Skip to main content
PermitBase

Meridian building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Meridian, Idaho.

Verified 2026-06-29 · Source

How to schedule

Inspections are requested through the building department below.

Address
33 E. Broadway Avenue, Suite 102, Meridian, ID 83642
Phone
(208) 887-2211
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Published scheduling rules

  • Schedule inspections online through the Citizen Access Portal or call the inspection line at (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Building Permit (New Construction))
  • Schedule inspections online through the Citizen Access Portal or call (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Addition / Alteration Permit)
  • Schedule inspections online through the Citizen Access Portal or call (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Electrical Permit)
  • Apply through the Citizen Access Portal at citizenportal.meridiancity.org. Schedule inspections the same way. (Residential Plumbing Permit)
  • Call the inspection line at (208) 887-1155 before 8:00 AM for same-day inspection scheduling. (Residential Plumbing Permit)
  • Schedule inspections through the Citizen Access Portal or call (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Mechanical / HVAC Permit)
  • Schedule inspections online through the Citizen Access Portal. For same-day scheduling, call the inspection line at (208) 887-1155 before 8:00 AM. (General)

Inspection sequence

Applies to: Commercial Building Permit (New Construction)

  1. 1

    Pre-Construction

    Kickoff inspection before footing work begins, reviewing required inspections and key contacts for the project

  2. 2

    Foundation / Footings

    Before concrete pour — verify forms, rebar, and anchor bolts per approved structural drawings

  3. 3

    Framing

    Structural framing, sheathing, and fire/life-safety rough-in complete before insulation or wall cover

  4. 4

    Fire Sprinkler / Fire Alarm

    Required if the project includes a fire sprinkler or fire alarm system; inspected under Building Fire Fees, Section 1.5 of the City Fee Schedule

  5. 5

    MEP Rough-In

    Electrical, mechanical, and plumbing rough-in before wall cover — separate trade sub-permits required

  6. 6

    Final

    All work complete per approved plans; Certificate of Occupancy issued after passing (Warranty Surety must be submitted first)

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Pre-Construction

    Required before any footing work begins

  2. 2

    Foundation

    Footings and foundation before concrete pour

  3. 3

    Framing

    Structural framing, egress windows, fire separation

  4. 4

    MEP Rough-In

    Mechanical, electrical, plumbing rough-ins before walls closed — separate trade permits required

  5. 5

    Final

    All work complete, smoke/CO detectors, address posted, ready for occupancy

Applies to: Commercial Tenant Improvement (TI) Permit

  1. 1

    Framing / Structural (if applicable)

    Required only if the TI scope includes structural alterations, demising wall changes, or new framing — before wall cover

  2. 2

    Fire Sprinkler / Fire Alarm (if applicable)

    Required if the TI scope modifies or extends the fire sprinkler or fire alarm system; inspected under Building Fire Fees, Section 1.5 of the City Fee Schedule

  3. 3

    MEP Rough-In

    Electrical, mechanical, and plumbing rough-in before wall cover — separate trade sub-permits required

  4. 4

    Final

    All work complete per approved plans; Certificate of Occupancy or Certificate of Completion issued after passing

Applies to: Residential Building Permit (New Construction)

  1. 1

    Pre-Construction

    Required before any footing work — inspector reviews all required inspections and provides key contact information

  2. 2

    Foundation / Footings

    Before concrete pour — verify forms, rebar, anchor bolts, and that footings extend to frost line (24 inches minimum)

  3. 3

    Framing

    After framing, sheathing, and rough-in trades complete — before insulation or wall cover

  4. 4

    Final

    All work complete per approved plans; certificate of occupancy issued after passing

Applies to: Residential Addition / Alteration Permit

  1. 1

    Framing / Structural

    After framing complete and before walls covered — verify structure, connections, and blocking

  2. 2

    MEP Rough-In

    Electrical, plumbing, and mechanical rough-ins before wall cover — trade sub-permits required separately

  3. 3

    Final

    All work complete per approved plans

Applies to: Residential Mechanical / HVAC Permit

  1. 1

    Gas Piping Pressure Test

    Required before concealing gas piping — verify no leaks under test pressure

  2. 2

    Rough-In

    Ductwork and mechanical equipment rough-in before walls closed — verify clearances and support

  3. 3

    Final

    Equipment operational, combustion air verified, venting correct, thermostat functional

Applies to: Residential Plumbing Permit

  1. 1

    Underground / Slab Plumbing

    Before concrete pour — verify pipe slope, materials, and cleanouts

  2. 2

    Rough-In

    After pipes installed before walls closed — pressure test required

  3. 3

    Final

    All fixtures connected, no leaks, proper venting verified

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing — required per electrical plan review

  2. 2

    Final — Building / Structural

    Panel mounting, racking attachment, roof penetration sealing verified

  3. 3

    Final — Electrical

    Electrical connections, inverter, and interconnection point verified; Idaho Power will be involved in a system test after municipal electrical inspection passes

Applies to: Electric Vehicle Charging Station (EVCS) Permit

  1. 1

    Rough-In

    After wiring/panel work installed, before walls closed — verify conductor sizing, box placement, and service connections

  2. 2

    Final

    Charger installed and operational, panel labeled, GFCI/AFCI protection verified per 2023 NEC

Applies to: Residential Electrical Permit

  1. 1

    Rough-In

    After wiring installed before walls closed — verify conductor sizing, box placement, and service connections

  2. 2

    Final

    All devices installed, panel labeled, GFCI/AFCI protection verified per 2023 NEC

Re-inspection fees

Residential Building Permit (New Construction)Re-inspection Fee · City of Meridian Fee Schedule, Section 1.1, Resolution No. 18-2110
$45 per occurrence (first re-inspection); $90 (double fee for repeat re-inspections)
Residential Addition / Alteration PermitRe-inspection Fee · City of Meridian Fee Schedule, Section 1.1
$45 per occurrence; $90 for repeat re-inspections
Residential Electrical PermitRe-inspection Fee · City of Meridian Fee Schedule, Section 1.2, Resolution No. 18-2110
$45 per occurrence; $90 for double fee (repeated re-inspection)
Residential Plumbing PermitRe-inspection Fee · City of Meridian Fee Schedule, Section 1.4, Resolution No. 18-2110
$45 per occurrence; $90 for double fee (repeated re-inspection)
Residential Mechanical / HVAC PermitRe-inspection Fee · City of Meridian Fee Schedule, Section 1.3, Resolution No. 18-2110
$45 per occurrence; $90 for double fee (repeated re-inspection)
Electric Vehicle Charging Station (EVCS) PermitRe-inspection Fee · City of Meridian Fee Schedule, Section 1.2, Resolution No. 18-2110
$45 per occurrence; $90 for double fee (repeated re-inspection)
Commercial Building Permit (New Construction)Re-inspection Fee · City of Meridian Fee Schedule Web Portal, Section 1.1, Resolution No. 18-2110
$45 per occurrence (first re-inspection); $90 (double fee for repeat re-inspections)
Commercial Tenant Improvement (TI) PermitRe-inspection Fee · City of Meridian Fee Schedule Web Portal, Section 1.1, Resolution No. 18-2110
$45 per occurrence (first re-inspection); $90 (double fee for repeat re-inspections)

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Meridian building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Meridian building permits