Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Cascade, Idaho.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
105 South Main Street, Cascade, ID 83611
Phone
(208) 382-4279
Office hours
Mon–Fri 8:30 AM – 4:30 PM (per City of Cascade March 2023 newsletter; not independently republished elsewhere on the city site as of verification date)

Inspection guide

See how inspections work in Cascade — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC)
  • 2018 International Residential Code (IRC)
  • 2018 International Energy Conservation Code (IECC) — 2018 REScheck Energy Certificate required with submittal

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
34units

17 buildings · $6M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • The City of Cascade runs its own independent Building Department — it is NOT covered by the Valley County Building Department, which explicitly excludes the cities of Cascade, McCall, and Donnelly and serves only unincorporated Valley County. Don't confuse the two when researching permit rules or fees.
  • Electrical, plumbing, and HVAC/mechanical work in Cascade is inspected and signed off by the State of Idaho (DOPL), not the City — the City Building Inspector performs the structural/building inspections (footing, foundation, framing, insulation, final) and requires the State sign-off on those trades before conducting the final building inspection.
  • Roof design snow load is 100 PSF (live load) — higher than many lower-elevation Idaho cities — reflecting Cascade's mountain/lake climate.
  • Frost depth is 24 inches minimum — footings must extend below this depth.
  • A Fire District Impact Fee of $2,891 (residential) or $1.16/sq ft (non-residential) is collected by the City on behalf of the Cascade Rural Fire Protection District as part of the new-construction building permit process.
  • 24-hour advance notice is required to schedule any inspection with the City Building Inspector.
  • The permit card must be posted visibly from the road, and house numbers must be posted visibly from the road (including for new construction), prior to any inspection.
  • A job copy of approved plans must be kept on site at all times and available to the inspector.
  • The City's published Schedule of Fees (FY2022-2023) does not itself reprint the base building-permit valuation fee table — it only lists fees additional to that base fee (plan review percentage, impact fees, flat fees for specific permit types). Confirm the base valuation-based fee directly with the Building Inspector.
  • No plan-review or permit-issuance turnaround time is published anywhere on the City's official site — call the Building Inspector at 208.382.4279 for a current estimate before planning a project timeline.

Related guides

Comparable nearby cities

Donnelly
Both in Valley County3 shared permit typesBoth on the 2018 International Residential Code (IRC)~16 mi away
Compare fees →
McCall
Both in Valley County3 shared permit typesBoth on the 2018 International Building Code (IBC)~28 mi away
Compare fees →
Unincorporated Valley County
Both in Valley County5 shared permit types
Compare fees →