Skip to main content
PermitBase

Electrical / Mechanical (HVAC) / Plumbing Permit -- Routed to State of Idaho DOPL in Blackfoot, Idaho

Per the City of Blackfoot's own Permits & Applications page, electrical, mechanical (HVAC), and plumbing permit applications within Blackfoot city limits are acquired directly through the State of Idaho Division of Occupational and Professional Licenses (DOPL) Building Safety Program, not through the City Building Department. This entry documents the state-level routing and the itemized City fee tables that appear (per a flagged, unresolved conflict) in the City's own Fee Schedule for these same trades.

Verified 2026-07-16 · Source

When you need this permit

  • Electrical, mechanical (HVAC/gas line), and plumbing permit applications for work in Blackfoot are obtained through the State of Idaho, per the City's own published statement (the City cites https://dbs.idaho.gov/permits/, which as of 2026-07-16 redirects to the DOPL homepage rather than a working permits page; the current live pages are https://dopl.idaho.gov/ele/, https://dopl.idaho.gov/hvac/, and https://dopl.idaho.gov/plb/, each with a 'Purchase a Permit' link to DOPL's shared online permit tool)
  • DOPL administers statewide contractor/tradesperson licensing and, per this routing, permit issuance/plan review/inspection for these three trades within Blackfoot
  • CONFLICT: the City of Blackfoot's own Fee Schedule (Resolution No. 425, effective 10/01/2025) separately lists detailed City-charged fee tables for Mechanical Permits (gas lines, HVAC units, residential $80/dwelling unit + $15/HVAC unit, commercial/industrial $80 + percentage of installation cost), Electrical Permits (temporary service $40, residential services $80/dwelling unit + $5/room, commercial/industrial $80 + percentage of cost, motor/generator/welder circuits by horsepower, electric signs), and Plumbing Permits (water/sewer lines $47/inspection, water heaters $47/inspection, residential $80/dwelling unit + $5/fixture, commercial/industrial $40 + percentage of cost) -- confirm directly with the Building & Safety Department at (208) 812-4198 whether the City has since assumed some or all of these trades, whether these fee tables are legacy/unused, or whether some subset of work (e.g., permits issued in conjunction with a City building permit) is still City-administered notwithstanding the general DOPL-routing statement

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State of Idaho DOPL Electrical/Mechanical/Plumbing Permit FeesPer City of Blackfoot Permits & Applications page routing statement; DOPL fee schedule available at dopl.idaho.gov/bld/bld-building-fees-calculator/
Not published by the City; see DOPL Building Fees Calculator
City of Blackfoot Fee Schedule Mechanical/Electrical/Plumbing tables (flagged conflict, not confirmed currently applicable)City of Blackfoot Fee Schedule, Resolution No. 425 (effective 10/01/2025) -- listed here for completeness given it is a genuine City-published figure, but its applicability is unresolved against the City's own DOPL-routing statement
See itemized figures in codesAdopted conflict note and localAmendments

Review timeline

Plan review
Not published — contact the department

How long did your Electrical / Mechanical (HVAC) / Plumbing Permit -- Routed to State of Idaho DOPL permit actually take in Blackfoot?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Blackfoot inspection guide — scheduling & re-inspection fees →

    Tips

    • This is the single most important open question in this file: two official City of Blackfoot web sources make apparently contradictory statements about who administers electrical/mechanical/plumbing permitting. Do not treat either the DOPL-routing statement or the City fee tables as conclusively resolving the other -- verify directly with the Building & Safety Department before advising a permit applicant.

