This is PermitBase’s published record for Melba as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Melba building permits

Melba, Idaho — as published 2026-07-07.

Reviewed 2026-07-08 · Source

Codes adopted

2018 International Building Code (IBC), with Idaho amendments — Melba City Code §9-2-1 adopts "the International Building Code" by reference and binds the Building Department to it and State laws pertaining to buildings; Idaho Code §39-4116 requires local building-permit-issuing jurisdictions to enforce the edition currently adopted by the Idaho Building Code Board, which is the 2018 IBC (per DOPL's 2025 Updated Idaho Adopted Codes notice)2018 International Residential Code (IRC), Parts I, II, III, and IX — Idaho Residential Code (2020 Edition amendments), statewide baseline applicable in Melba absent a more specific local amendment2018 International Energy Conservation Code (IECC) — Idaho Energy Conservation Code (2020 Edition amendments)2018 International Existing Building Code (IEBC)2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) — statewide baseline; Melba additionally requires its own separate Mechanical Permit (with published flat fees) per city practice2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code)2023 National Electrical Code (NEC), with Idaho amendmentsMelba City Code Title 9, Chapter 2 ("General Building Regulations"), §9-2-1 (Building Permits and Fees) and §9-2-2 (Fences)

Permit types & fees

Residential Building Permit (New Dwelling / Addition / Remodel)

Required for new single-family dwellings, residential additions/remodels, and detached structures within Melba city limits. Issued by the City of Melba's own Building Department under Melba City Code §9-2-1; the City contracts with outside inspection professionals to perform plan review and inspections, but the permit and its legal authority are the City's, not Canyon County's.

Reviewed 2026-07-08 · Source

Requirements

  • Building permit required before starting construction, per Melba City Code §9-2-1(A)
  • Two (2) plot plans drawn to scale showing proposed work
  • Two (2) complete sets of plans and specifications (one set is returned to applicant)
  • A copy of the full legal description (recorded) or Subdivision, Lot & Block of property
  • Contractor Registration Number required on the application
  • Zoning classification must be identified on the application
  • Mechanical permits are required separately through the City of Melba, with a copy of the Manual J calculation kept on site

Required documents

  • RequiredMelba Building Permit ApplicationCity of Melba's own building permit application form, capturing applicant/builder/owner information, zoning classification, project type (new dwelling, new commercial, residential/commercial addition or remodel, detached structure), site address, square footage breakdown, and project value
  • RequiredPlot Plans (2 copies, drawn to scale)
  • RequiredConstruction Plans and Specifications (2 complete sets)
  • RequiredLegal Description or Subdivision/Lot/Block Documentation

Fee schedule

Fee typeAmountNotes
Building Permit FeeUnpublished — the Building Permit Application itself leaves the "Permit Fee" line blank/hand-filled, and Melba City Code §9-2-1(B) states the fee schedule is on file with the City as Exhibit A. This Exhibit A fee schedule is not published on the City's website, its linked Google Drive document library, Municode/AmLegal codification, or in Wayback Machine snapshots of cityofmelba.org checked as of this verification.Confidence for this fee line is intentionally NOT verified — see confidence field below. Contact City Hall at (208) 495-2722 for the current Exhibit A valuation table.
Plan Review FeeUnpublished — same as Building Permit Fee; line is blank on the City's own application formNot found in any published source as of verification
Water Hookup Fee$1,800.00Published directly on the City of Melba Building Permit Application form (fixed amount, not valuation-based)
Sewer Hookup Fee$4,500.00Published directly on the City of Melba Building Permit Application form (fixed amount, not valuation-based)

Mechanical Permit (New Residential / Retro-Residential / Commercial)

Verified

Required through the City of Melba for HVAC, gas piping, fireplace/stove, and related mechanical work, separate from the general building permit. Melba publishes fixed and percentage-based fees directly on its own mechanical permit application forms.

Verified 2026-07-08 · Source

Requirements

  • Required for new dwelling HVAC systems, additions/remodels/shops, additional HVAC systems, radiant floor heat, pool heaters, heat pumps/AC for manufactured homes, gas piping (underground and house), fireplaces/stoves (wood/pellet/gas), and venting-only installations
  • For commercial mechanical work: new or retrofit application, with permit fee calculated as 2% of the commercial bid price (minimum fee $60.00)
  • Payment (cash, check, or money order) due at time of submittal
  • It is the duty of the Contractor or Owner to notify the City when the project is ready for inspection
  • Permits are issued subject to the Building, Mechanical, and Zoning Codes of Melba City, Idaho; commercial permits expire in 180 days if work is not started or is abandoned

Required documents

  • RequiredNew Residential Construction Mechanical Permit ApplicationCity of Melba form (revised 12/23/2020) itemizing new dwelling ($150 flat), new addition/remodel/shop ($60 flat), and per-unit fees for additional HVAC systems, radiant floor heat, pool heaters, heat pumps, gas piping, fireplaces, and stoves
  • RequiredCommercial Mechanical Permit ApplicationCity of Melba form (revised 12/23/2020) for new or retro commercial mechanical work; fee is 2% of commercial bid price, $60 minimum
  • RequiredRetro-Residential Mechanical Permit ApplicationCity of Melba form for mechanical work in existing residential structures

Fee schedule

Fee typeAmountNotes
New Dwelling (residential mechanical, does not include fireplaces/stoves or gas piping)$150.00City of Melba New Residential Construction Mechanical Permit Application, revised 12/23/2020
New Addition / Remodel / Shop (residential mechanical, does not include fireplaces/stoves or gas piping)$60.00
Any additional HVAC system$75.00 each
Radiant floor heat$60.00 each
Pool heater (gas only)$40.00 each
New heat pump / air conditioner for manufactured home$40.00 each
Gas piping — underground$60.00 each
Gas piping — house piping$60.00 each
Fireplace (wood / pellet / gas)$40.00 each
Stove (wood / pellet / gas)$40.00 each
Venting only for fireplace/stove$40.00 each
Commercial Mechanical Permit (new or retrofit)2% of commercial bid price, minimum fee $60.00City of Melba Commercial Mechanical Permit Application, revised 12/23/2020

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Melba building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-20) →View current record →All versions →

Permalink: /idaho/canyon-county/melba/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: acdf846

Reproducible from PermitBase’s version-controlled dataset, commit acdf846.