EV Charger / EVSE Installation Permit in Boise, Idaho

Boise's Residential Electrical Permit fee schedule explicitly lists 'EV outlets' as a covered fixture type under its Single Fixture / Appliance Installation fee table (Table 2-b), giving Boise a real, named, distinct EV charger fee — unlike most jurisdictions, which bill EV chargers only implicitly under a general electrical circuit category. Governed by the 2023 NEC (effective April 26, 2024).

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit (424 – Residential Electrical) required for installation of an EV charger/EVSE outlet in an existing single-family dwelling or duplex
  • Governed by the 2023 NEC, effective in Boise since April 26, 2024
  • Homeowners may self-permit EV charger electrical work on their own primary or secondary residence per Idaho statute (no contractor license required); a mandatory Preliminary Conference inspection applies to homeowner-pulled permits Contractor
  • If the installation also requires a service/panel upgrade, the separate Service Equipment/Panel Change fee tier applies in addition to the fixture fee
  • For NEW single-family/duplex construction, EV charger wiring is typically included within the whole-house New SFD/Duplex electrical permit rather than billed as a separate fixture

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Single fixture / appliance installation (existing residence) — EV outletBoise Electrical Code Fee Schedule, Table 2-b (Apr 2019) — 'EV outlets' is explicitly named alongside electric water heaters, electric fireplaces, and other single-fixture installs as a covered category
$14.00 base + $55 per fixture
Multiple fixtures / addition, alteration, or repair (if EV charger install includes other electrical work under one permit)Boise Electrical Code Fee Schedule, Table 3-a
$110 flat fee
Service equipment / panel change — up to 200 amp (if panel upgrade also needed)Boise Electrical Code Fee Schedule, Table 5-a
$55
Reinspection FeeBoise Electrical Code Fee Schedule
$55

Review timeline

Plan reviewTypical estimate — confirm current times with the Boise building department
~1–10 business days

How long did your EV Charger / EVSE Installation Permit permit actually take in Boise?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Preliminary Conference

    Mandatory for homeowner-pulled permits — troubleshooting session with inspector before work begins

  2. 2

    Final

    EV charger/outlet installed, GFCI/AFCI protection and connections verified per the 2023 NEC

See the full Boise inspection guide — scheduling & re-inspection fees →

Tips

  • Boise is one of the few jurisdictions in this corpus that explicitly names 'EV outlets' as a line item on its own published electrical fee schedule (Table 2-b, $14 base + $55 per fixture) rather than leaving EV chargers to be inferred under a generic circuit category.
  • Idaho state law allows homeowners to pull their own electrical permit for their primary or secondary residence, including EV charger installation — no contractor license required, but a mandatory Preliminary Conference inspection applies. Contractor
  • Boise's electrical fee schedule is dated April 2019 and was reconfirmed still current as of 2026-07-16; a 'Proposed FY27 Electrical Code Fee Schedule' (effective 10-1-26) was posted but not yet adopted as of this file's last verification — confirm current fees with Planning & Development Services at (208) 608-7070.

Frequently asked questions

Boise requires an ev charger / evse installation permit for: Electrical permit (424 – Residential Electrical) required for installation of an EV charger/EVSE outlet in an existing single-family dwelling or duplex; Governed by the 2023 NEC, effective in Boise since April 26, 2024; Homeowners may self-permit EV charger electrical work on their own primary or secondary residence per Idaho statute (no contractor license required); a mandatory Preliminary Conference inspection applies to homeowner-pulled permits; If the installation also requires a service/panel upgrade, the separate Service Equipment/Panel Change fee tier applies in addition to the fixture fee; For NEW single-family/duplex construction, EV charger wiring is typically included within the whole-house New SFD/Duplex electrical permit rather than billed as a separate fixture. If your project isn't listed, confirm with Boise Planning and Development Services — Building Division at (208) 608-7070 before starting work.

Boise's Electrical Code Fee Schedule explicitly lists 'EV outlets' under its Single Fixture / Appliance Installation category: $14.00 base plus $55 per fixture. If a panel upgrade is also needed, an additional Service Equipment fee ($55 up to 200 amp) applies.

Plan review for an ev charger / evse installation permit in Boise typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with Boise Planning and Development Services — Building Division at (208) 608-7070.

You'll need: Electrical Permit Application. Depending on your project, Boise may also ask for: Homeowner Electrical Permit Guide. See the required-documents checklist on this page for details on each.

Boise requires 2 inspection(s) for an ev charger / evse installation permit, in order: Preliminary Conference, Final. Schedule each through Boise Planning and Development Services — Building Division ((208) 608-7070).

Apply through Boise Planning and Development Services — Building Division at 150 N Capitol Blvd, Boise, ID 83702. Phone: (208) 608-7070, email: permits@cityofboise.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM (closed holidays). Official information: https://www.cityofboise.org/departments/planning-and-development-services/building/.

Boise, Idaho has adopted: 2018 International Building Code (IBC) — with Appendices H (Signs) and J (Grading); Mass Timber provisions only of the 2021 IBC; 2018 International Existing Building Code (IEBC); 2018 International Residential Code (IRC), Parts I–IV and IX — with Appendices Q (Tiny Houses) and S (Strawbale Construction); 2018 International Energy Conservation Code (IECC); 2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code, including Chapter 13 – Medical Gas); 2023 National Electrical Code (NEC) — effective April 26, 2024; 2018 International Fire Code (IFC) — with Appendices B, C, D, F and L; 2019 NFPA 13; 2019 NFPA 72; 2018 International Mechanical Code (IMC) — commercial and residential projects with 3+ units; 2018 International Fuel Gas Code (IFGC) — commercial and residential projects with 3+ units; 2018 IRC Parts V and VI — single- and two-family residential mechanical and fuel gas. Local amendments apply — see the Boise overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Boise building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.