Manufactured Home Permit — Cascade, Idaho · Requirements sheet
Verified 2026-07-08 · Source: https://cascadeid.us/wp-content/uploads/2023/05/Schedule-of-Building-and-Land-Use-Fees-2022-2023.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Manufactured Home Permit in Cascade, Idaho
Required for placement of manufactured homes within the City of Cascade, whether on a permanent foundation or a block set. Landing and stairs at all exits must comply with the 2018 IRC and IBC.
Verified 2026-07-08 · Source
When you need this permit
- Permanent-set manufactured homes require excavation, footing, foundation, and final inspections
- Block-set manufactured homes require excavation and final inspection
- Landing and stairs required at all exits per the 2018 IRC and IBC
- Electrical, plumbing, and HVAC must be signed off by State (DOPL) inspectors before the City's final inspection
- Additions such as porches must be freestanding and not rely on the manufactured home for support or stability, and must be designed and constructed per the 2018 IRC/IBC and City ordinance/zoning codes
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Excavation
Required for both permanent-set and block-set manufactured homes
- 2
Footing
Required for permanent-set manufactured homes only
- 3
Foundation
Required for permanent-set manufactured homes only
- 4
Final
Electrical, plumbing, and HVAC must be signed off by State Inspectors before the City's final inspection; required for both permanent-set and block-set homes
See the full Cascade inspection guide — scheduling & re-inspection fees →
Tips
- Block-set manufactured homes need fewer inspections (excavation + final only) than permanent-set homes (excavation, footing, foundation, and final).
- Any porch or addition attached to a manufactured home must be freestanding and independently supported — it cannot rely on the manufactured home structure.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cascade building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cascade
Manufactured Home Permit in other cities
Compare manufactured home permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Cascade project checklist
Describe your project once and get every permit, document, and fee it triggers in Cascade — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →