How to schedule

Inspections are requested through the building department below.

Address
Cassia County Courthouse, 1459 Overland Ave., Room 210, Burley, ID 83318
Phone
208-878-7302
Office hours
Mon–Fri 8:30 AM – 5:00 PM

Published scheduling rules

  • For inspections, call Building Official Matt Sagers at 208-312-9442 or Building Inspector Ernie Juarez at 208-312-7302. At least six business hours' advance notice is required for inspection requests. (Residential Building Permit (New Construction / Addition))
  • If the project is not ready when the inspector arrives for a scheduled inspection, a $30/hour fee (1-hour minimum) applies. (Residential Building Permit (New Construction / Addition))
  • Schedule inspections at least 6 business hours in advance — a re-inspection or not-ready fee of $30.00/hour (1-hour minimum) applies if the project isn't ready when the inspector arrives. (Solar Photovoltaic (PV) Permit)

Inspection sequence

Applies to: Residential Building Permit (New Construction / Addition)

  1. 1

    Site/Setbacks

    Per IRC R109.1 — verifies compliance with 54 ft road-center setback, 15 ft interior lot line setback for dwellings, 10 ft for accessory buildings

  2. 2

    Footings

    Per IRC 109.3, 109.4, 109.1.5

  3. 3

    Foundation

    Per IRC R109.1.1

  4. 4

    Shear Wall

    Verifies shear wall construction per approved plans

  5. 5

    Rough Framing

    Conducted after State Electrical Rough, Plumbing Rough, and HVAC Rough inspections (IRC R109.4) — coordinate with Idaho DOPL trade inspections first

  6. 6

    Energy

    Energy code compliance per adopted 2018 IECC / Rescheck analysis

  7. 7

    Wall Board

    Verifies wall board/drywall installation prior to closing walls

  8. 8

    Final

    All work complete; required before occupancy per IRC R110.1 — occupying a structure before final inspection can result in revocation of Certificate of Occupancy (IRC R110.5) and violation penalties (IRC R113.4, R114.2)

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Site/Setbacks

    Verifies compliance with road and interior lot line setbacks

  2. 2

    Footings / Foundation

    Required since ADUs must be on a permanent foundation

  3. 3

    Rough Framing

    After State Electrical/Plumbing/HVAC rough inspections (DOPL) are complete

  4. 4

    Final / Occupancy

    Occupancy permit must be issued by the Building Department prior to occupancy of the ADU per County Code 9-9-4 W(3)(d)

Applies to: EV Charger / EVSE Permit

  1. 1

    Electrical Rough/Final (Idaho DBS, state permit)

    Conductor sizing, breaker/panel work, grounding, and EVSE equipment connection verified under the separate state electrical permit — not performed by Cassia County

  2. 2

    Structural/Mounting Final (County, only if applicable)

    Required only if the EV charger installation is paired with new county-permitted construction (carport, garage, accessory structure)

Applies to: Manufactured/Mobile Home Placement Permit

  1. 1

    Site Setback

    Verifies placement complies with road/interior lot line setbacks

  2. 2

    Final

    Final inspection required for placement approval

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Structural/Mounting Final (County)

    Racking attachment, roof penetration sealing, and structural load compliance verified by Cassia County

  2. 2

    Electrical Interconnection (Idaho DBS, separate permit)

    Conduit, disconnects, inverter, and interconnection point verified under the separate state electrical permit

Re-inspection fees

Residential Building Permit (New Construction / Addition)Re-inspection / not-ready-for-inspection fee · Charged if the project is not ready for inspection at the scheduled appointment time; Cassia County Building Permit Application (2025)
$30.00 per hour (1 hour minimum)
Solar Photovoltaic (PV) PermitRe-inspection / not-ready-for-inspection fee · Charged if the project is not ready for inspection at the scheduled appointment time; Cassia County Building Permit Application (2025)
$30.00 per hour (1 hour minimum)

Unincorporated Cassia County building permits

Get alerts for Unincorporated Cassia County

We'll email you when Unincorporated Cassia County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.