The City of Cascade has no dedicated EV-charger/EVSE permit type or fee line -- confirmed directly against the City's Schedule of Building and Land Use Fees (FY2022-2023), which itemizes every other special-scope permit (manufactured home, demolition, sign, condemned-building investigation, accessory structure) but contains no EV-charger/EVSE/electric-vehicle entry. Installing electric vehicle charging equipment (e.g., a dedicated 240V Level 2 circuit) is purely electrical work in the typical wall-mounted residential case, and per this file's own solar-pv-permit entry pattern, electrical work in Cascade -- like all of Idaho -- is inspected and permitted by the State of Idaho DOPL (Division of Occupational and Professional Licenses), not the City. A City building permit would only be triggered if the installation involves new structural/accessory work (e.g., a freestanding charging pedestal or new electrical service structure), using the same general valuation-based building-permit process as any other structural addition.

Verified 2026-07-20 · Source

When you need this permit

  • EV charger circuit installation (wall-mounted, existing structure) is electrical work; a Idaho DOPL Electrical Permit is required, filed directly with the State, not the City of Cascade -- DOPL, not the City, inspects electrical work statewide in Idaho
  • A separate City of Cascade building permit is required only if the installation involves new structural work (e.g., a freestanding charging pedestal, new panel enclosure structure, or accessory structure), using the Completed Building Permit Application reviewed under the 2018 IRC/IBC
  • DOPL electrical permit fees for a standard EVSE circuit added to an existing residence ARE precisely captured by a real governing line item: $65.00 flat, per the DOPL Electrical Permit Worksheet's 'Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop' category ($65 fee, one branch circuit included), confirmed by direct read of the fee-schedule PDF on 2026-07-20 -- no distinct EV-charger-named line exists, but this category is the exact match for the scope
  • No City-published EV-charger checklist or process exists as of this review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

DOPL Electrical Permit Worksheet -- Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop (added branch circuit)Idaho DOPL Application for Contractor Permit, Electrical Permit Worksheet (Fee Schedule), Revised 8/17/2022 -- exact governing line item: '$65 fee plus $10 per additional branch circuit... one circuit is included in the $65.00'. This is precisely the scope of a standard dedicated EVSE circuit added to an existing residence. Confirmed by direct read of the DOPL fee-schedule PDF on 2026-07-20.
$65.00
DOPL Electrical Permit Worksheet -- Temporary Construction Services Only (200 amp or less, one location)Idaho DOPL fee schedule -- alternate line item if the EV charger install is classified under this category instead
$65.00
Building Permit Fee (structural scope only, valuation-based)No EV-charger-specific fee line exists in the City's Schedule of Building and Land Use Fees (FY2022-2023) -- confirmed by direct review; a wall-mounted charger with no structural scope would not trigger this City fee at all
Calculated from project valuation per the City's adopted 2018 IBC/IRC fee table, only if new structural work is involved

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Cascade?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection (DOPL)

    Scheduled directly with the Idaho Division of Occupational and Professional Licenses for the EV charger circuit, independent of any City-issued structural permit inspection sequence

See the full Cascade inspection guide — scheduling & re-inspection fees →

Tips

  • For a typical wall-mounted residential EV charger with no new structural work, the only permit needed is the Idaho DOPL Electrical Permit -- the City of Cascade is not the issuing authority for that scope at all.
  • Only involve the City of Cascade Building Department if your installation includes a freestanding charging pedestal or other new structural/accessory work.
  • No fee schedule for ANY Cascade permit type lists an EV-charger line item -- this is consistent with the City's general pattern of not itemizing technology-specific electrical scopes (same gap documented for solar PV in this file).

Frequently asked questions

Cascade requires an ev charger / evse permit for: EV charger circuit installation (wall-mounted, existing structure) is electrical work; a Idaho DOPL Electrical Permit is required, filed directly with the State, not the City of Cascade -- DOPL, not the City, inspects electrical work statewide in Idaho; A separate City of Cascade building permit is required only if the installation involves new structural work (e.g., a freestanding charging pedestal, new panel enclosure structure, or accessory structure), using the Completed Building Permit Application reviewed under the 2018 IRC/IBC; DOPL electrical permit fees for a standard EVSE circuit added to an existing residence ARE precisely captured by a real governing line item: $65.00 flat, per the DOPL Electrical Permit Worksheet's 'Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop' category ($65 fee, one branch circuit included), confirmed by direct read of the fee-schedule PDF on 2026-07-20 -- no distinct EV-charger-named line exists, but this category is the exact match for the scope; No City-published EV-charger checklist or process exists as of this review. If your project isn't listed, confirm with City of Cascade Building Department at (208) 382-4279 before starting work.

No. Cascade has no dedicated EV-charger/EVSE permit type. A typical wall-mounted EV charger circuit is permitted directly through the State of Idaho DOPL (electrical work statewide in Idaho is inspected by the State, not cities), not the City of Cascade. A City building permit would only apply if new structural work is involved.

Cascade does not publish a plan-review timeline for this permit. Contact City of Cascade Building Department at (208) 382-4279 for current turnaround.

You'll need: Idaho DOPL Electrical Permit Application. Depending on your project, Cascade may also ask for: Completed Building Permit Application (structural scope only). See the required-documents checklist on this page for details on each.

Cascade requires 1 inspection(s) for an ev charger / evse permit, in order: State Electrical Inspection (DOPL). Schedule each through City of Cascade Building Department ((208) 382-4279).

Apply through City of Cascade Building Department at 105 South Main Street, Cascade, ID 83611. Phone: (208) 382-4279, email: buildinginspector@cascadeid.us. Office hours: Mon–Fri 8:30 AM – 4:30 PM (per City of Cascade March 2023 newsletter; not independently republished elsewhere on the city site as of verification date). Official information: https://cascadeid.us/city-government/building-department/.

Cascade, Idaho has adopted: 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2018 International Energy Conservation Code (IECC) — 2018 REScheck Energy Certificate required with submittal. Local amendments apply — see the Cascade overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cascade building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare ev charger / evse permit fees across Idaho

Look up this fee in a different city →

Embed this data card →

Related guides

Now live

Build your Cascade project checklist

Describe your project once and get every permit, document, and fee it triggers in Cascade — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →