Meridian building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Meridian, Idaho.
Verified 2026-06-29 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 33 E. Broadway Avenue, Suite 102, Meridian, ID 83642
- Phone
- (208) 887-2211
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM
- Website
- Official site
Published scheduling rules
- Schedule inspections online through the Citizen Access Portal or call the inspection line at (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Building Permit (New Construction))
- Schedule inspections online through the Citizen Access Portal or call (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Addition / Alteration Permit)
- Schedule inspections online through the Citizen Access Portal or call (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Electrical Permit)
- Apply through the Citizen Access Portal at citizenportal.meridiancity.org. Schedule inspections the same way. (Residential Plumbing Permit)
- Call the inspection line at (208) 887-1155 before 8:00 AM for same-day inspection scheduling. (Residential Plumbing Permit)
- Schedule inspections through the Citizen Access Portal or call (208) 887-1155 before 8:00 AM for same-day scheduling. (Residential Mechanical / HVAC Permit)
- Schedule inspections online through the Citizen Access Portal. For same-day scheduling, call the inspection line at (208) 887-1155 before 8:00 AM. (General)
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Pre-Construction
Required before any footing work begins
- 2
Foundation
Footings and foundation before concrete pour
- 3
Framing
Structural framing, egress windows, fire separation
- 4
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed — separate trade permits required
- 5
Final
All work complete, smoke/CO detectors, address posted, ready for occupancy
Applies to: Residential Building Permit (New Construction)
- 1
Pre-Construction
Required before any footing work — inspector reviews all required inspections and provides key contact information
- 2
Foundation / Footings
Before concrete pour — verify forms, rebar, anchor bolts, and that footings extend to frost line (24 inches minimum)
- 3
Framing
After framing, sheathing, and rough-in trades complete — before insulation or wall cover
- 4
Final
All work complete per approved plans; certificate of occupancy issued after passing
Applies to: Residential Addition / Alteration Permit
- 1
Framing / Structural
After framing complete and before walls covered — verify structure, connections, and blocking
- 2
MEP Rough-In
Electrical, plumbing, and mechanical rough-ins before wall cover — trade sub-permits required separately
- 3
Final
All work complete per approved plans
Applies to: Residential Mechanical / HVAC Permit
- 1
Gas Piping Pressure Test
Required before concealing gas piping — verify no leaks under test pressure
- 2
Rough-In
Ductwork and mechanical equipment rough-in before walls closed — verify clearances and support
- 3
Final
Equipment operational, combustion air verified, venting correct, thermostat functional
Applies to: Residential Plumbing Permit
- 1
Underground / Slab Plumbing
Before concrete pour — verify pipe slope, materials, and cleanouts
- 2
Rough-In
After pipes installed before walls closed — pressure test required
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing — required per electrical plan review
- 2
Final — Building / Structural
Panel mounting, racking attachment, roof penetration sealing verified
- 3
Final — Electrical
Electrical connections, inverter, and interconnection point verified; Idaho Power will be involved in a system test after municipal electrical inspection passes
Applies to: Electric Vehicle Charging Station (EVCS) Permit
- 1
Rough-In
After wiring/panel work installed, before walls closed — verify conductor sizing, box placement, and service connections
- 2
Final
Charger installed and operational, panel labeled, GFCI/AFCI protection verified per 2023 NEC
Applies to: Residential Electrical Permit
- 1
Rough-In
After wiring installed before walls closed — verify conductor sizing, box placement, and service connections
- 2
Final
All devices installed, panel labeled, GFCI/AFCI protection verified per 2023 NEC
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Meridian building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Meridian building permits
Get alerts for Meridian
We'll email you when Meridian's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.