Version history — Unincorporated Cassia County, Idaho
This is PermitBase’s own verified record for Unincorporated Cassia County, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Unincorporated Cassia County’s actual law was at that time.
Permanent link to today’s record
/idaho/cassia-county/unincorporated-cassia/as-of/2026-08-26/
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-15Superseded
- Unincorporated Cassia County, Idaho — EV Charger / EVSE Permit fee record added: State Electrical Permit — Existing Dwelling Unit ($65.00 per inspection)
- Unincorporated Cassia County, Idaho — EV Charger / EVSE Permit fee record removed: State Electrical Permit — Existing Residence / Branch Circuit (homeowner)
- 2026-08-02Superseded
- Unincorporated Cassia County, Idaho — Residential Building Permit (New Construction / Addition) fee record added: Plan Review — Commercial ($500.00)
- 2026-07-20Superseded
- Unincorporated Cassia County, Idaho — Solar Photovoltaic (PV) Permit record added
- Unincorporated Cassia County, Idaho — EV Charger / EVSE Permit record added
- 2026-07-07Initial record — coverage of Unincorporated Cassia County began