Accessory Dwelling Unit (ADU) Permit — Meridian, Idaho · Requirements sheet
Verified 2026-06-29 · Source: https://meridiancity.org/community-development/building/customer-information/residential-checklists/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Meridian, Idaho
Required for construction of a new accessory dwelling unit on a residential property in Meridian. ADUs require planning/zoning approval and a building permit. A dedicated ADU Submittal Checklist and Standards document is available from Meridian Building Services. Apply through the Citizen Access Portal.
Verified 2026-06-29 · Source
When you need this permit
- Planning/zoning approval required — confirm zone allows ADU use (contact Meridian Planning Division at (208) 884-5533)
- Building permit required for all ADU construction
- Submit Residential ADU Submittal Checklist and Standards (available from the Residential Checklists page)
- ACCA-approved Manual J, D, and S load calculations required
- Separate trade permits (electrical, plumbing, mechanical) required
- Apply through the Citizen Access Portal at citizenportal.meridiancity.org
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Construction
Required before any footing work begins
- 2
Foundation
Footings and foundation before concrete pour
- 3
Framing
Structural framing, egress windows, fire separation
- 4
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed — separate trade permits required
- 5
Final
All work complete, smoke/CO detectors, address posted, ready for occupancy
See the full Meridian inspection guide — scheduling & re-inspection fees →
Tips
- Confirm ADU zoning eligibility with the Meridian Planning Division at (208) 884-5533 before applying for a building permit.
- Planning/zoning approval is a required step before the building permit for ADUs.
- The Residential ADU Submittal Checklist and Standards document is available from the Residential Checklists page.
- Separate trade permits (electrical, plumbing, mechanical) are required for ADU construction.
- Manual J, D, and S load calculations from an ACCA-approved software are required.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Meridian building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Meridian
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Meridian project checklist
Describe your project once and get every permit, document, and fee it triggers in Meridian — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →