EV Charger / EVSE Permit in American Falls, Idaho
The City of American Falls does not issue electrical permits — per the City's own Building Department guidance, plumbing, HVAC, and electrical permitting/inspection are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City. A residential EV charger / EVSE installation is electrical work and follows this same state track (permits purchased online at dbs.idaho.gov). DOPL's Contractor Electrical Permit Worksheet has no EV-charger-specific line item, but it does have the applicable general category: adding a branch circuit to an Existing Residence, Modular/Manufactured/Mobile Home, or Detached Shop is billed at a flat $65 (one circuit included) plus $10 per additional branch circuit — this is the category an EV charger circuit addition would fall under.
Verified 2026-07-20 · Source
When you need this permit
- A valid Idaho DOPL electrical permit is required prior to installing an EV charger circuit — purchased online at dbs.idaho.gov, not from the City of American Falls
- Work must comply with the National Electrical Code as adopted by the State of Idaho
- A homeowner may obtain a DOPL Homeowner Electrical Permit for work at their own primary residence, per DOPL's published homeowner permit application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), page 2 of the Contractor Electrical Permit Application… Show full citationHide
Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), page 2 of the Contractor Electrical Permit Application (dopl.idaho.gov/wp-content/uploads/2023/11/ELE-Contractor-Electrical-Permit-Application.pdf) — this is the State's statewide electrical fee mechanism, applicable in American Falls because the City does not run its own electrical permitting program. If the installation instead requires a new/upgraded electrical service, DOPL's 'Other Installations' valuation-based formula would apply instead.Review timeline
Inspection process
- 1
Final Inspection
Charger circuit installed and energized; scheduled directly with DOPL, not the City
See the full American Falls inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply to the City of American Falls for an EV charger permit — like all electrical work here, it is permitted and inspected directly by the Idaho DOPL, not the City. Schedule electrical inspections at (208) 237-2460.
- This mirrors how the City treats plumbing and HVAC work, both of which are also handled entirely by DOPL rather than the City Building Department.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the American Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
American Falls's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for American Falls yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when American Falls lands. Privacy.
Other permits in American Falls
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your American Falls project checklist
Describe your project once and get every permit, document, and fee it triggers in American Falls — in one checklist. Free, for any city and any number of projects.
Get started →