Skip to main content
PermitBase

Melba building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Melba, Idaho.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
401 Carrie Rex Ave, PO Box 209, Melba, ID 83641
Phone
(208) 495-2722
Office hours
Monday – Friday 8:00 AM – 12:00 Noon and 1:00 PM – 3:00 PM

Inspection guide

See how inspections work in Melba — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC), with Idaho amendments — Melba City Code §9-2-1 adopts "the International Building Code" by reference and binds the Building Department to it and State laws pertaining to buildings; Idaho Code §39-4116 requires local building-permit-issuing jurisdictions to enforce the edition currently adopted by the Idaho Building Code Board, which is the 2018 IBC (per DOPL's 2025 Updated Idaho Adopted Codes notice)
  • 2018 International Residential Code (IRC), Parts I, II, III, and IX — Idaho Residential Code (2020 Edition amendments), statewide baseline applicable in Melba absent a more specific local amendment
  • 2018 International Energy Conservation Code (IECC) — Idaho Energy Conservation Code (2020 Edition amendments)
  • 2018 International Existing Building Code (IEBC)
  • 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) — statewide baseline; Melba additionally requires its own separate Mechanical Permit (with published flat fees) per city practice
  • 2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code)
  • 2023 National Electrical Code (NEC), with Idaho amendments
  • Melba City Code Title 9, Chapter 2 ("General Building Regulations"), §9-2-1 (Building Permits and Fees) and §9-2-2 (Fences)

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
3units

3 buildings · $1.3M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • Melba is an independent, self-administering building-permit jurisdiction under Melba City Code Title 9, Chapter 2 — it is NOT served by Canyon County's Development Services Department. Do not route Melba permit questions to Canyon County.
  • The City contracts with outside planning, engineering, and building inspection professionals to perform the actual review/inspection work, but the permit authority, fee collection, and code enforcement remain the City's own.
  • The building-permit valuation fee schedule (Exhibit A to the ordinance) is on file with the City but is not published anywhere online as of this verification — budget conservatively and call City Hall for a quote before committing to a project timeline.
  • Mechanical permits are billed separately from building permits, with published flat and percentage fees current as of the forms' 12/23/2020 revision.
  • Water hookup ($1,800) and sewer hookup ($4,500) are large, fixed line items on top of the building permit fee — factor these into project budgets early.
  • All inspections happen after 5:00 PM or on weekends and require 24-48 hours notice — plan scheduling accordingly, this is unusual compared to typical 8-5 weekday inspection windows.
  • Fences: pallets are specifically prohibited as fence material; electric fences require Melba City Council approval in advance.

Related guides

Comparable nearby cities

Nampa
Both in Canyon County4 shared permit typesBoth on the 2018 International Existing Building Code (IEBC)~15 mi away
Compare fees →
Caldwell
Both in Canyon County4 shared permit typesBoth on the 2018 International Existing Building Code (IEBC)~20 mi away
Compare fees →
Middleton
Both in Canyon County4 shared permit typesBoth on the 2018 International Existing Building Code (IEBC)~24 mi away
Compare fees →