $391.75 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $50,000 to $100,000 | $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $100,000 to $500,000 | $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $500,000 to $1,000,000 | $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $1,000,000 to $5,000,000 | $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000, or fraction thereof, to and including $5,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $5,000,000 to $10,000,000 | $20,208.75 for the first $5,000,000 plus $2.75 for each additional $1,000, or fraction thereof, to and including $10,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $10,000,000 | $33,958.75 for the first $10,000,000 plus $2.00 for each additional $1,000, or fraction thereof | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Plan Review Fee -- Residential (single family, duplex, townhomes, mobile/manufactured homes) | 15% of the Building Permit Fee | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Work without a permit | Double the cost of the permit fee | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Re-inspection fee | $47.00 per inspection | City of Blackfoot Fee Schedule, Resolution No. 425; required when more than two visits per item are needed or work is not ready at requested time; must be paid before re-inspection is scheduled |
| Additional plan review | $47.00 per additional review | City of Blackfoot Fee Schedule, Resolution No. 425; applies when changes/additions/revisions are made to an approved plan |
| Permit Re-instatement Fee | Half the cost of the permit fee | City of Blackfoot Fee Schedule, Resolution No. 425; requestable within one year of permit expiration |
| Temporary Certificate of Occupancy | $1,000 refundable fee | City of Blackfoot Residential Building Permit Application; for certain incomplete work under extenuating circumstances |
General Permits (Demolition / Retaining Wall / Mobile Home Block Set / Roof Repair / Fence)
VerifiedFlat-fee general permits issued by the City of Blackfoot Building & Safety Department for demolition, retaining walls, mobile home standard block-set installation, roof repair (truss and/or sheathing only), and fences (when non-exempt from the building code).
Verified 2026-07-04 · Source
Requirements
- Demolition Permit required for building demolitions within city limits
- Retaining Wall Permit required for retaining wall construction
- Mobile Home Standard Block Set Installation Permit required for mobile home block-set installation
- Roof Repair Only permit (truss and/or sheathing work) required for structural roof repair
- Fence Permit required when the fence is non-exempt from the building code (additional Zoning Department fees may apply separately)
- Apply via the City's online Permit Applications portal or the Building Department
Required documents
- RequiredGeneral Permit ApplicationCity of Blackfoot Building Department application appropriate to the specific general permit type (demolition, retaining wall, mobile home block set, roof repair, fence)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025) |
| Retaining Wall Permit | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Mobile Home Standard Block Set Installation Permit | $140.00 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Roof Repair Only (truss and/or sheathing) | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Fence Permit (non-exempt from building code) | $70.00 | City of Blackfoot Fee Schedule, Resolution No. 425; additional fees apply under the Zoning Department (a separate $25.00 Fence Permit Fee is listed under Zoning for fences, with fences 7 feet and above referred to Building Department fees) |
Electrical / Mechanical (HVAC) / Plumbing Permit -- Routed to State of Idaho DOPL
VerifiedPer the City of Blackfoot's own Permits & Applications page, electrical, mechanical (HVAC), and plumbing permit applications within Blackfoot city limits are acquired directly through the State of Idaho Division of Occupational and Professional Licenses (DOPL) Building Safety Program, not through the City Building Department. This entry documents the state-level routing and the itemized City fee tables that the City's own Fee Schedule publishes for these same trades — an unresolved conflict between the two City sources.
Verified 2026-07-16 · Source
Requirements
- Electrical, mechanical (HVAC/gas line), and plumbing permit applications for work in Blackfoot are obtained through the State of Idaho, per the City's own published statement (the City cites https://dbs.idaho.gov/permits/, which redirects to the DOPL homepage rather than a working permits page; the current pages are https://dopl.idaho.gov/ele/, https://dopl.idaho.gov/hvac/, and https://dopl.idaho.gov/plb/, each with a 'Purchase a Permit' link to DOPL's shared online permit tool)
- DOPL administers statewide contractor/tradesperson licensing and, per this routing, permit issuance/plan review/inspection for these three trades within Blackfoot
- CONFLICT: the City of Blackfoot's own Fee Schedule (Resolution No. 425, effective 10/01/2025) separately lists detailed City-charged fee tables for Mechanical Permits (gas lines, HVAC units, residential $80/dwelling unit + $15/HVAC unit, commercial/industrial $80 + percentage of installation cost), Electrical Permits (temporary service $40, residential services $80/dwelling unit + $5/room, commercial/industrial $80 + percentage of cost, motor/generator/welder circuits by horsepower, electric signs), and Plumbing Permits (water/sewer lines $47/inspection, water heaters $47/inspection, residential $80/dwelling unit + $5/fixture, commercial/industrial $40 + percentage of cost) -- confirm directly with the Building & Safety Department at (208) 812-4198 whether the City has since assumed some or all of these trades, whether these fee tables are legacy/unused, or whether some subset of work (e.g., permits issued in conjunction with a City building permit) is still City-administered notwithstanding the general DOPL-routing statement
Required documents
- RequiredState of Idaho DOPL Electrical/Mechanical/Plumbing Permit ApplicationSubmitted directly through DOPL's online permit tool (idaho.maps.arcgis.com/apps/instant/sidebar/index.html?appid=c568d3c03d5f43f0841dcfa9c2a9537e), reached via the 'Purchase a Permit' link on the relevant DOPL trade board page (dopl.idaho.gov/ele/, /hvac/, or /plb/). The formerly-cited dbs.idaho.gov/permits/ URL redirects to the DOPL homepage and is no longer a working entry point.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State of Idaho DOPL Electrical/Mechanical/Plumbing Permit Fees | Not published by the City; see DOPL Building Fees Calculator | Per City of Blackfoot Permits & Applications page routing statement; DOPL fee schedule available at dopl.idaho.gov/bld/bld-building-fees-calculator/ |
| City of Blackfoot Fee Schedule Mechanical/Electrical/Plumbing tables (flagged conflict, not confirmed currently applicable) | See itemized figures in codesAdopted conflict note and localAmendments | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025) -- listed here for completeness given it is a genuine City-published figure, but its applicability is unresolved against the City's own DOPL-routing statement |
EV Charger / EVSE Installation Permit
VerifiedBlackfoot has no separate EV charger/EVSE permit category. The City's own Permits & Applications page states unambiguously: 'All HVAC, Electrical and Plumbing permit applications are acquired through the State of Idaho at https://dbs.idaho.gov/permits/' -- this resolves the routing question in favor of the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City. An EV charging circuit is billed under DOPL's published Electrical Permit Worksheet (Fee Schedule), 'Existing Residence' category, since it is added wiring to an existing dwelling rather than new construction.
Verified 2026-07-20 · Source
Requirements
- A new dedicated circuit or hardwired connection for an EV charging station is electrical work; per the City of Blackfoot's own published routing statement ('acquired through the State of Idaho'), electrical permit applications for work within city limits are obtained through DOPL (purchased online at dbs.idaho.gov), not the City Building Department
- No EV/EVSE-specific permit category or fee line was found published by DOPL
- The City's own Fee Schedule (Resolution No. 425, effective 10/01/2025) separately lists a City-charged Electrical Permit fee table (temporary service $40, residential services $80/dwelling unit + $5/room), but the City's own Permits & Applications page is explicit that electrical permit applications go through the State -- so the DOPL fee schedule is treated as governing here
- DOPL administers statewide electrical contractor/tradesperson licensing regardless of which entity issues the permit itself
Required documents
- RequiredState of Idaho DOPL Electrical Permit Application (Homeowner or Contractor)Purchased online at dbs.idaho.gov/permits (per the City's routing statement); no separate EV-specific application form is published by DOPL or the City
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Existing Residence / Modular, Manufactured or Mobile Home / Detached Shop (EV charger circuit added to an existing dwelling) | $65.00 fee plus $10.00 per additional branch circuit (one circuit included in the $65.00) | State of Idaho DOPL, Electrical Permit Worksheet (Fee Schedule), Revised 8/17/2022 -- attached to the DOPL Homeowner Permit Application… Show full citationHideState of Idaho DOPL, Electrical Permit Worksheet (Fee Schedule), Revised 8/17/2022 -- attached to the DOPL Homeowner Permit Application (dopl.idaho.gov/wp-content/uploads/2023/11/ELE-Home-Owner-Electrical-Permit-Application.pdf); no EV/EVSE-specific fee line found, this is the closest-fit published category for added circuit work on an existing home |
| City of Blackfoot Fee Schedule Electrical Permit table (superseded for this scope by the City's own DOPL-routing statement, listed for reference only) | Residential services $80/dwelling unit + $5/room; temporary service $40 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025) -- the City's own Permits & Applications page states electrical permits go through the State of Idaho, so this City table is not treated as the governing figure for electrical work |
Solar PV Permit
VerifiedBlackfoot issues no separate solar-PV permit type; rooftop or ground-mounted PV is permitted as a City Building Permit (structural/racking, valuation-based fee table, per City Fee Schedule Resolution No. 425) plus an Electrical Permit for the wiring/interconnection portion. Per the City's own Permits & Applications page, electrical permit applications are acquired through the State of Idaho DOPL Building Safety Program rather than the City — though the City's own Fee Schedule separately publishes a City-charged electrical fee table for the same trade, an unresolved conflict noted under the Electrical/Mechanical/Plumbing (state-routed) permit entry.
Verified 2026-07-20 · Source
Requirements
- City Building Permit required for the structural/racking portion, billed under the City's valuation-based Building Permit Fee table (City Fee Schedule, Resolution No. 425, effective 10/01/2025)
- Electrical Permit for PV wiring/interconnection: per the City's own Permits & Applications page, electrical permit applications 'are acquired through the State of Idaho' (DOPL Building Safety Program, https://dopl.idaho.gov/ele/) — but the City's own Fee Schedule (Resolution No. 425) separately lists a City-charged electrical fee table (temporary service $40, residential services $80/dwelling unit + $5/room), an unresolved conflict between the City's stated routing and its own published fee table
- No distinct solar/photovoltaic line item exists in the City Building Permit Fee table or the Electrical Permit fee table published by the City
- Contact the City Building & Safety Department (208-785-8600 opt 3) to confirm which entity (City or State DOPL) actually issues and collects the electrical permit fee for a given project, given the documented conflict
Required documents
- RequiredResidential Building Permit ApplicationFor the structural/racking portion of the solar installation
- RequiredElectrical Permit ApplicationFor PV wiring/interconnection — City's own guidance and fee schedule conflict on whether this is a City or State DOPL permit; confirm before applying
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $0 to $2,000 | $100 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025); no distinct solar/PV line item — billed on this general valuation-based table |
| Building Permit Fee — valuation over $2,000 to $25,000 | $69.25 for the first $2,000 plus $14.00 for each additional $1,000 (or fraction), to $25,000 | City of Blackfoot Fee Schedule, Resolution No. 425 (typical residential rooftop PV valuation range) |
| Electrical Permit — Residential services | $80/dwelling unit plus $5/room | City of Blackfoot Fee Schedule, Resolution No. 425 — City-charged table; conflicts with the City's own statement that electrical permits are obtained through State of Idaho DOPL, not the City |
Commercial Building Permit (New Complete Building / Shell Building / Addition / Multi-Family 3+ Units)
VerifiedRequired for new commercial buildings, shell buildings (with or without interior walls, no occupancy), commercial additions, and multi-family buildings with 3 or more dwelling units, applied for on the City's dedicated Commercial Building Permit Application (distinct from the Residential Building Permit Application) and reviewed against the Commercial/Non-Residential/Multi-Family Plan Review Checklist. Billed on the same valuation-based Building Permit Fee Table as residential, but with a substantially higher Building Plan Review Fee (65% of the Building Permit Fee, versus 15% for residential).
Verified 2026-08-02 · Source
Requirements
- Commercial Building Permit Application required, with 'Type of Permit Requested' checked (Commercial Site Plan-Buildable Lot / New Complete Building / Shell Building-No Interior Walls (no occupancy) / Shell Building-with interior walls (no occupancy)) and 'Land Use' checked (Multi-Family (3+ units) / Addition / Other), distinct from the Residential Building Permit Application form
- Category (per Fee Schedule) includes buildings with three or more dwelling units, businesses, schools, churches, restaurants, etc.
- Project Value disclosed on the application (used to calculate the Building Permit Fee via the Building Permit Fee Table); includes overhead/profit plus finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems, other permanent equipment, and owner-supplied items, excluding land value
- Planning & Zoning Information required on the application: Land Use Zone, Site Drainage Area with calculations, Landscaping Area, Parking Spaces, Warranty Deed, Flood Plain status, Water Tap Size, Sewer Tap Size
- Building Information required: Proposed Use, Occupancy Group(s), Construction Type, Building Height, Total Existing Building Area, Actual New Building Area, Number of Stories
- Fire Information required: site-specific fire-flow and static-pressure letter from the engineering department or other public water provider (fire flow at hydrants; static pressure if fire sprinklers will be installed); disclosure of fire alarm system, fire sprinkler status (and whether sprinklers are used for allowable area increase / story increase / fire-resistive substitution), and any classified (hazardous) areas
- New construction plan submittals require THREE complete sets of construction plans (including civil plans), with a minimum of two original wet-stamped sets, per the Commercial/Non-Residential/Multi-Family Plan Review Checklist
- Checklist items (as applicable to project scope): Code Analysis, ComCheck Energy Analysis (Idaho-licensed architect/engineer), Architectural Site Plan, Civil Site Plan (licensed engineer/architect, new construction; may be required for additions), Foundation Plan, Floor Plan, Elevations, Building Sections and Details, Structural Plans and Structural Engineering Calculations (2 stamped sets), Electrical/Mechanical/Plumbing Plans, MSDS sheets (2 copies, if hazardous materials present), Fire Department Requirements, statement of special inspections per IBC 1705
- Health District approval letter required prior to permit issuance for any building where food is prepared
