How to schedule
Inspections are requested through the building department below.
- Address
- 150 N Capitol Blvd, Boise, ID 83702
- Phone
- (208) 608-7070
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM (closed holidays)
- Website
- Official site
Published scheduling rules
- Schedule inspections by calling (208) 608-7070 before 7:30 a.m. for same-day service; morning (8 a.m.–noon) and afternoon (1–5 p.m.) slots available. (Residential Building Permit (New Construction))
- Schedule inspections by calling (208) 608-7070 before 7:30 a.m. (Residential Electrical Permit)
- Schedule inspections by calling (208) 608-7070 before 7:30 a.m. for same-day scheduling. (General)
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Footings and foundation before concrete pour
- 2
Framing
Structural framing, egress windows, fire separation
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Final
All work complete, smoke/CO detectors, address posted, ready for occupancy
Applies to: Residential Addition / Alteration Permit
- 1
Framing / Structural
After framing is complete and before walls are covered — verify structure, connections, and blocking
- 2
MEP Rough-In
Electrical, plumbing, and mechanical rough-ins before wall cover — may be separate trade permits
- 3
Insulation
Insulation installed, vapor barrier in place — before drywall
- 4
Final
All work complete per approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation / Footings
Before concrete pour — forms, rebar, anchor bolts verified
- 2
Framing
After framing, sheathing, and rough-in trades — before insulation or wall cover
- 3
Energy / Insulation
Insulation and energy code compliance items before drywall
- 4
Final
All work complete, ready for certificate of occupancy
Applies to: Residential Electrical Permit
- 1
Preliminary Conference
Mandatory for homeowner-pulled permits — troubleshooting session with inspector before work begins
- 2
Rough-In / Permanent Service
After wiring installed, before walls closed — verify conductor sizing, box placement, and service connections
- 3
Final
All devices installed, panel labeled, GFCI/AFCI protection verified
Applies to: Residential Mechanical / HVAC Permit
- 1
Gas Piping Pressure Test
Required before concealing gas piping — verify no leaks under test pressure
- 2
Rough-In
Ductwork and mechanical equipment rough-in before walls closed — verify clearances and support
- 3
Final
Equipment operational, combustion air verified, venting correct, thermostat functional
Applies to: Residential Plumbing Permit
- 1
Underground / Slab Plumbing
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed — pressure test required
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final — Building / Structural
Panel mounting, racking attachment, roof penetration sealing verified
- 3
Final — Electrical
Electrical connections, inverter installation, and interconnection point verified
Applies to: EV Charger / EVSE Installation Permit
- 1
Preliminary Conference
Mandatory for homeowner-pulled permits — troubleshooting session with inspector before work begins
- 2
Final
EV charger/outlet installed, GFCI/AFCI protection and connections verified per the 2023 NEC
Final inspection only: Residential Roofing Permit, Water Heater Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Boise building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Boise building permits
Get alerts for Boise
We'll email you when Boise's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.