This is PermitBase’s published record for Greenleaf as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Greenleaf building permits
VerifiedGreenleaf, Idaho — as published 2026-07-07.
Verified 2026-07-13 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition / Alteration)
VerifiedRequired for erecting, constructing, enlarging, altering, repairing, improving, removing, converting, or demolishing any building or structure within Greenleaf city limits, including new single-family homes, additions, and alterations. Reviewed and issued by the city's contracted Building Official (Idaho Building Inspection Services, Inc.) under Greenleaf City Code Title 8, Chapter 1.
Verified 2026-07-13 · Source
Requirements
- Building permit required before any erection, construction, enlargement, alteration, repair, improvement, removal, conversion, or demolition of a building or structure (Greenleaf City Code 8-1-2(A))
- Plans must comply with the 2018 IBC and 2018 IRC as adopted/amended by the State of Idaho (Greenleaf City Code 8-1-1)
- Application must be submitted with an electronic set of building plans including the site plan, OR three sets of paper plans with one set on 11 x 17 (tabloid) paper for scanning/filing
- Re-roofing, window replacement, and siding replacement also require a building permit
- Electrical, plumbing, and HVAC/mechanical work requires separate permits obtained directly through Idaho DOPL (dbs.idaho.gov / dopl.idaho.gov), not the city
Required documents
- RequiredBuilding Permit Application FormAvailable from Greenleaf City Hall (20523 N. Whittier Dr.); not posted as a fillable PDF on the city website as of last verification — obtain in person or by contacting City Hall
- RequiredConstruction Drawings / Site PlanElectronic plan set including site plan, OR three paper plan sets with one set on 11x17 (tabloid) paper for city scanning/filing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Application Fee | $50.00 flat, due upon submission of all building permit applications | Credited/deducted from the total building permit fee once valuation and fees are calculated by the Building Official — City of Greenleaf Consolidated Fee Schedule, Resolution #223 'Exhibit A' (adopted 09/02/2025, effective 10/01/2025), 'Building Permit Fees' section |
| Building Permit — Valuation Fee | Set by the Building Official using the most current ICC Building Valuation Data (BVD) as a guide; example BVD table attached to the fee schedule (Feb 2025 ICC BVD) shows Group R-3 one- and two-family residential at $215.90/sq ft (Type IA) down to $169.09/sq ft (Type VB) — actual permit fee = building valuation run through the city's Permit Fee Multiplier formula (Bldg. Dept. Budget % ÷ Total Annual Construction Value) | City of Greenleaf Consolidated Fee Schedule, Resolution #223 'Exhibit A', p. Show full citationHideCity of Greenleaf Consolidated Fee Schedule, Resolution #223 'Exhibit A', p. 17-19 of 24: 'Valuation shall be set by the Building Official, who may use the most current building valuation data from the International Code Council, as deemed applicable. The building valuation data on following pages is given as an example only.' No flat-dollar table is published; the ICC BVD + multiplier method is the city's official, adopted mechanism for calculating the fee — this is not an unresolved fee, it is a formula-based fee set by resolution |
| Plan Review Fee | 65% of the building permit fee; reduced to 30% for Group R-3 (one- and two-family dwelling) plan reviews on structures with less than 2,500 sq ft of habitable space (finished or unfinished) | Resolution #223 'Exhibit A', 'Building Permit Fees' section |
| RESCheck energy code plan review fee (not applicable to all permits) | $150.00 | — |
| Additional Plan Review Fee (beyond initial plan review) | $75.00 | — |
| Additional Inspection Fee (re-inspections) | $100.00 | — |
| Additional Building Official time spent on project | $150.00/hour | — |
| Penalty for building without a permit | Double the cost of all applicable building permit fees | — |
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fee schedules
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Greenleaf building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.