- Electrical, plumbing, and mechanical/HVAC work billed separately under the Fee Schedule's Commercial & Industrial tables ($80 + percentage of installation cost for mechanical and electrical; $40 + percentage of installation cost for plumbing) -- subject to the same unresolved City-vs-DOPL routing conflict noted under the Electrical/Mechanical/Plumbing (state-routed) permit entry; confirm with the Building & Safety Department which entity actually issues these for a given commercial project
- Apply via the City's online Permit Applications portal (blackfootid.portal.opengov.com) or by submitting the paper Commercial Building Permit Application to the Building Department
Required documents
- RequiredCommercial Building Permit ApplicationCity of Blackfoot Building Department application form distinct from the Residential Building Permit Application; requires project/owner/contractor/architect/engineer info, type of permit requested, project value, planning & zoning info, building info, and fire info
- RequiredCommercial/Non-Residential/Multi-Family Plan Review ChecklistDesign-professional-completed checklist of construction-plan and civil-plan requirements for new construction and additions (Code Analysis, ComCheck, Architectural Site Plan, Foundation/Floor/Structural Plans, Electrical/Mechanical/Plumbing Plans, Civil Site Plan, Storm Drainage Calculations, etc.), signed by the design professional in responsible charge
- RequiredStructural Engineering Calculations2 stamped/signed sets from an Idaho Registered Engineer or Architect, required for all new construction and additions
- RequiredFire Flow / Static Pressure LetterSite-specific letter from the engineering department or other public water provider stating fire flow at hydrants, including static pressure if fire sprinklers will be installed
- OptionalHealth District Approval LetterRequired prior to permit issuance for any building where food is being prepared
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee -- valuation $0 to $2,000 | $100 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025), Building Permit Fee Table -- same valuation-based table used for residential and commercial |
| Building Permit Fee -- valuation over $2,000 to $25,000 | $69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $25,000 to $50,000 | $391.75 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $50,000 to $100,000 | $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $100,000 to $500,000 | $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $500,000 to $1,000,000 | $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $1,000,000 to $5,000,000 | $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000, or fraction thereof, to and including $5,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $5,000,000 to $10,000,000 | $20,208.75 for the first $5,000,000 plus $2.75 for each additional $1,000, or fraction thereof, to and including $10,000,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $10,000,000 | $33,958.75 for the first $10,000,000 plus $2.00 for each additional $1,000, or fraction thereof | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Plan Review Fee -- Commercial (buildings with 3+ dwelling units; businesses; schools; churches; restaurants; etc.) | 65% of the Building Permit Fee | City of Blackfoot Fee Schedule, Resolution No. Show full citationHideCity of Blackfoot Fee Schedule, Resolution No. 425 -- more than 4x the 15% residential Plan Review Fee rate; when more than one identical commercial building is on the same parcel and submitted together as a commercial development, only one plan review fee is required for the group of identical buildings |
| Fire Department Construction Plan Review and Inspection | $100.00 | City of Blackfoot Fee Schedule, Resolution No. 425, Fire Prevention Construction Permits -- for new installations, buildings, and structures regulated under the International Fire Code |
| Fire Department Site Plan Review -- Commercial | $30.00 | City of Blackfoot Fee Schedule, Resolution No. 425, Fire Prevention Construction Permits (Site Plan Review, Commercial tier) |
| Fire Department Sprinkler System Plan Review and Inspection | $150.00 + $2.00 per head | City of Blackfoot Fee Schedule, Resolution No. 425, Fire Prevention Construction Permits, Life Safety Systems |
| Fire Department Fire Alarm System Plan Review and Inspection | $100.00 + $3.00 per device | City of Blackfoot Fee Schedule, Resolution No. 425, Fire Prevention Construction Permits, Life Safety Systems |
| Fire Department Kitchen Hood Suppression System Plan Review and Inspection | $50.00 | City of Blackfoot Fee Schedule, Resolution No. 425, Fire Prevention Construction Permits, Life Safety Systems |
| Work without a permit | Double the cost of the permit fee | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Re-inspection fee | $47.00 per inspection | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Additional plan review | $47.00 per additional review | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Permit Re-instatement Fee | Half the cost of the permit fee | City of Blackfoot Fee Schedule, Resolution No. 425; requestable within one year of permit expiration |
Commercial Tenant Improvement / Remodel Permit
VerifiedCovers interior build-out or renovation of existing commercial space -- filed on the same Commercial Building Permit Application used for new commercial construction, but with 'Tenant Improvement in Shell Building' or 'Remodel' checked as the Type of Permit/Land Use instead of 'New Complete Building.' Billed on the same valuation-based Building Permit Fee Table plus the 65% Commercial Plan Review Fee (no separate TI-specific fee line item is published), but reviewed to a materially faster published timeline than new commercial construction.