    Frequently asked questions

    Blackfoot requires an electrical / mechanical (hvac) / plumbing permit -- routed to state of idaho dopl for: Electrical, mechanical (HVAC/gas line), and plumbing permit applications for work in Blackfoot are obtained through the State of Idaho, per the City's own published statement (the City cites https://dbs.idaho.gov/permits/, which as of 2026-07-16 redirects to the DOPL homepage rather than a working permits page; the current live pages are https://dopl.idaho.gov/ele/, https://dopl.idaho.gov/hvac/, and https://dopl.idaho.gov/plb/, each with a 'Purchase a Permit' link to DOPL's shared online permit tool); DOPL administers statewide contractor/tradesperson licensing and, per this routing, permit issuance/plan review/inspection for these three trades within Blackfoot; CONFLICT: the City of Blackfoot's own Fee Schedule (Resolution No. 425, effective 10/01/2025) separately lists detailed City-charged fee tables for Mechanical Permits (gas lines, HVAC units, residential $80/dwelling unit + $15/HVAC unit, commercial/industrial $80 + percentage of installation cost), Electrical Permits (temporary service $40, residential services $80/dwelling unit + $5/room, commercial/industrial $80 + percentage of cost, motor/generator/welder circuits by horsepower, electric signs), and Plumbing Permits (water/sewer lines $47/inspection, water heaters $47/inspection, residential $80/dwelling unit + $5/fixture, commercial/industrial $40 + percentage of cost) -- confirm directly with the Building & Safety Department at (208) 812-4198 whether the City has since assumed some or all of these trades, whether these fee tables are legacy/unused, or whether some subset of work (e.g., permits issued in conjunction with a City building permit) is still City-administered notwithstanding the general DOPL-routing statement. If your project isn't listed, confirm with City of Blackfoot Building & Safety Department (Building Department) at (208) 812-4198 (Building & Safety Department); (208) 785-8600 opt 3 (Planning & Zoning Department, for permit application requests); (208) 785-8602 (fax, per Residential Building Permit Application form) before starting work.

    In Blackfoot, the published State of Idaho DOPL Electrical/Mechanical/Plumbing Permit Fees is: Not published by the City; see DOPL Building Fees Calculator. Additional published fees: City of Blackfoot Fee Schedule Mechanical/Electrical/Plumbing tables (flagged conflict, not confirmed currently applicable) — See itemized figures in codesAdopted conflict note and localAmendments. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Blackfoot does not publish a plan-review timeline for this permit. Contact City of Blackfoot Building & Safety Department (Building Department) at (208) 812-4198 (Building & Safety Department); (208) 785-8600 opt 3 (Planning & Zoning Department, for permit application requests); (208) 785-8602 (fax, per Residential Building Permit Application form) for current turnaround.

    You'll need: State of Idaho DOPL Electrical/Mechanical/Plumbing Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Blackfoot Building & Safety Department (Building Department) at 157 North Broadway, Blackfoot, ID 83221. Phone: (208) 812-4198 (Building & Safety Department); (208) 785-8600 opt 3 (Planning & Zoning Department, for permit application requests); (208) 785-8602 (fax, per Residential Building Permit Application form), email: cclark@cityofblackfoot.org (Chase Clark, Building Official); mmyler@cityofblackfoot.org (Misty Myler, Building Permit Technician). Official information: https://www.cityofblackfoot.org/236/Building-Safety-Department.

