Electric Vehicle (EV) Charger / EVSE Permit — Chubbuck, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://cityofchubbuck.us/wp-content/uploads/2023/05/Chubbuck-Fees.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Chubbuck, Idaho
Chubbuck has no dedicated EV charger/EVSE permit type or fee line item -- confirmed directly against the City's itemized residential electrical fee schedule (Resolution No. 2022-07, Exhibit E), which itemizes rooms, circuits, service amperage, space heaters, and even a distinct 'Residential Solar Panel' line, but contains no EV/EVSE/car-charger line item. An EVSE circuit installation is billed under the City's standard Electrical Permit, itemized per component (base fee plus applicable circuit/service fees).
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for installation, alteration, or repair of an EVSE circuit
- Electrical contractors must provide their State of Idaho (DOPL) contractor license number on the Building Permit Application; the City does not issue a separate city electrical contractor license Contractor
- Billed under the City's itemized residential electrical fee schedule (base fee plus per-circuit and/or service-amperage fees, as applicable) -- no distinct EV/EVSE line item exists
- Apply through the SmartGov portal or using the Residential Electrical Building Permit form
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Prior to covering wiring
- 2
Final
Final electrical inspection prior to energization
See the full Chubbuck inspection guide — scheduling & re-inspection fees →
Tips
- Chubbuck has no distinct EV/EVSE fee line -- unlike solar PV, which carries a genuine, distinct $70.00 'Residential Solar Panel' line item, an EVSE circuit is billed only under the general Electrical Residential Base Fee ($30.00) plus the itemized per-circuit fee ($2.50 each).
- Electrical contractors must present their State of Idaho DOPL contractor license number -- the City does not issue a separate city electrical contractor license. Contractor
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Chubbuck building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Chubbuck
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Idaho →
Look up this fee in a different city →