Burley building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Burley, Idaho.

Last verified 2026-07-04 · Source · Embed this page’s badge · Version history

Building department

Address
2020 Park Avenue, Burley, ID 83318
Phone
(208) 647-7086
Email
Office hours
Not published on the City of Burley Building Department page. Contact by phone at (208) 647-7086. Direct inspector lines: Building Inspector Gary (208) 431-5425, Plumbing Inspector Mark (208) 650-1258, Electrical Inspector Floyd (208) 650-1098, HVAC Inspector Gary (208) 431-5425 (per City of Burley Building Permit / Electrical Permit / Plumbing Permit / HVAC Permit application headers). Chief Building Official: Gary Pawson; Department Secretary: Melissa Lee.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • Idaho Building Code Act (Idaho Code Title 39, Chapter 41) makes building code standards a matter of statewide concern; local governments that issue building permits and perform code enforcement must adopt the International Building Code and Idaho Residential Code (Parts I-III and IX) and the Idaho Energy Conservation Code as amended by the Idaho Building Code Board through negotiated rulemaking, and may not adopt subsequent IRC/IECC residential provisions not yet adopted by the Board. Source: Idaho Legislature, Idaho Code Title 39 Chapter 41 (39-4116, Local Government Adoption and Enforcement of Building Codes), https://legislature.idaho.gov/statutesrules/idstat/title39/t39ch41/
  • IMPORTANT DISCREPANCY -- as codified in AMLegal, City of Burley Municipal Code Title 4, Chapter 1 (Building Code) has NOT been updated to reflect Idaho's current statewide-mandated IBC/IRC/IECC edition cycle: Section 4-1-1 'Adoption of Uniform Building Code' still adopts the Uniform Building Code, 1997 Edition (published by the International Conference of Building Officials), per Ordinance 1106, passed 8-3-1998 -- this predates the 2019 Idaho Building Code Act's IBC/IRC mandate. Section 4-1-2 'Adoption of Northwest Energy Code' adopts the Northwest Energy Code, 1987 Edition (Model Conservation Standards, published by the Bonneville Power Administration), per Ordinance 1017, passed 1-18-1988. Chapter 1 of Title 4 contains only these two sections (verified: orig_doc_toc_ct = 3 total items including the chapter header, i.e. only 2 substantive sections) -- no separately codified IRC, IECC, or updated IBC adoption ordinance was found in Chapter 1 as currently published (code current through Ord. 1432, passed 9-2-2025). Source: City of Burley Municipal Code 4-1-1 and 4-1-2, https://codelibrary.amlegal.com/codes/burleyid/latest/burley_id/0-0-0-1981 and https://codelibrary.amlegal.com/codes/burleyid/latest/burley_id/0-0-0-1987
  • Because Idaho Code Title 39 Chapter 41 legally supersedes any conflicting local ordinance for jurisdictions that administer their own permitting (as Burley does), the City of Burley Building Department is legally required to enforce the statewide-mandated 2018 IBC, 2018 IRC (Parts I-III and IX), and Idaho Energy Conservation Code with Idaho Building Code Board amendments in practice, notwithstanding the outdated municipal code text -- however, this file does NOT assert specific IBC/IRC/IECC edition-year local amendments (wind speed, snow load, seismic design category, frost depth, soil bearing) for Burley because no Burley-specific design-criteria page or ordinance stating those values was found (unlike Twin Falls' published Design Criteria pages). Confirm current enforced edition and any local design-criteria amendments directly with the Chief Building Official at (208) 647-7086 before relying on this field for design work.
  • City of Burley Municipal Code Title 4, Chapter 5 (Electrical Code; Electrical Installations) requires an electrical permit for all wiring/apparatus/fixture installation, alteration, or addition, issued by the Superintendent of Light and Power (now administered via the Building Department's Electrical Inspector); Section 4-5-7 states electrical inspection fees are established by resolution of the Burley City Council (not fixed in the ordinance text itself) -- current fees are published on the City's Electrical Permit Worksheet (Fee Schedule) form. Source: City of Burley Municipal Code 4-5-5 (Permit Required; Application, Issuance) and 4-5-7 (Electrical Inspection Fees), https://codelibrary.amlegal.com/codes/burleyid/latest/burley_id/0-0-0-2234 and https://codelibrary.amlegal.com/codes/burleyid/latest/burley_id/0-0-0-2242
  • The City of Burley Building Department (not the Idaho Division of Occupational and Professional Licensing, DOPL) issues and inspects electrical, plumbing, and HVAC/mechanical permits directly within city limits -- confirmed by the City's own dedicated Electrical Permit, Plumbing Permit, and HVAC Permit application/fee-worksheet forms (each listing a named City inspector and City-set fee schedule) and by Idaho DOPL's own Permits and Inspections page noting that 'the legislature has authorized several cities and counties to assume jurisdiction' for these trades, with jurisdiction 'varying widely' by locality. This is the same self-administered model as the City of Twin Falls, and differs from the City of Jerome model where DOPL administers those three trades. Source: City of Burley Electrical/Plumbing/HVAC Permit Worksheets (Fee Schedules), https://burleyidaho.org/DocumentCenter/View/506/Electrical-Permit-, https://burleyidaho.org/DocumentCenter/View/548/Plumbing-Permit-, https://burleyidaho.org/DocumentCenter/View/507/HVAC-Permit-; cross-checked against DOPL Permits and Inspections page, https://dopl.idaho.gov/plb/plb-permits-and-inspections/
  • The City of Burley Building Department (this file, serving property within Burley city limits) is a distinct permitting authority from the Cassia County Building & Zoning Department, which serves unincorporated Cassia County -- confirmed as physically co-located in Burley (Cassia County Courthouse, 1459 Overland Ave., Room 210, Burley, ID 83318; phone 208-878-7302; email bldgdept@cassia.gov) but operating a separate permit application, fee schedule, and jurisdiction from the City. Source: Cassia County Zoning and Building Contact page, https://www.cassia.gov/building-zoning-contact, cross-checked against City of Burley Building Department page, https://burleyidaho.org/157/Building-Department-Planning-Zoning

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date
No data reported
Latest full year
No data reported

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • The City of Burley Building Department (this file) is a distinct permitting authority from the Cassia County Building & Zoning Department, which serves unincorporated Cassia County from an office also physically located in Burley (Cassia County Courthouse, 1459 Overland Ave., Room 210) but under a completely separate application, fee schedule, and jurisdiction -- confirm which jurisdiction applies to a given parcel (inside vs. outside Burley city limits) before applying.
  • Burley's own codified Municipal Code (Title 4, Chapter 1) has NOT been updated to the current Idaho-mandated IBC/IRC/IECC cycle -- it still shows a 1997 Uniform Building Code adoption (Ord. 1106, 1998) and a 1987 Northwest Energy Code adoption (Ord. 1017, 1988) as of the code version current through Ord. 1432 (9-2-2025). Idaho Code Title 39 Chapter 41 legally requires current statewide-mandated codes to be enforced regardless of un-updated local ordinance text; confirm the actual code edition currently enforced in practice directly with the Chief Building Official.
  • Unlike Twin Falls and Jerome, no valuation-based Building Permit fee table is published by the City of Burley -- the Building Permit Application form leaves the fee blank for staff to calculate. Electrical, plumbing, and HVAC trade permits, by contrast, DO have detailed, printed fee worksheets with identical tier structures across all three trades (scaled by living-space square footage for residential, and by job value for commercial/industrial).
  • The City of Burley (like Twin Falls, and unlike Jerome) self-administers electrical, plumbing, and HVAC/mechanical permits directly -- these are NOT routed through Idaho DOPL.
  • Burley Electric (municipal electric utility) requires a ringless meter base and outside disconnect on all electrical permit work, printed directly on the Contractor Permit application form.
  • No plan review or permit-turnaround timeline (in business days) is published anywhere on the City of Burley's Building Department page or permit application forms for any of the four permit types in this file -- unlike Twin Falls (10 business days) or Jerome (5-30 business days, varying by permit type). Contact the Building Department at (208) 647-7086 directly for current turnaround expectations.
  • Applications may be submitted on paper directly to the Building Department (2020 Park Avenue) or online via the City's iWorQ citizen portal (burley.portal.iworq.net).

Comparable nearby cities

Twin Falls
6 shared permit typesBoth on the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) makes building code standards a matter of statewide concern...~34 mi away
Compare fees →
Unincorporated Cassia County
Both in Cassia County3 shared permit types
Compare fees →
Heyburn
3 shared permit types~2 mi away
Compare fees →