    Blackfoot, Idaho has adopted: Blackfoot Municipal Code 10-1-1 ('Administrative Code Adopted; Building Department Established') adopts 'the administrative code, current edition as adopted by the state ... published by the International Conference Of Building Officials,' for administration, organization, and enforcement of the technical codes governing site preparation and construction within the city. (2003 Code sec 4-01-01; amd. 2012 Code). Source: Blackfoot Municipal Code 10-1-1, American Legal Publishing (codelibrary.amlegal.com/codes/blackfootid/latest/blackfoot_id/0-0-0-4456).; Blackfoot Municipal Code 10-2-1 ('Building And Residential Codes Adopted') adopts 'the building code, current edition as adopted by the state ... published by the International Conference Of Building Officials' (excepting automatic sprinkler system requirements for 3- and 4-unit Group R buildings) and 'the residential code, current edition as adopted by the state,' as the city's code governing erection, construction, alteration, repair, demolition, occupancy, and permitting of all buildings and structures in the city. (2003 Code sec 4-02-01; amd. 2012 Code). Source: Blackfoot Municipal Code 10-2-1, American Legal Publishing (codelibrary.amlegal.com/codes/blackfootid/latest/blackfoot_id/0-0-0-4470).; Both codified sections tie the city's adopted building/residential code editions to whatever edition 'is adopted by the state' at any given time (i.e., the Idaho Building Code Board / DOPL Building Safety Program's statewide-adopted IBC/IRC cycle under the Idaho Building Code Act, Idaho Code Title 39, Chapter 41), rather than freezing a specific year in the municipal code text itself. No City of Blackfoot source was found stating a specific current IBC/IRC/IECC edition year independent of this 'as adopted by the state' language.; The City's own Residential Building Permit Application / Residential Plan Review Checklist (PDF, cityofblackfoot.org/DocumentCenter/View/89) states plans are to be designed to the '2012 IRC Code & 2012 IECC (with Idaho amendments)' -- however this document appears to be a reused/adapted template (it also references 'Twin Falls Highway District,' 'SUI zone,' and 'Twin Falls' designated flood plain areas,' which are not Blackfoot or Bingham County features), so its cited 2012 IRC/IECC edition year is treated as potentially stale/templated rather than authoritative, and is superseded per Municipal Code 10-2-1's 'current edition as adopted by the state' language. Flagged rather than relied upon for the codesAdopted edition year. Source: City of Blackfoot Residential Building Permit Application (PDF).; Idaho Division of Occupational and Professional Licenses (DOPL), Building Safety Program, administers the statewide building code framework (Idaho Building Code Act, Idaho Code Title 39, Chapter 41) and issues HVAC/mechanical, electrical, and plumbing permits directly for jurisdictions that have not assumed those trades locally. Source: DOPL Building Safety Program overview (dopl.idaho.gov/bld/). [2026-07-16 liveness re-check: the previously-cited 'DOPL Permits portal' at dbs.idaho.gov/permits/ no longer resolves to a permits page -- curl confirms it now 302-redirects to the bare dopl.idaho.gov homepage (not a specific permits/services page), consistent with DOPL's dbs.idaho.gov-to-dopl.idaho.gov domain migration. The live current pages for purchasing Electrical, HVAC, and Plumbing permits are dopl.idaho.gov/ele/, dopl.idaho.gov/hvac/, and dopl.idaho.gov/plb/ respectively, each carrying a 'Purchase a[n] [Trade] Permit' button linking to DOPL's shared ArcGIS-based online permit tool (idaho.maps.arcgis.com/apps/instant/sidebar/index.html?appid=c568d3c03d5f43f0841dcfa9c2a9537e). All three trade pages and the tool's landing shell were fetched live and returned HTTP 200 on 2026-07-16; the ArcGIS tool itself is a JavaScript-rendered app whose internal interactive content could not be verified via curl.]; The City of Blackfoot's own Permits & Applications page states verbatim: 'All HVAC, Electrical and Plumbing permit applications are acquired through the State of Idaho at https://dbs.idaho.gov/permits/.' This directly confirms the prior research's claim that Blackfoot routes mechanical (HVAC), electrical, and plumbing permitting to the state DOPL system rather than self-administering those trades -- the City issues and reviews only the Building Permit (and related general permits: demolition, retaining wall, mobile home block-set, roof repair, fence) itself. Source: City of Blackfoot Permits & Applications page (cityofblackfoot.org/166/Permits-Applications). [2026-07-16 note: this is an accurate quote of the City's own page, but the URL it cites (dbs.idaho.gov/permits/) is itself now dead -- see the live DOPL replacement pages noted in the codesAdopted entry above.]; CONFLICT NOTE (flagged, not resolved by inference): The City of Blackfoot's own Fee Schedule (Resolution No. 425, effective October 1, 2025) contains detailed 'MECHANICAL PERMITS,' 'ELECTRICAL PERMITS,' and 'PLUMBING PERMITS' fee sections with itemized city-charged fees for HVAC units, gas lines, residential/commercial electrical services, and residential/commercial plumbing -- which appears to directly contradict the Permits & Applications page's statement that all HVAC/electrical/plumbing permit applications are 'acquired through the State of Idaho.' Both documents are official City of Blackfoot publications and both were independently verified to resolve/load. This file does not guess which document is authoritative or stale; it reports the Permits & Applications page's explicit routing statement as the department's self-described intake process (consistent with the prior research finding), while separately publishing the Fee Schedule's mechanical/electrical/plumbing fee tables as-is as City-published figures, and flags this discrepancy for a human to resolve with the Building & Safety Department directly at (208) 812-4198. Sources: City of Blackfoot Fee Schedule, Resolution No. 425 (PDF, cityofblackfoot.org/DocumentCenter/View/2021/City-of-Blackfoot-Fee-Schedule-10-01-2025); City of Blackfoot Permits & Applications page (cityofblackfoot.org/166/Permits-Applications).; IRC Section 602.10 (wall bracing) compliance is explicitly required per the City's Residential Building Permit Application: 'All structures are required to be compliant with IRC section 602.10 for wall bracing... Any walls exceeding 10 feet tall are not prescriptive wall bracing and are required to be engineered for shear.' Source: City of Blackfoot Residential Building Permit Application (PDF).. Local amendments apply — see the Blackfoot overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Blackfoot building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.