Blackfoot has no separate EV charger/EVSE permit category. The City's own Permits & Applications page states unambiguously: 'All HVAC, Electrical and Plumbing permit applications are acquired through the State of Idaho at https://dbs.idaho.gov/permits/' -- this resolves the routing question in favor of the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City. An EV charging circuit is billed under DOPL's published Electrical Permit Worksheet (Fee Schedule), 'Existing Residence' category, since it is added wiring to an existing dwelling rather than new construction.

Verified 2026-07-20 · Source

When you need this permit

  • A new dedicated circuit or hardwired connection for an EV charging station is electrical work; per the City of Blackfoot's own published routing statement ('acquired through the State of Idaho'), electrical permit applications for work within city limits are obtained through DOPL (purchased online at dbs.idaho.gov), not the City Building Department
  • No EV/EVSE-specific permit category or fee line was found published by DOPL
  • The City's own Fee Schedule (Resolution No. 425, effective 10/01/2025) separately lists a City-charged Electrical Permit fee table (temporary service $40, residential services $80/dwelling unit + $5/room), but the City's own Permits & Applications page is explicit that electrical permit applications go through the State -- so the DOPL fee schedule is treated as governing here
  • DOPL administers statewide electrical contractor/tradesperson licensing regardless of which entity issues the permit itself

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Existing Residence / Modular, Manufactured or Mobile Home / Detached Shop (EV charger circuit added to an existing dwelling)State of Idaho DOPL, Electrical Permit Worksheet (Fee Schedule), Revised 8/17/2022 -- attached to the DOPL Homeowner Permit Application (dopl.idaho.gov/wp-content/uploads/2023/11/ELE-Home-Owner-Electrical-Permit-Application.pdf); no EV/EVSE-specific fee line found, this is the closest-fit published category for added circuit work on an existing home
$65.00 fee plus $10.00 per additional branch circuit (one circuit included in the $65.00)
City of Blackfoot Fee Schedule Electrical Permit table (superseded for this scope by the City's own DOPL-routing statement, listed for reference only)City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025) -- the City's own Permits & Applications page states electrical permits go through the State of Idaho, so this City table is not treated as the governing figure for electrical work
Residential services $80/dwelling unit + $5/room; temporary service $40

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Installation Permit permit actually take in Blackfoot?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Blackfoot inspection guide — scheduling & re-inspection fees →

    Tips

    • Blackfoot's own Permits & Applications page confirms electrical permits (including an EV charger circuit) are obtained through the State of Idaho DOPL, purchased online at dbs.idaho.gov -- not through the City. DOPL's published fee for adding a circuit to an existing home is $65 plus $10 per additional branch circuit.

    Frequently asked questions

    Yes. Per the City's own Permits & Applications page, electrical permit applications (including an EV charger circuit) are obtained through the State of Idaho DOPL, not the City. DOPL's Electrical Permit Worksheet prices a circuit added to an existing residence at $65.00 plus $10.00 per additional branch circuit.

    In Blackfoot, the published Existing Residence / Modular, Manufactured or Mobile Home / Detached Shop (EV charger circuit added to an existing dwelling) is: $65.00 fee plus $10.00 per additional branch circuit (one circuit included in the $65.00). Additional published fees: City of Blackfoot Fee Schedule Electrical Permit table (superseded for this scope by the City's own DOPL-routing statement, listed for reference only) — Residential services $80/dwelling unit + $5/room; temporary service $40. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Blackfoot does not publish a plan-review timeline for this permit. Contact City of Blackfoot Building & Safety Department (Building Department) at (208) 812-4198 (Building & Safety Department); (208) 785-8600 opt 3 (Planning & Zoning Department, for permit application requests); (208) 785-8602 (fax, per Residential Building Permit Application form) for current turnaround.

    You'll need: State of Idaho DOPL Electrical Permit Application (Homeowner or Contractor). See the required-documents checklist on this page for details on each.

    Apply through City of Blackfoot Building & Safety Department (Building Department) at 157 North Broadway, Blackfoot, ID 83221. Phone: (208) 812-4198 (Building & Safety Department); (208) 785-8600 opt 3 (Planning & Zoning Department, for permit application requests); (208) 785-8602 (fax, per Residential Building Permit Application form), email: cclark@cityofblackfoot.org (Chase Clark, Building Official); mmyler@cityofblackfoot.org (Misty Myler, Building Permit Technician). Official information: https://www.cityofblackfoot.org/236/Building-Safety-Department.

