Burley building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Burley, Idaho.

Verified 2026-08-21 · Source

How to schedule

Inspections are requested through the building department below.

Address
2020 Park Avenue, Burley, ID 83318
Phone
(208) 647-7086
Office hours
Not published on the City of Burley Building Department page. Contact by phone at (208) 647-7086. Direct inspector lines: Building Inspector Gary (208) 431-5425, Plumbing Inspector Mark (208) 650-1258, Electrical Inspector Floyd (208) 650-1098, HVAC Inspector Gary (208) 431-5425 (per City of Burley Building Permit / Electrical Permit / Plumbing Permit / HVAC Permit application headers). Chief Building Official: Gary Pawson; Department Secretary: Melissa Lee.

Inspection sequence

Applies to: Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement)

  1. 1

    Footings

    Verifies footing dimensions, reinforcement, and forming before the concrete pour; listed as 'Footings' among the inspection types schedulable through the City's iWorQ permit portal.

  2. 2

    Foundation Walls

    Verifies foundation wall placement and reinforcement before backfill; listed as 'Foundation Walls' among the inspection types schedulable through the City's iWorQ permit portal.

  3. 3

    Sewer Tap Inspection

    Applies when the project includes a new sewer connection. The City's Sewer Tapping Standard Procedure requires the contractor to contact the sewer department at least three working days before the connection, and requires a City sewer inspector to inspect the sewer saddle before backfilling and to inspect the sewer line from the main to the building site before it is covered. Listed as 'Sewer - Tap Inspection' among the inspection types schedulable through the City's iWorQ permit portal.

  4. 4

    Water Tap/Backflow Inspection

    Applies when the project includes a new water connection or a backflow-prevention device. Listed as 'Water - Tap/Backflow Inspection' among the inspection types schedulable through the City's iWorQ permit portal; no separate published procedure describing this inspection's steps was found, so confirm requirements with the Water Department.

  5. 5

    Framing

    Verifies structural framing before it is concealed by insulation or drywall; listed as 'Framing' among the inspection types schedulable through the City's iWorQ permit portal.

  6. 6

    Fire Sprinkler/Fire Alarm Rough-In

    Applies only where the project requires a fire sprinkler or fire alarm system, per the Fire Department Plan Review Fee schedule. Listed as 'Fire Sprinkler Rough In' and 'Fire- Fire Alarm Rough' among the inspection types schedulable through the City's iWorQ permit portal.

  7. 7

    Insulation

    Verifies insulation installation before it is concealed by drywall; listed as 'Insulation' among the inspection types schedulable through the City's iWorQ permit portal.

  8. 8

    Final Inspection

    The combined final building inspection required before occupancy; listed as 'Final Inspection' among the inspection types schedulable through the City's iWorQ permit portal.

  9. 9

    Fire Sprinkler/Alarm Final

    Applies only where the project has a fire sprinkler or fire alarm system installed under Fire Department plan review. Listed as 'Fire -Sprinkler and Alarm Final' among the inspection types schedulable through the City's iWorQ permit portal.

  10. 10

    Fire Department Certificate of Occupancy Final

    A Fire Department sign-off tied to certificate-of-occupancy issuance for commercial buildings; Municipal Code 5-14-3 bars any building from being used or changed in use until a certificate of occupancy is issued by the Building Inspector. Listed as 'Fire - Building CO Final' among the inspection types schedulable through the City's iWorQ permit portal.

Re-inspection fees

Building Permit (New / Addition / Alteration / Repair / Roof / Move / Remove)Re-inspection fees assessed under provision 305.8 · City of Burley Master Fee Schedule (Resolution 11-26), 'Building Department' page
$50.00 per hour (two-hour minimum)
Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement)Re-inspection fees assessed under provision 305.8 · City of Burley Master Fee Schedule (Resolution 11-26), 'Building Department' page
$50.00 per hour (two-hour minimum)

Sources & verification

Verified against official sources. Last reviewed 2026-08-21.

Online permit portal

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Burley building permits

Get alerts for Burley

We'll email you when Burley's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.