Unincorporated Cassia County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Cassia County, Idaho.

Last verified 2026-08-02 · Source · Embed this page’s badge · Version history

Building department

Address
Cassia County Courthouse, 1459 Overland Ave., Room 210, Burley, ID 83318
Phone
208-878-7302
Office hours
Mon–Fri 8:30 AM – 5:00 PM

Inspection guide

See how inspections work in Unincorporated Cassia County — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC), including appendices E, G, H, and I — adopted via Cassia County Code Title 11, Chapter 1 (11-1-1), effective January 1, 2021
  • 2018 International Residential Code (IRC), including parts I–IV and IX, and appendices H, J, Q, and S — adopted via Title 11, Chapter 1
  • 2018 International Existing Building Code (IEBC) — adopted via Title 11, Chapter 1
  • 2018 International Energy Conservation Code (IECC) — adopted via Title 11, Chapter 1
  • 2018 International Fire Code (IFC) — adopted via Title 11, Chapter 1
  • Idaho Manufactured Home Installation Current Standard — adopted via Title 11, Chapter 1
  • 1997 Uniform Code for Abatement of Dangerous Buildings — adopted via Title 11, Chapter 1

Permit types & fees

Unincorporated Cassia County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated Cassia County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated Cassia County lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
21units

15 buildings · $3.9M valuation

Trailing 12 months
115units

12 of 12 months reported · #37 in Idaho coverage by units

Year to date (2026 YTD through 2026-07)
72units

66 buildings · $21.8M valuation

Full year 2025
112units

98 buildings · $36.2M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities (Burley, Albion, Declo, Malta, Oakley); county file row: 'Cassia County' (co2605c.txt, 16/031)

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • Electrical, plumbing, and HVAC/mechanical permits are NOT issued by Cassia County — they are issued by the Idaho Division of Occupational and Professional Licenses (DOPL) at dopl.idaho.gov/permits, phone 1-800-955-3044 (permits/inspections) or 1-208-332-4700. County rough framing inspection cannot be scheduled until DOPL's electrical, plumbing, and HVAC rough inspections are complete (IRC R109.4).
  • Building permit fees are valuation-based, calculated on square footage against the IBC 2003 Valuation Table 1 — not a flat fee. A non-refundable plan review fee ($200 residential / $500 commercial) is collected up front and credited toward the total permit fee.
  • Minimum lot size for any residence in unincorporated Cassia County is one (1) acre (County Code 9-4-2); land cannot be divided into five or more lots without subdivision approval.
  • Standard setbacks: 54 feet from road centerline; 15 feet from interior lot lines for houses/attachments; 10 feet from interior lot lines for accessory buildings.
  • Agricultural buildings used strictly for farm equipment, crop/product storage, or livestock shelter are exempt from the IBC/IRC but still require a separate $75 Agricultural Building Siting Permit for setback/easement compliance (County Code 9-5-3 B).
  • ADUs require an extra step beyond a standard building permit: a Declaration of Restrictions must be recorded with the County Recorder before the permit is issued, and the ADU cannot exceed 1,000 sq ft or have independent utility service.
  • Building without a required permit or inspection triggers a 100% penalty on top of the standard fee (County Code 11-1-6/11-1-8).
  • Permits become null and void if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days.
  • For inspections, call Building Official Matt Sagers (208-312-9442) or Building Inspector Ernie Juarez (208-312-7302) — at least six business hours' advance notice required. A $30/hour (1-hour minimum) fee applies if the project isn't ready when the inspector arrives.
  • The current codified adopted building codes are the 2018 IBC/IRC/IEBC/IECC/IFC suite (Title 11, Chapter 1, effective January 1, 2021); the county's FY2026 budget references anticipated code books for a 2024 state-adopted update, but that update was not yet codified as of lastVerified — do not assume 2024 editions apply until Title 11, Chapter 1 is amended.
  • Cassia County Zoning and Building Department is located in Room 210 of the Cassia County Courthouse, 1459 Overland Ave., Burley. Hours: Mon–Fri 8:30 AM – 5:00 PM.
  • There is no separate 'commercial building permit' or 'tenant improvement (TI) permit' in unincorporated Cassia County — commercial new construction, additions, and remodels use the SAME Building Permit Application as residential (check 'Commercial' under Item 11: Use), the same Title 11 Chapter 1 building code, and the same square-footage/IBC 2003 Valuation Table 1 fee basis. The only differences are a higher $500 (vs. $200) non-refundable Plan Review fee and, in the Industrial Commercial (IC) zone, a reduced 5-ft interior/rear setback instead of 15-ft (County Code 9-8-2).

Comparable nearby cities

Burley
Both in Cassia County4 shared permit types
Compare fees →