Accessory Dwelling Unit (ADU) Permit — Boise, Idaho · Requirements sheet
Verified 2026-07-16 · Source: https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/residential-construction-400/402-b-pre-approved-adu/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Boise, Idaho
Required for construction of a new accessory dwelling unit on a residential property in Boise, including detached cottages, attached additions, and internal conversions. Boise offers a Pre-Approved ADU program (permit type 402-B) with pre-reviewed plan sets to expedite permitting.
Verified 2026-07-16 · Source
When you need this permit
- Property must be zoned to allow an ADU under Boise Zoning Code
- Pre-Approved ADU program (402-B) allows use of Boise-reviewed plan sets — fastest path
- Standard ADU uses the New Residential (402) or Additions/Alterations (406) permit depending on type
- Submit Pre-Approved ADU Submittal Checklist for 402-B program
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Assessed on project valuation per Boise's Building Code Fee Schedule, Table No. Show full citationHide
Assessed on project valuation per Boise's Building Code Fee Schedule, Table No. 1-A (Oct 2023, item 9 for the 20% residential plan review add-on), cited. Confirmed the schedule has no separate ADU-specific fee line — the 402-B Pre-Approved ADU program page (permits.cityofboise.org checklist/apply-online only) and the fee schedule PDF both show new/converted ADUs are billed as standard residential construction under Table 1-A, same as the 402 New Residential Construction permit.Review timeline
Inspection process
- 1
Foundation
Footings and foundation before concrete pour
- 2
Framing
Structural framing, egress windows, fire separation
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Final
All work complete, smoke/CO detectors, address posted, ready for occupancy
See the full Boise inspection guide — scheduling & re-inspection fees →
Tips
- Boise's Pre-Approved ADU program (402-B) offers pre-reviewed plan sets that can significantly reduce plan review time.
- Confirm ADU zoning eligibility through the Boise Zoning Code before applying.
- Trade sub-permits (electrical, plumbing, mechanical) are required separately for ADU construction.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Boise building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Boise's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Boise yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Boise lands. Privacy.
Other permits in Boise
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Boise project checklist
Describe your project once and get every permit, document, and fee it triggers in Boise — in one checklist. Free, for any city and any number of projects.
Get started →