    Blackfoot, Idaho has adopted: Blackfoot Municipal Code 10-1-1 ('Administrative Code Adopted; Building Department Established') adopts 'the administrative code, current edition as adopted by the state ... published by the International Conference Of Building Officials,' for administration, organization, and enforcement of the technical codes governing site preparation and construction within the city. (2003 Code sec 4-01-01; amd. 2012 Code). Source: Blackfoot Municipal Code 10-1-1, American Legal Publishing (codelibrary.amlegal.com/codes/blackfootid/latest/blackfoot_id/0-0-0-4456).; Blackfoot Municipal Code 10-2-1 ('Building And Residential Codes Adopted') adopts 'the building code, current edition as adopted by the state ... published by the International Conference Of Building Officials' (excepting automatic sprinkler system requirements for 3- and 4-unit Group R buildings) and 'the residential code, current edition as adopted by the state,' as the city's code governing erection, construction, alteration, repair, demolition, occupancy, and permitting of all buildings and structures in the city. (2003 Code sec 4-02-01; amd. 2012 Code). Source: Blackfoot Municipal Code 10-2-1, American Legal Publishing (codelibrary.amlegal.com/codes/blackfootid/latest/blackfoot_id/0-0-0-4470).; Both codified sections tie the city's adopted building/residential code editions to whatever edition 'is adopted by the state' at any given time (i.e., the Idaho Building Code Board / DOPL Building Safety Program's statewide-adopted IBC/IRC cycle under the Idaho Building Code Act, Idaho Code Title 39, Chapter 41), rather than freezing a specific year in the municipal code text itself. No City of Blackfoot source was found stating a specific current IBC/IRC/IECC edition year independent of this 'as adopted by the state' language.; The City's own Residential Building Permit Application / Residential Plan Review Checklist (PDF, cityofblackfoot.org/DocumentCenter/View/89) states plans are to be designed to the '2012 IRC Code & 2012 IECC (with Idaho amendments)' -- however this document appears to be a reused/adapted template (it also references 'Twin Falls Highway District,' 'SUI zone,' and 'Twin Falls' designated flood plain areas,' which are not Blackfoot or Bingham County features), so its cited 2012 IRC/IECC edition year is treated as potentially stale/templated rather than authoritative, and is superseded per Municipal Code 10-2-1's 'current edition as adopted by the state' language. Flagged rather than relied upon for the codesAdopted edition year. Source: City of Blackfoot Residential Building Permit Application (PDF).; Idaho Division of Occupational and Professional Licenses (DOPL), Building Safety Program, administers the statewide building code framework (Idaho Building Code Act, Idaho Code Title 39, Chapter 41) and issues HVAC/mechanical, electrical, and plumbing permits directly for jurisdictions that have not assumed those trades locally. Source: DOPL Building Safety Program overview (dopl.idaho.gov/bld/). [2026-07-16 liveness re-check: the previously-cited 'DOPL Permits portal' at dbs.idaho.gov/permits/ no longer resolves to a permits page -- curl confirms it now 302-redirects to the bare dopl.idaho.gov homepage (not a specific permits/services page), consistent with DOPL's dbs.idaho.gov-to-dopl.idaho.gov domain migration. The live current pages for purchasing Electrical, HVAC, and Plumbing permits are dopl.idaho.gov/ele/, dopl.idaho.gov/hvac/, and dopl.idaho.gov/plb/ respectively, each carrying a 'Purchase a[n] [Trade] Permit' button linking to DOPL's shared ArcGIS-based online permit tool (idaho.maps.arcgis.com/apps/instant/sidebar/index.html?appid=c568d3c03d5f43f0841dcfa9c2a9537e). All three trade pages and the tool's landing shell were fetched live and returned HTTP 200 on 2026-07-16; the ArcGIS tool itself is a JavaScript-rendered app whose internal interactive content could not be verified via curl.]; The City of Blackfoot's own Permits & Applications page states verbatim: 'All HVAC, Electrical and Plumbing permit applications are acquired through the State of Idaho at https://dbs.idaho.gov/permits/.' This directly confirms the prior research's claim that Blackfoot routes mechanical (HVAC), electrical, and plumbing permitting to the state DOPL system rather than self-administering those trades -- the City issues and reviews only the Building Permit (and related general permits: demolition, retaining wall, mobile home block-set, roof repair, fence) itself. Source: City of Blackfoot Permits & Applications page (cityofblackfoot.org/166/Permits-Applications). [2026-07-16 note: this is an accurate quote of the City's own page, but the URL it cites (dbs.idaho.gov/permits/) is itself now dead -- see the live DOPL replacement pages noted in the codesAdopted entry above.]; CONFLICT NOTE (flagged, not resolved by inference): The City of Blackfoot's own Fee Schedule (Resolution No. 425, effective October 1, 2025) contains detailed 'MECHANICAL PERMITS,' 'ELECTRICAL PERMITS,' and 'PLUMBING PERMITS' fee sections with itemized city-charged fees for HVAC units, gas lines, residential/commercial electrical services, and residential/commercial plumbing -- which appears to directly contradict the Permits & Applications page's statement that all HVAC/electrical/plumbing permit applications are 'acquired through the State of Idaho.' Both documents are official City of Blackfoot publications and both were independently verified to resolve/load. This file does not guess which document is authoritative or stale; it reports the Permits & Applications page's explicit routing statement as the department's self-described intake process (consistent with the prior research finding), while separately publishing the Fee Schedule's mechanical/electrical/plumbing fee tables as-is as City-published figures, and flags this discrepancy for a human to resolve with the Building & Safety Department directly at (208) 812-4198. Sources: City of Blackfoot Fee Schedule, Resolution No. 425 (PDF, cityofblackfoot.org/DocumentCenter/View/2021/City-of-Blackfoot-Fee-Schedule-10-01-2025); City of Blackfoot Permits & Applications page (cityofblackfoot.org/166/Permits-Applications).; IRC Section 602.10 (wall bracing) compliance is explicitly required per the City's Residential Building Permit Application: 'All structures are required to be compliant with IRC section 602.10 for wall bracing... Any walls exceeding 10 feet tall are not prescriptive wall bracing and are required to be engineered for shear.' Source: City of Blackfoot Residential Building Permit Application (PDF).. Local amendments apply — see the Blackfoot overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Blackfoot building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.