Verified 2026-08-02 · Source
Requirements
- Filed on the Commercial Building Permit Application with 'Tenant Improvement in Shell Building' (build-out of a previously-permitted, unoccupied shell space) or 'Remodel' (renovation of existing, previously-occupied commercial space) checked under Type of Permit Requested / Land Use -- both options appear as separate checkboxes on the same form and are grouped together under the same published review-timeline estimate
- Building Information section requires 'Tenant Improvement Area' and 'Total Existing Building Area' fields to be completed in addition to the fields used for new construction
- Floor Plan must show the ENTIRE building, not just the tenant/remodel space, and must indicate the existing occupancies of tenant spaces in contact with the new tenant improvement or remodel area, per the Commercial/Non-Residential/Multi-Family Plan Review Checklist
- ComCheck Energy Analysis required on a remodel 'when changing fixtures,' prepared by an Idaho-licensed architect or engineer
- Structural Engineering Calculations (2 stamped sets) required for any 'structural improvement/remodels/retrofits within existing buildings,' per the Plan Review Checklist
- Accessibility: 'For remodeling and tenant improvements, the area of improvement shall comply with the access requirement for new construction. An accessible route of travel will be required to the remodeled/improved area,' per current IBC / ANSI A117.1
- Health District approval letter required prior to permit issuance if the tenant space involves food preparation
- Project Value disclosed (same definition as new construction: total construction value including overhead/profit, finish work, and all trades, excluding land value) used to calculate the Building Permit Fee on the same valuation-based table
- No distinct TI/remodel fee line item exists in the Fee Schedule -- billed on the same Building Permit Fee Table plus 65% Commercial Plan Review Fee as new commercial construction
- Apply via the City's online Permit Applications portal (blackfootid.portal.opengov.com) or by submitting the paper Commercial Building Permit Application to the Building Department
Required documents
- RequiredCommercial Building Permit ApplicationSame form used for new commercial construction, with 'Tenant Improvement in Shell Building' or 'Remodel' checked; Building Information section requires Tenant Improvement Area and Total Existing Building Area
- RequiredCommercial/Non-Residential/Multi-Family Plan Review ChecklistApplicable sections only (e.g., floor plan of entire building showing existing occupancies, ComCheck if changing fixtures, structural calculations if structural work is involved); civil site plan generally not required unless the project also involves site work
- OptionalComCheck Energy AnalysisRequired when the remodel changes fixtures; prepared by an Idaho-licensed architect or engineer
- OptionalStructural Engineering Calculations2 stamped/signed sets from an Idaho Registered Engineer or Architect, required for structural improvements/remodels/retrofits within the existing building
- OptionalHealth District Approval LetterRequired prior to permit issuance if the tenant space involves food preparation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee -- valuation $0 to $2,000 | $100 | City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025), Building Permit Fee Table -- same table used for new commercial construction and TI/remodel work; no distinct TI fee line item is published |
| Building Permit Fee -- valuation over $2,000 to $25,000 | $69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000 | City of Blackfoot Fee Schedule, Resolution No. 425 (typical range for smaller tenant improvements) |
| Building Permit Fee -- valuation over $25,000 to $50,000 | $391.75 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $50,000 to $100,000 | $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $100,000 to $500,000 | $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Building Permit Fee -- valuation over $500,000 | See Building Permit Fee Table (higher tiers continue through $10,000,000+); full table in the commercial-building-permit entry | City of Blackfoot Fee Schedule, Resolution No. 425 -- large TI/remodel projects (e.g., big-box or grocery renovations) can reach these tiers |
| Building Plan Review Fee -- Commercial (buildings with 3+ dwelling units; businesses; schools; churches; restaurants; etc.) | 65% of the Building Permit Fee | City of Blackfoot Fee Schedule, Resolution No. 425 -- applies to TI/remodel projects the same as new commercial construction; no reduced TI plan-review rate is published |
| Work without a permit | Double the cost of the permit fee | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Re-inspection fee | $47.00 per inspection | City of Blackfoot Fee Schedule, Resolution No. 425 |
| Additional plan review | $47.00 per additional review | City of Blackfoot Fee Schedule, Resolution No. 425 |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Blackfoot building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.