Consolidated Building-Development Permit (New Construction, Additions, Alterations, Repairs, Moving, Demolition, Signs, Grading) — American Falls, Idaho · Requirements sheet
Verified 2026-07-07 · Source: https://cityofamericanfalls.com/building-department/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Consolidated Building-Development Permit (New Construction, Additions, Alterations, Repairs, Moving, Demolition, Signs, Grading) in American Falls, Idaho
The City of American Falls uses a single Consolidated Building-Development Permit Application for all classes of construction work within city limits, including new construction, additions, alterations, repairs, moving a structure, demolition, sign installation, and grading. The applicant checks the applicable 'Class of Work' box on one unified form; the City does not publish separate permit-type applications or separate fee schedules for these work classes. Plumbing, HVAC, and electrical permitting/inspection are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City.
Verified 2026-07-07 · Source
When you need this permit
- Property located within the incorporated areas of the City of American Falls (properties in the City's impact area outside city limits are instead routed to the Power County Building Administrator's office, with fees payable to Power County)
- Legal description or address of the property where work is proposed
- A description of the work proposed (e.g., 'construction of a new dwelling')
- Applicant's name and address
- Builder's name and business address
- One set of plans clearly showing all work on the building and where the building sits on the property
- For new dwellings: one 8.5"x11" site plan, plus foundation, floor, and roof plans, elevations, and braced wall panel requirements per the I.B.C., with cross sections showing construction details
- Estimated fair market value of the completed project (materials, labor, and cost of all work, even owner-performed labor) for permit fee calculation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Concrete (curb, gutter, sidewalk-related)
Inspector will not pour or cover anything up (concrete, curb, gutter, sidewalk) before it is inspected
- 2
Building, Plumbing, and Electrical (as applicable)
Building inspections are scheduled with the City; plumbing, HVAC, and electrical inspections are scheduled directly with the Idaho Division of Occupational and Professional Licenses (DOPL) — Plumbing/HVAC: (208) 238-3359; Electrical: (208) 237-2460
- 3
Final
Once all work (including curb, gutter, and sidewalk) is complete and building, plumbing, and electrical inspections are approved, the inspector performs a final inspection and issues a Certificate of Compliance
See the full American Falls inspection guide — scheduling & re-inspection fees →
Tips
- American Falls uses ONE consolidated application form for all classes of work (grading, new construction, additions, alterations, repairs, moving, demolition, and signs) — there is no separate demolition-permit or sign-permit application or fee schedule published by the City.
- Plumbing, HVAC, and electrical permits and inspections are handled entirely by the State of Idaho DOPL, not the City — schedule those directly at (208) 238-3359 (Plumbing/HVAC) or (208) 237-2460 (Electrical).
- The City's own guidance states plan review 'usually takes between 5 to 10 business days' from receipt, provided no additional information is needed; if the City requests more information, the clock effectively restarts when that information is received.
- Properties within the City's impact area but outside official city limits are NOT permitted by the City — plans and fees are routed to the Power County Building Administrator's office instead, with fees payable to Power County.
- 'Fair market value' for permit fee calculation includes the cost of all materials and labor to complete the project, even if the owner intends to perform the labor themselves — it is not simply the price of the lot.
- A building permit expires (is void) if work is not commenced within 180 days of approval, or if commenced work is abandoned for 180 days at any point before completion; a development permit's vested right for the approved land use lasts two years.
- Inspections must be requested by calling (208) 226-2569; inspections requested after 4:00 p.m. are performed the following business day. The inspection card and a copy of the building/water/sewer permit must be left on-site, signed by each inspector, before work covered by that inspection may proceed.
- Do not mark up plans already approved by the City if project changes occur — a new, revised set of plans must be submitted and approved before continuing work on the changed portion.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the American Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in American Falls
Look up this fee in a different city →
Now live
Build your American Falls project checklist
Describe your project once and get every permit, document, and fee it triggers in American Falls — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →