Verified 2026-08-02 · Source

How to schedule

Inspections are requested through the building department below.

Address
Cassia County Courthouse, 1459 Overland Ave., Room 210, Burley, ID 83318
Phone
208-878-7302
Office hours
Mon–Fri 8:30 AM – 5:00 PM

Published scheduling rules

  • For inspections, call Building Official Matt Sagers at 208-312-9442 or Building Inspector Ernie Juarez at 208-312-7302. At least six business hours' advance notice is required for inspection requests. (Residential Building Permit (New Construction / Addition))
  • If the project is not ready when the inspector arrives for a scheduled inspection, a $30/hour fee (1-hour minimum) applies. (Residential Building Permit (New Construction / Addition))
  • Schedule inspections at least 6 business hours in advance — a re-inspection or not-ready fee of $30.00/hour (1-hour minimum) applies if the project isn't ready when the inspector arrives. (Solar Photovoltaic (PV) Permit)

Inspection sequence

Applies to: Commercial Building Permit (New Construction, Additions & Remodels / Tenant Improvement)

  1. 1

    Site/Setbacks

    Per IRC R109.1 — verifies compliance with 54 ft road-center setback and interior lot-line setbacks (15 ft generally, 5 ft in the Industrial Commercial (IC) zone)

  2. 2

    Footings

    Per IRC 109.3, 109.4, 109.1.5

  3. 3

    Foundation

    Per IRC R109.1.1

  4. 4

    Shear Wall

    Verifies shear wall construction per approved plans

  5. 5

    Rough Framing

    Conducted after State Electrical Rough, Plumbing Rough, and HVAC Rough inspections (IRC R109.4) — coordinate with Idaho DOPL trade inspections first

  6. 6

    Energy

    Energy code compliance per adopted 2018 IECC / Rescheck analysis

  7. 7

    Wall Board

    Verifies wall board/drywall installation prior to closing walls

  8. 8

    Final

    All work complete; required before occupancy

Applies to: Residential Building Permit (New Construction / Addition)

  1. 1

    Site/Setbacks

    Per IRC R109.1 — verifies compliance with 54 ft road-center setback, 15 ft interior lot line setback for dwellings, 10 ft for accessory buildings

  2. 2

    Footings

    Per IRC 109.3, 109.4, 109.1.5

  3. 3

    Foundation

    Per IRC R109.1.1

  4. 4

    Shear Wall

    Verifies shear wall construction per approved plans

  5. 5

    Rough Framing

    Conducted after State Electrical Rough, Plumbing Rough, and HVAC Rough inspections (IRC R109.4) — coordinate with Idaho DOPL trade inspections first

  6. 6

    Energy

    Energy code compliance per adopted 2018 IECC / Rescheck analysis

  7. 7

    Wall Board

    Verifies wall board/drywall installation prior to closing walls

  8. 8

    Final

    All work complete; required before occupancy per IRC R110.1 — occupying a structure before final inspection can result in revocation of Certificate of Occupancy (IRC R110.5) and violation penalties (IRC R113.4, R114.2)

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Site/Setbacks

    Verifies compliance with road and interior lot line setbacks

  2. 2

    Footings / Foundation

    Required since ADUs must be on a permanent foundation

  3. 3

    Rough Framing

    After State Electrical/Plumbing/HVAC rough inspections (DOPL) are complete

  4. 4

    Final / Occupancy

    Occupancy permit must be issued by the Building Department prior to occupancy of the ADU per County Code 9-9-4 W(3)(d)

Applies to: EV Charger / EVSE Permit

  1. 1

    Electrical Rough/Final (Idaho DBS, state permit)

    Conductor sizing, breaker/panel work, grounding, and EVSE equipment connection verified under the separate state electrical permit — not performed by Cassia County

  2. 2

    Structural/Mounting Final (County, only if applicable)

    Required only if the EV charger installation is paired with new county-permitted construction (carport, garage, accessory structure)

Applies to: Manufactured/Mobile Home Placement Permit

  1. 1

    Site Setback

    Verifies placement complies with road/interior lot line setbacks

  2. 2

    Final

    Final inspection required for placement approval

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Structural/Mounting Final (County)

    Racking attachment, roof penetration sealing, and structural load compliance verified by Cassia County

  2. 2

    Electrical Interconnection (Idaho DBS, separate permit)

    Conduit, disconnects, inverter, and interconnection point verified under the separate state electrical permit

Re-inspection fees

Residential Building Permit (New Construction / Addition)Re-inspection / not-ready-for-inspection fee · Charged if the project is not ready for inspection at the scheduled appointment time; Cassia County Building Permit Application (2025)
$30.00 per hour (1 hour minimum)
Commercial Building Permit (New Construction, Additions & Remodels / Tenant Improvement)Re-inspection / not-ready-for-inspection fee · Charged if the project is not ready for inspection at the scheduled appointment time; Cassia County Building Permit Application (2025) — applies to all permit types, including commercial
$30.00 per hour (1 hour minimum)
Solar Photovoltaic (PV) PermitRe-inspection / not-ready-for-inspection fee · Charged if the project is not ready for inspection at the scheduled appointment time; Cassia County Building Permit Application (2025)
$30.00 per hour (1 hour minimum)

Sources & verification

Verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cassia County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Unincorporated Cassia County building permits

Get alerts for Unincorporated Cassia County

We'll email you when Unincorporated Cassia County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.